W DOC AIRBUS | AMM A320F

Operational Test of the Razor Supply System


TASK 25-44-00-710-001-A
Operational Test of the Razor Supply System


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
MULTIMETER - STANDARD
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-44-00-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-44-00-865-052-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
2000VULIGHT-LAV1LQJ01
** ON A/C NOT FOR ALL
2001VULAV SHAVER SOCKET1MTB01
4. Procedure
Subtask 25-44-00-710-050-A
A. Operational Test of the Razor Supply System
   (1) Do the test of the razor supply system:
NOTE: The test is the same for all lavatories.
ACTION
RESULT
In the related lavatory:
-Connect the MULTIMETER - STANDARD to the razor outlets.
At the razor outlets:
- The multimeter shows 110/220+15-5 VAC, 60Hz.
   (2) Disconnect the multimeter from the razor outlets.
5. Close-up
Subtask 25-44-00-862-050-A
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:35:35 UTC