W DOC AIRBUS | AMM A320F

Replacement of the Flap of the Vacuum Cleaner Socket


TASK 25-23-45-960-802-A
Replacement of the Flap of the Vacuum Cleaner Socket


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05EML7)
Epoxy Adhesive-- - Legacy 3
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-45-000-002-A
Removal of the Door Frame Linings from the Right Forward Passenger/Crew Door
TASK 25-23-45-000-003-A
Removal of the Door Frame Linings from the Left Aft Passenger/Crew Door
TASK 25-23-45-400-007-A
Installation of the Door Frame Linings on the Right Forward Passenger/Crew Door
TASK 25-23-45-400-008-A
Installation of the Door Frame Linings on the Left Aft Passenger/Crew Door
3. Job Set-up
Subtask 25-23-45-861-056-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-23-45-010-056-A
B. Get Access
   (1) If necessary, remove the door frame lining (Ref. AMM TASK 25-23-45-000-002) and/or (Ref. AMM TASK 25-23-45-000-003).
4. Procedure
Subtask 25-23-45-960-051-A
A. Replacement of the Flap of the Vacuum Cleaner Socket
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
   (1) Remove the flap of the vacuum cleaner socket:
     (a) Remove the screws (9), the nuts (7), the washers (8) and the flap (6) with the support (5).
   (2) If necessary, remove the hinge of the vacuum cleaner socket:
     (a) Remove the screws (4), the nuts (1), the washers (2) and the hinge (3).

   (3) If removed, install the hinge of the vacuum cleaner socket:
     (a) Put the hinge (3) and the washers (2) in position and install the screws (4) and the nuts (1).
   (4) Install the flap of the vacuum cleaner socket:
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
     (a) If necessary, apply Epoxy Adhesive-- - Legacy 3 (Material No.05EML7) to the support (5) and put it in position on the flap (6).
     (b) Put the support (5) with the flap (6) in position on the hinge (3).
     (c) Put the washers (8) in position and install the screws (9) and the nuts (7).
5. Close-up
Subtask 25-23-45-410-057-A
A. If removed, install the door frame lining (Ref. AMM TASK 25-23-45-400-007) and/or (Ref. AMM TASK 25-23-45-400-008).
Subtask 25-23-45-862-055-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:31:26 UTC