Apply Temporary Protection to End Fittings of Electrical Conduits in Vertical Stabilizer Leading Edge
TASK 24-92-00-210-012-A
Apply Temporary Protection to End Fittings of Electrical Conduits in Vertical Stabilizer Leading Edge
Refer to the MPD TASK: 240000-15
APPLY TEMPORARY PROTECTION TO END FITTINGS OF ELECTRICAL CONDUITS IN VERTICAL STABILIZER LEADING EDGE
Apply temporary protection to end fittings of electrical conduits in vertical stabilizer leading-edge.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 24-92-00-862-061-A Subtask 24-92-00-869-073-A Subtask 24-92-00-010-061-A
Subtask 24-92-00-210-061-A
Subtask 24-92-00-410-062-A
[Rev.10 from 2021]
2026.03.31 23:25:48 UTC
Apply Temporary Protection to End Fittings of Electrical Conduits in Vertical Stabilizer Leading Edge
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN THE REFERENCED PROCEDURES.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 240000-15
APPLY TEMPORARY PROTECTION TO END FITTINGS OF ELECTRICAL CONDUITS IN VERTICAL STABILIZER LEADING EDGE
Apply temporary protection to end fittings of electrical conduits in vertical stabilizer leading-edge.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE |
| No specific | AR | BRUSH - BRISTLED |
| No specific | AR | SPRAY - BOTTLE, PUMP TYPE (NON AEROSOL) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ACB1) | Corrosion Preventive Compound-Heavy Duty Hard Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 321 | DORSAL FIN |
| 322 | VERTICAL STABILIZER LEADING EDGE |
| 324 | VERTICAL STABILIZER TIP |
| 321AL, 322BL, 324AT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-34-24-869-002-A | Aircraft Grounding (Earthing) for the Maintenance Operations |
| TASK 12-34-24-869-002-A-01 | Aircraft Grounding (Earthing) during Transit, Turnaround or Overnight Stop |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-45-11-000-001-A | Removal of the Dorsal Fin |
| TASK 53-45-11-400-001-A | Installation of the Dorsal Fin |
| TASK 55-34-11-000-001-A | Removal of the Vertical Stabilizer Tip |
| TASK 55-34-11-400-001-A | Installation of the Vertical Stabilizer Tip |
| ESPM 203330 | |
Subtask 24-92-00-862-061-A Subtask 24-92-00-869-073-A Subtask 24-92-00-010-061-A
C. Get Access
(1) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the vertical stabilizer leading-edge.
(2) Remove and retain the access panels:
4. Procedure(1) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at the vertical stabilizer leading-edge.
(2) Remove and retain the access panels:
Subtask 24-92-00-210-061-A
A. Temporary Protection of the Electrical Conduits End-Fittings in the Vertical Stabilizer Leading-Edge
(a) Use Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) to remove any contamination from the fitting.
(b) Remove any flakes or blisters, make sure that the you do not damage the base metal while you do this task.
5. Close-upWARNING:
BE CAREFUL NOT TO CUT YOUR FINGERS. FLAKES OF NICKEL ARE SHARP.
(1) At each fitting use the procedure that follows to protect against corrosion: (a) Use Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) to remove any contamination from the fitting.
(b) Remove any flakes or blisters, make sure that the you do not damage the base metal while you do this task.
NOTE: We recommend that you use a dental tool or a seal tool (non metallic) to remove the flakes and the blisters.
(c) Use a BRUSH - BRISTLED or an SPRAY - BOTTLE, PUMP TYPE (NON AEROSOL) to apply a continuous thin and smooth coat of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) , to cover all the fitting ESPM 203330. Subtask 24-92-00-410-062-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
(3) Disconnect the aircraft from ground (Ref. AMM TASK 12-34-24-869-002).
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
(3) Disconnect the aircraft from ground (Ref. AMM TASK 12-34-24-869-002).
(4) Remove the access platform(s).
Electrical Harness Conduits - Corrosion Protection