Cleaning of EWIS Installed in the Aft Cabin Underfloor Compartment (Only If Contaminated)(EWIS)
TASK 24-92-00-100-001-A
Cleaning of EWIS Installed in the Aft Cabin Underfloor Compartment (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200171-01
CLEANING OF EWIS INSTALLED IN THE AFT CABIN UNDERFLOOR COMPARTMENT (ONLY IF CONTAMINATED)(EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-010-087-A
Subtask 24-92-00-410-181-A
Subtask 24-92-00-410-085-A
[Rev.10 from 2021]
2026.03.31 23:26:59 UTC
Cleaning of EWIS Installed in the Aft Cabin Underfloor Compartment (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200171-01
CLEANING OF EWIS INSTALLED IN THE AFT CABIN UNDERFLOOR COMPARTMENT (ONLY IF CONTAMINATED)(EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 171 | AFT CABIN U/FLOOR COMPARTMENT |
| 172 | AFT CABIN U/FLOOR COMPARTMENT |
| 171AL, 172AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 53-00-00-000-801-A | Removal of the Floor Panels in the Cabin from FR12 to FR70 |
| TASK 53-00-00-000-801-A-01 | Removal of the Floor Panels in the Cabin from FR12 to FR70 (Alternative Removal Procedure - Dry Sealing Concept) |
| TASK 53-00-00-000-801-A-02 | Removal of the Cabin Floor Panels from FR12 to FR70 (Alternative Removal Procedure with the Skyflex Option) |
| TASK 53-00-00-400-801-A | Installation of the Floor Panels in the Cabin from FR12 to FR70 |
| TASK 53-00-00-400-801-A-01 | Installation of the Floor Panels in the Cabin from FR12 to FR70 (Alternative Installation Procedure - Dry Sealing Concept) |
| TASK 53-00-00-400-801-A-02 | Installation of the Cabin Floor Panels from FR12 to FR70 (Alternative Installation Procedure with the Skyflex Option) |
| ESPM 2055000 | |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 24-92-00-010-087-A
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the access panels:
172AR 171AL.
(2) Open access panels:
Subtask 24-92-00-862-075-A 4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the access panels:
172AR 171AL.
(2) Open access panels:
Subtask 24-92-00-410-181-A
A. Preparation for Cleaning of Contaminated Wiring
(1) Remove the AFT cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-000-001).
(2) Remove the cabin floor panels from FR65 to FR70 (Ref. AMM TASK 53-00-00-000-801), (Ref. AMM D/O 06-41-53-00).
Subtask 24-92-00-160-050-A (1) Remove the AFT cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-000-001).
(2) Remove the cabin floor panels from FR65 to FR70 (Ref. AMM TASK 53-00-00-000-801), (Ref. AMM D/O 06-41-53-00).
B. Cleaning of All Wiring Installed in the AFT Cabin Underfloor Compartment (Only Contaminated Wiring).
(1) Clean wiring if there is dust or lint contamination ESPM 2055000.
(a) On the AC/DC power-distribution routes: 1P and 2P.
(b) On the flight control routes: 7S and 8S.
(c) On the engine control routes: 1S and 2S APU.
(d) On other routes: 1M and 2M.
5. Close-up(1) Clean wiring if there is dust or lint contamination ESPM 2055000.
(a) On the AC/DC power-distribution routes: 1P and 2P.
(b) On the flight control routes: 7S and 8S.
(c) On the engine control routes: 1S and 2S APU.
(d) On other routes: 1M and 2M.
Subtask 24-92-00-410-085-A
A. Close Access
(1) Installation of the cabin floor panels from FR65 to FR70 (Ref. AMM TASK 53-00-00-400-801), (Ref. AMM D/O 06-41-53-00).
(2) Install the AFT cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-400-001).
(3) Close the access panels:
(4) Remove the access platform(s).
(1) Installation of the cabin floor panels from FR65 to FR70 (Ref. AMM TASK 53-00-00-400-801), (Ref. AMM D/O 06-41-53-00).
(2) Install the AFT cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-400-001).
(3) Close the access panels:
(4) Remove the access platform(s).
Aft Cabin Underfloor Compartment - Access Panels - Zones 171-172