W DOC AIRBUS | AMM A320F

Visual Inspection of the Essential Transformer Rectifier (TR)


TASK 24-34-00-200-801-A
Visual Inspection of the Essential Transformer Rectifier (TR)


ZONE: 126
FIN: 1PE
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
126
LATERAL AVIONIC COMPARTMENT
812
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-34-00-100-801-A
Cleaning of the Essential Transformer Rectifier (TR)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
Subtask 24-34-00-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 24-34-00-010-051-A
B. Get access to the avionics compartment.
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below access door 812.
   (2) Open access door 812 (Ref. AMM TASK 52-41-00-010-002).
   (3) In the avionics compartment, open the access panel of AC/DC emergency power-center 106VU.
Subtask 24-34-00-865-057-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
106VUESS TR/SPLY4PEC01
4. Procedure
Subtask 24-34-00-210-050-A
A. Visual Inspection of the Essential TR
   (1) Do a visual inspection of the essential TR (1) and the adjacent area:
     (a) If there is a layer of dust or loose dirt on the ventilation grid area of the essential TR (1), clean it (Ref. AMM TASK 24-34-00-100-801).
Subtask 24-34-00-865-058-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
106VUESS TR/SPLY4PEC01
5. Close-up
Subtask 24-34-00-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) In the avionics compartment, close the access panel of AC/DC emergency power-center 106VU.
   (3) Close access door 812 (Ref. AMM TASK 52-41-00-410-002).
   (4) Remove the access platform(s).
Subtask 24-34-00-862-050-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:23:29 UTC