W DOC AIRBUS | AMM A320F

Installation of the System Control Unit (SCU)


TASK 23-36-34-400-001-A
Installation of the System Control Unit (SCU)


ZONE: 220
FIN: 11MH ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
220
FWD CAB UTILITY AREAS
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 23-33-00-600-802-A
Software / Media Download and Configuration of the IFE system
TASK 23-33-00-710-005-A
Operational Test of the Integrated In-Flight Entertainment (IFE) System
TASK 23-36-00-600-002-A
Configuration of the Passenger Entertainment (Video) with the Programmable System Control Unit
TASK 23-36-00-710-001-A
Operational Test of the Passenger Entertainment (Video)
TASK 23-73-00-861-001-A
Energize the Cabin Intercommunication Data System (CIDS)
TASK 23-73-00-862-001-A
De-energize the Cabin Intercommunication Data System (CIDS)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
F System Control Unit ** ON A/C NOT FOR ALL
F Control Panel ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 23-36-34-860-051-E ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the doors of the overhead stowage compartment and the VCC (8) are open.
   (3) Make sure that the closeout panel (2) is removed.
Subtask 23-36-34-865-063-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN-RH AFT25MHC06
2000VUPES-VIDEO-CABIN-LH23MHC05
2000VUPES-VIDEO-CABIN-RH FWD24MHC04
2000VUPES-VIDEO-CABIN-LH FWD22MHC03
2000VUPES-VIDEO-CONTROL-VCC21MHC02
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CONTROL-MAIN20MHC01
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN AFT-RH25MHC06
2000VUPES-VIDEO-CABIN AFT-LH23MHC05
2000VUPES-VIDEO-CABIN FWD-RH24MHC04
2000VUPES-VIDEO-CABIN FWD-LH22MHC03
2000VUPES-VIDEO-CONTROL-VCC-DS/C21MHC02
4. Procedure
Subtask 23-36-34-420-050-K ** ON A/C NOT FOR ALL
A. Installation of the System Control Unit (SCU)
F System Control Unit ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the SCU (3) on the adaptor plate (4) with the screws (7).
   (4) Carefully lift the adaptor plate (4) together with the SCU (3) into the overhead stowage compartment in front of the the video control center and move the adaptor plate (4) together with the SCU (3) into the rack (1).
   (5) Tighten the knurled screws (2).
   (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (7) Make sure that all the electrical connections are clean and in the correct condition.
   (8) Connect the electrical connectors (6) to the SCU (3).
   (9) Install the cover (5).
Subtask 23-36-34-420-050-P ** ON A/C NOT FOR ALL
A. Installation of the Control Panel (CP)
F Control Panel ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Attach the mounting plate (4) to the CP (1) with the screws (5).
   (5) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: DO NOT TOUCH THE CONNECTOR PINS OR OTHER CONDUCTORS ON THE COMPONENT DURING THE PROCEDURE. IF YOU TOUCH THESE CONDUCTORS, ELECTROSTATIC DISCHARGE CAN CAUSE DAMAGE TO COMPONENT.
   (6) Make sure that all the electrical connections are clean and in the correct condition.
   (7) Connect the electrical connectors (6) to the CP (1).
   (8) Carefully put the CP (1) assembly into the installation position in the VCC (8).
   (9) Tighten the captive screws (7), to attach the mounting plate (4) to the VCC (8).
   (10) Install the bonding cable (9) and the nut (10), to the bonding stud on the mounting plate (4).
   (11) Make sure that the electrical bonding is correct (Ref. AMM TASK 20-28-00-912-802).
Subtask 23-36-34-865-064-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN-RH AFT25MHC06
2000VUPES-VIDEO-CABIN-LH23MHC05
2000VUPES-VIDEO-CABIN-RH FWD24MHC04
2000VUPES-VIDEO-CABIN-LH FWD22MHC03
2000VUPES-VIDEO-CONTROL-VCC21MHC02
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CONTROL-MAIN20MHC01
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN AFT-RH25MHC06
2000VUPES-VIDEO-CABIN AFT-LH23MHC05
2000VUPES-VIDEO-CABIN FWD-RH24MHC04
2000VUPES-VIDEO-CABIN FWD-LH22MHC03
2000VUPES-VIDEO-CONTROL-VCC-DS/C21MHC02
Subtask 23-36-34-970-050-A ** ON A/C NOT FOR ALL
C. Do the configuration of the passenger entertainment (Video) programmable system control unit. (Ref. AMM TASK 23-36-00-600-002)
Subtask 23-36-34-970-050-C ** ON A/C NOT FOR ALL
C. Do the configuration of the passenger entertainment (Video) programmable system control unit (Ref. AMM TASK 23-33-00-600-802).
Subtask 23-36-34-860-050-A ** ON A/C NOT FOR ALL
D. Energize the Cabin Intercommunication Data System (CIDS) (Ref. AMM TASK 23-73-00-861-001).
Subtask 23-36-34-710-050-A ** ON A/C NOT FOR ALL
E. Do the Operational Test of the Passenger Entertainment (Video) (Ref. AMM TASK 23-36-00-710-001)System.
Subtask 23-36-34-710-050-F ** ON A/C NOT FOR ALL
E. Do the operational test of the integrated In-Flight Entertainment (IFE) System (Ref. AMM TASK 23-33-00-710-005).
5. Close-up
Subtask 23-36-34-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the door of the left forward stowage compartment between FR20 and FR23.
   (3) Close the flap on the front end of the forward stowage compartment.
Subtask 23-36-34-410-050-M ** ON A/C NOT FOR ALL
A. Close Access
   (1) De-energize the CIDS (Ref. AMM TASK 23-73-00-862-001).
   (2) Install the closeout panel (2):
     (a) Put the panel (2) in position on the VCC (8).
     (b) Tighten the captive screws (3).
   (3) Close the applicable stowage compartment and VCC (8) doors.
   (4) Make sure that the work area is clean and clear of tools and other items.
Subtask 23-36-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).