Configuration of the Passenger Entertainment (Video) with the Programmable System Control Unit
TASK 23-36-00-600-002-A
Configuration of the Passenger Entertainment (Video) with the Programmable System Control Unit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 23-36-00-861-052-A ** ON A/C NOT FOR ALL Subtask 23-36-00-860-067-A ** ON A/C NOT FOR ALL
Subtask 23-36-00-970-050-B ** ON A/C NOT FOR ALL
Subtask 23-36-00-410-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:14:12 UTC
Configuration of the Passenger Entertainment (Video) with the Programmable System Control Unit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 23-36-00-861-052-A ** ON A/C NOT FOR ALL Subtask 23-36-00-860-067-A ** ON A/C NOT FOR ALL
B. Open the applicable overhead stowage compartment(s).
Subtask 23-36-00-865-097-A ** ON A/C NOT FOR ALL C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CONTROL-VCC | 21MH | C02 |
| 2000VU | PES-VIDEO-CONTROL-MAIN | 20MH | C01 |
Subtask 23-36-00-970-050-B ** ON A/C NOT FOR ALL
A. Configuration of the Quantity from the Tapping Units
Subtask 23-36-00-970-051-A ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the System Control Unit (SCU) 11MH: | On the SCU 11MH: |
|
|
| | On the SCU 11MH, on the monitor:
NOTE: Wait for a minimum of 3 minutes after the SCU power-on, then continue with the procedure. |
| |
|
| 2.On the SCU 11MH, MODE SELECT area: | On the SCU 11MH, on the monitor: |
|
|
| 3.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 4.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 5.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 6.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 7.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 8.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| This message comes into view:
|
| | When the initialization process is completed:
|
| 9.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 10.On the SCU 11MH: | On the SCU 11MH: |
|
NOTE: Wait for a minimum of 10 seconds after the SCU power-off, then continue with the configuration. |
B. Configuration of the Programmable System Control-Unit
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the System Control Unit (SCU) 11MH: | On the SCU 11MH: |
|
|
| | On the SCU 11MH, on the monitor:
NOTE: Wait for a minimum of 3 minutes after the SCU power-on, then continue with the procedure. |
| |
|
| 2.On the SCU 11MH, MODE SELECT area: | On the SCU 11MH, on the monitor: |
|
|
| 3.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 4.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 5.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
|
|
| 6.On the SCU 11MH, on the key pad: NOTE: If the VTR1/BCS1 YES message comes into view, continue at step 7. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 7.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 8.On the SCU 11MH, on the key pad: NOTE: If the VTR2/BCS2 YES message comes into view, continue at step 9. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 9.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 10.On the SCU 11MH, on the key pad: NOTE: If the VTR3/BCS3 NO message comes into view, continue at step 11. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 11.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 12.On the SCU 11MH, on the key pad: NOTE: If the VTR4/BCS4 NO message comes into view, continue at step 13. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 13.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 14.On the SCU 11MH, on the key pad: NOTE: If the AMUX NO message comes into view, continue at step 15. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 15.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 16.On the SCU 11MH, on the key pad: NOTE: If the PRAM YES message comes into view, continue at step 17. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 17.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 18.On the SCU 11MH, on the key pad: NOTE: If the AIRSHOW YES message comes into view, continue at step 19. | On the SCU 11MH, on the monitor: |
|
|
|
|
|
|
| 19.On the SCU 11MH, on the key pad: | On the SCU 11MH, on the monitor: |
|
|
| 20.On the SCU 11MH: | On the SCU 11MH: |
|
|
Subtask 23-36-00-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Close the applicable overhead stowage compartment(s).
Subtask 23-36-00-862-052-A ** ON A/C NOT FOR ALL (1) Close the applicable overhead stowage compartment(s).