Installation of the Rotor Active Clearance Control (RACC) Valve [CFMI]
TASK 75-23-10-400-001-A
Installation of the Rotor Active Clearance Control (RACC) Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 75-23-10-860-050-A ** ON A/C NOT FOR ALL
Subtask 75-23-10-210-051-A ** ON A/C NOT FOR ALL
Subtask 75-23-10-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:09:17 UTC
Installation of the Rotor Active Clearance Control (RACC) Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| (Material No.CP5070) | vaseline |
| (Material No.CP8001) | lockwire 0.032 in. (0.8 mm) dia. |
| (Material No.CP8002) | lockwire 0.032 in. (0.8 mm) dia |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 80 | O-RINGS | AIPC 75-23-10-01-020 |
| 100 | O-RING | AIPC 75-23-10-01-090 |
| 110 | O-RINGS | AIPC 75-23-10-01-150 |
| 120 | O-RINGS | AIPC 75-23-10-01-160 |
| 440 | GASKETS | AIPC 75-23-10-01-190 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 70-21-00-918-001-A | Seals (Preformed Packings and O-rings) and Gaskets |
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
| TASK 73-29-00-710-040-A-01 | FADEC Ground Test Without the CFDS |
| TASK 73-29-00-710-040-A | Operational Test of the FADEC on the ground (with Engine Motoring) |
| TASK 73-29-00-710-040-A-01 | FADEC Ground Test Without the CFDS |
| TASK 73-29-00-710-040-A-02 | Operational Test of the FADEC on the Ground (with Engine non Motoring) |
| TASK 78-30-00-081-041-A | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-A | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-A | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-A | Closing of the Thrust Reverser Doors |
Subtask 75-23-10-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 75-23-10-865-059-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 75-23-10-010-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG1 | 1QG | A08 |
| 121VU | FUEL/LP VALVE/MOT2/ENG1 | 3QG | M25 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG2 | 2QG | A09 |
| 121VU | FUEL/LP VALVE/MOT2/ENG2 | 4QG | M26 |
C. Get Access
(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-23-10-040-051-A ** ON A/C NOT FOR ALL 4. Procedure(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-23-10-210-051-A ** ON A/C NOT FOR ALL
A. Do an inspection of the gasket assembly (440) (Ref. AMM TASK 70-21-00-918-001).
(1) Replace the C-seals in the gasket assemblies (130, 200) (Ref. AMM TASK 70-21-00-918-001).
Subtask 75-23-10-420-050-A ** ON A/C NOT FOR ALL (1) Replace the C-seals in the gasket assemblies (130, 200) (Ref. AMM TASK 70-21-00-918-001).
B. Install the RACC valve as follows:
(1) Remove the blanking caps from the electrical receptacles, open ports of the RACC valve (10), open ends of the upper and lower air tubes (40, 50) and the open ports of the HPC case.
(2) Temporarily install the insulation blanket (210) around the RACC valve (10).
(4) Lubricate the bolts (150, 170) that attach the RACC valve (10) to the flange with graphite grease (Material No.CP2101)
(5) Loosely install the bolts (150, 170) and the nuts (160, 180) that attach the RACC valve (10) to the flange.
Subtask 75-23-10-420-051-A ** ON A/C NOT FOR ALL (1) Remove the blanking caps from the electrical receptacles, open ports of the RACC valve (10), open ends of the upper and lower air tubes (40, 50) and the open ports of the HPC case.
(2) Temporarily install the insulation blanket (210) around the RACC valve (10).
NOTE: Do not wirelock the area around the electrical connectors of the insulation blanket (210) at this time.
(3) Put the RACC valve (10) in position between the upper and lower RACC air tubes (40, 50). (4) Lubricate the bolts (150, 170) that attach the RACC valve (10) to the flange with graphite grease (Material No.CP2101)
(5) Loosely install the bolts (150, 170) and the nuts (160, 180) that attach the RACC valve (10) to the flange.
- Install the bolts (150, 170) with the heads forward.
- Do not torque the nuts (160, 180) at this time.
C. Install the air tubes as follows:
(1) Install the seals (130, 200) between the RACC valve (10) and the upper and the lower air tubes (40, 50).
(3) Install the Vee-band clamps (140, 190) with the nuts outboard and aft.
(4) TORQUE the nuts (160, 180) that attach the RACC valve (10) to the flange to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(5) TORQUE the nuts that attach the Vee-band clamps (140, 190) to the RACC valve (10) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia
(6) TORQUE the bolts that attach the upper air tubes (40) to the fifth stage bleed valve to between 230 and 210 lbf.in (2.60 and 2.37 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(7) TORQUE the bolts that attach the lower air tube (50) to the fan frame to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
Subtask 75-23-10-420-052-A ** ON A/C NOT FOR ALL (1) Install the seals (130, 200) between the RACC valve (10) and the upper and the lower air tubes (40, 50).
NOTE: The old seals (130, 200) can be used again if there is no damage.
(2) Install the Vee-band clamps (140, 190) between the RACC valve (10) and the upper and the lower air tubes (40, 50). (3) Install the Vee-band clamps (140, 190) with the nuts outboard and aft.
(4) TORQUE the nuts (160, 180) that attach the RACC valve (10) to the flange to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with (5) TORQUE the nuts that attach the Vee-band clamps (140, 190) to the RACC valve (10) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with (6) TORQUE the bolts that attach the upper air tubes (40) to the fifth stage bleed valve to between 230 and 210 lbf.in (2.60 and 2.37 m.daN )
and wirelock with (7) TORQUE the bolts that attach the lower air tube (50) to the fan frame to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with D. Install the fuel manifold as follows:
(1) Remove the protective covers from the fuel manifolds (60).
(2) Lubricate the new AIPC 75-23-10-01-150 O-RINGS (110) and the new AIPC 75-23-10-01-160 O-RINGS (120) with vaseline (Material No.CP5070) .
(3) Install the new O-rings (110, 120) in the fuel manifold (60).
(4) Loosely install the fuel manifold (60) on the RACC valve (10).
(5) Lubricate the fluid bolts (90) and the new AIPC 75-23-10-01-090 O-RING (100) with vaseline (Material No.CP5070) and install the new O-ring (100) on the fuel bolts (90).
(6) Install the fuel bolts (90) into the manifolds (60). TORQUE the fuel bolts to between 30 and 23 lbf.in (0.34 and 0.26 m.daN )
.
(7) Tighten the fuel manifold (60) by hand. Wirelock the fuel manifolds (60) withCP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia
(8) Lubricate the new AIPC 75-23-10-01-020 O-RINGS (80) for the drain connectors (70) with vaseline (Material No.CP5070)
(9) Install the new O-rings (80) in the drain connectors (70).
(10) Loosely install the drain connectors (70).
(11) Install the LPTCC fuel manifold as follows:
(a) Install the new AIPC 75-23-10-01-190 GASKETS (440) on both sides of the fuel manifold (480). And, install the fuel manifold (60) and the LPTCC fuel manifold (450) with the bolts (430) and the nuts (420). TORQUE the nuts to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(12) Loosely install the clamps (300) that attach the fuel manifolds (60) to the upper bracket with the bolt (290) and the nut (280).
.
(16) TORQUE the nuts (350) that attaches the clamps (360) to the VSV drain bracket to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(17) TORQUE the nut (390) that attaches the clamps (400, 410) to the lower air tube (50) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(18) Loosely connect the coupling nut (20) to the drain connector (70).
(19) Loosely connect coupling nut on the fuel drain manifold (20) to the nipple on the VSV actuator drain manifold.
(20) Loosely install the clamp (260) that attaches the fuel drain manifold (20) to the tabs on the fuel manifolds (60) with the bolt (220) and nut (230).
(24) Loosely connect the coupling nut of the fuel drain tube (30) to the nipple on the drain manifold (20). Do not torque the coupling nut at this time.
(25) Tighten the drain connectors (70) by hand. Wirelock the knurled nuts withCP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(26) TORQUE these nut as follows:
(a) TORQUE the fuel drain manifold (20) and the fuel drain tube (30) coupling nuts to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
.
(b) TORQUE the coupling nut of the fuel drain tube (30) to the nipple on the fuel drain manifold (20) to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
.
(c) TORQUE the fuel drain manifold coupling nut (20) to the nipple on the VSV actuator drain manifold to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
.
(d) TORQUE the nuts (230, 250) that attach the clamps (260, 270) to the fuel manifolds (60) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(e) TORQUE the nut (320) that attaches the clamp (330) to the LPT cooling tube bracket to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(f) TORQUE the nuts that attach the clamps to the lower air tube (50) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(g) TORQUE the nuts that attach the clamps to the upper air tube (40) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(27) Connect the electrical connectors, Channel A (5) and Channel B (15) to the RACC valve (10). Tighten the connectors with your hand plus one-eighth of a turn.
(28) Wirelock the insulation blanket (210) by hand withCP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
Subtask 75-23-10-410-052-A ** ON A/C NOT FOR ALL (1) Remove the protective covers from the fuel manifolds (60).
(2) Lubricate the new AIPC 75-23-10-01-150 O-RINGS (110) and the new AIPC 75-23-10-01-160 O-RINGS (120) with vaseline (Material No.CP5070) .
(3) Install the new O-rings (110, 120) in the fuel manifold (60).
(4) Loosely install the fuel manifold (60) on the RACC valve (10).
(5) Lubricate the fluid bolts (90) and the new AIPC 75-23-10-01-090 O-RING (100) with vaseline (Material No.CP5070) and install the new O-ring (100) on the fuel bolts (90).
(6) Install the fuel bolts (90) into the manifolds (60). TORQUE the fuel bolts to between 30 and 23 lbf.in (0.34 and 0.26 m.daN )
. (7) Tighten the fuel manifold (60) by hand. Wirelock the fuel manifolds (60) with
(8) Lubricate the new AIPC 75-23-10-01-020 O-RINGS (80) for the drain connectors (70) with vaseline (Material No.CP5070)
(9) Install the new O-rings (80) in the drain connectors (70).
(10) Loosely install the drain connectors (70).
(11) Install the LPTCC fuel manifold as follows:
(a) Install the new AIPC 75-23-10-01-190 GASKETS (440) on both sides of the fuel manifold (480). And, install the fuel manifold (60) and the LPTCC fuel manifold (450) with the bolts (430) and the nuts (420). TORQUE the nuts to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (12) Loosely install the clamps (300) that attach the fuel manifolds (60) to the upper bracket with the bolt (290) and the nut (280).
- Install the clamps (300) with the loops forward.
- Install the bolt (290) with the head outboard.
- Do not torque the nut (280) at this time.
- Install the clamps (360) with the loops forward and outboard.
- Install the bolts (340) with the heads outboard.
- Do not torque the nuts (350) at this time.
- Install the clamp (410) with the loop inboard and aft.
- Install the clamp (400) with the loop inboard and forward and on top of the clamp (410).
- Install the washer (380) under the head of the bolt (370).
- Install the bolt (370) with the head outboard.
- Do not torque the nut (390) at this time.
. (16) TORQUE the nuts (350) that attaches the clamps (360) to the VSV drain bracket to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (17) TORQUE the nut (390) that attaches the clamps (400, 410) to the lower air tube (50) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (18) Loosely connect the coupling nut (20) to the drain connector (70).
(19) Loosely connect coupling nut on the fuel drain manifold (20) to the nipple on the VSV actuator drain manifold.
(20) Loosely install the clamp (260) that attaches the fuel drain manifold (20) to the tabs on the fuel manifolds (60) with the bolt (220) and nut (230).
- Install the clamp (260) with the loop outboard.
- Install the bolt (220) with the head outboard.
- Do not torque the nut (230) at this time.
- Install the clamp (270) with the loop outboard.
- Install the bolt (240) with the head outboard.
- Do not torque the nut (250) at this time.
- Install the clamp (330) with the loop outboard and aft.
- Install the bolt (310) with the head aft.
- Do not torque the nut (320) at this time.
(24) Loosely connect the coupling nut of the fuel drain tube (30) to the nipple on the drain manifold (20). Do not torque the coupling nut at this time.
(25) Tighten the drain connectors (70) by hand. Wirelock the knurled nuts with
(26) TORQUE these nut as follows:
(a) TORQUE the fuel drain manifold (20) and the fuel drain tube (30) coupling nuts to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
. (b) TORQUE the coupling nut of the fuel drain tube (30) to the nipple on the fuel drain manifold (20) to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
. (c) TORQUE the fuel drain manifold coupling nut (20) to the nipple on the VSV actuator drain manifold to between 150 and 135 lbf.in (1.70 and 1.53 m.daN )
. (d) TORQUE the nuts (230, 250) that attach the clamps (260, 270) to the fuel manifolds (60) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (e) TORQUE the nut (320) that attaches the clamp (330) to the LPT cooling tube bracket to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (f) TORQUE the nuts that attach the clamps to the lower air tube (50) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with (g) TORQUE the nuts that attach the clamps to the upper air tube (40) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
and wirelock with (27) Connect the electrical connectors, Channel A (5) and Channel B (15) to the RACC valve (10). Tighten the connectors with your hand plus one-eighth of a turn.
(28) Wirelock the insulation blanket (210) by hand with
E. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close thrust reverser cowl doors: (Ref. AMM TASK 78-36-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 75-23-10-440-050-A ** ON A/C NOT FOR ALL Subtask 75-23-10-865-056-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close thrust reverser cowl doors: (Ref. AMM TASK 78-36-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 75-23-10-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG1 | 1QG | A08 |
| 121VU | FUEL/LP VALVE/MOT2/ENG1 | 3QG | M25 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG2 | 2QG | A09 |
| 121VU | FUEL/LP VALVE/MOT2/ENG2 | 4QG | M26 |
H. Do a FADEC ground test (Ref. AMM TASK 73-29-00-710-040).
5. Close-upNOTE: As an alternative procedure, you can do this operational test without the CFDS (Ref. AMM TASK 73-29-00-710-040).
Subtask 75-23-10-410-051-A ** ON A/C NOT FOR ALL
A. Close fan cowl doors: (Ref. AMM TASK 71-13-00-410-040)
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 75-23-10-862-050-A ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Rotor Active Clearance Control Valve sheet 1 of 4