Operational Test of the Engine Interface Unit (with CFDS) [CFML]


TASK 73-25-34-710-805-A
Operational Test of the Engine Interface Unit (with CFDS)


1. Reason for the Job
Use this test to do a check of the Engine Interface Unit (EIU) operation.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-32-00-860-012-A
Procedure to Get Access to the SYSTEM REPORT/TEST/ENG Page
3. Job Set-up
Subtask 73-25-34-861-066-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 73-25-34-865-093-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1)
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R40
FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2)
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/ENG2/FADEC B/AND EIU24KS2R41
Subtask 73-25-34-860-108-A
C. Aircraft Maintenance Configuration
   (1) On the ENG section of maintenance panel 50VU:
     (a) Release the FADEC GND PWR 1(2) pushbutton switch (the ON legend comes on).
NOTE: After the FADEC is energized, wait ten seconds before you start the test. If you do not wait ten seconds, the interactive mode will stop the EEC self-test and this can cause a spurious fault.
4. Procedure
Subtask 73-25-34-710-067-A
A. Operational Test of the EIU
   (1) Do this test.
NOTE: This test is for system 1. For system 2, use the indication between parentheses.
   (2) On the left or right MCDU, get the SYSTEM REPORT/TEST ENG page (Ref. AMM TASK 31-32-00-860-012).
ACTION
RESULT
1.Push the line key adjacent to the EIU1(EIU2) indication.
  • The EIU1(EIU2) menu comes into view.
2.Push the line key adjacent to the TESTS indication.
  • On the MENU page, the TEST menu comes into view.
3.Push the line key adjacent to the SYSTEM TEST indication.
  • The TEST IN PROGRESS page comes into view.
    After five seconds:
  • If there is no failure, the TEST OK page comes into view.
  • If there are failures, the first page of test failures comes into view.
4.Push the line key adjacent to the RETURN indication until the CFDS menu comes into view.
  • The CFDS menu comes into view.
5.Stop the MCDU.

5. Close-up
Subtask 73-25-34-860-109-A
A. Put the aircraft back to its initial configuration.
   (1) On the ENG section of maintenance panel 50VU:
     (a) Push the FADEC GND PWR 1(2) pushbutton switch (the ON legend goes off).
Subtask 73-25-34-862-064-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).