Operational Test of the P2/T2 Probe Heater [IAE]
TASK 73-22-11-710-040-A
Operational Test of the P2/T2 Probe Heater
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 73-22-11-861-051-A ** ON A/C NOT FOR ALL Subtask 73-22-11-865-050-A ** ON A/C NOT FOR ALL
Subtask 73-22-11-710-051-A ** ON A/C NOT FOR ALL
Subtask 73-22-11-869-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:56:12 UTC
Operational Test of the P2/T2 Probe Heater
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-012-A | Procedure to Get Access to the SYSTEM REPORT/TEST/ENG Page |
Subtask 73-22-11-861-051-A ** ON A/C NOT FOR ALL Subtask 73-22-11-865-050-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 73-22-11-869-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| 122VU | ANTI ICE/PROBES/P2/T2/ENG1 | 11DA1 | Z10 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 121VU | ENGINE/ENG2/FADEC B | 4KS2 | Q40 |
| 122VU | ANTI ICE/PROBES/P2/T2/ENG2 | 11DA2 | Y10 |
C. On the maintenance panel 50VU:
4. Procedure- Release the FADEC GND PWR 1(2) pushbutton switch
- On the pushbutton switch, the ON legend comes on.
Subtask 73-22-11-710-051-A ** ON A/C NOT FOR ALL
A. Do this test:
5. Close-upNOTE: This test is for the system 1. For the other systems, use the indication between parentheses.
(1) On the left or right MCDU get the SYSTEM REPORT/TEST page (Ref. AMM TASK 31-32-00-860-012). | ACTION | RESULT |
|---|---|
| 1.Push the line key adjacent to the FADEC 1A (2A) indication. | The FADEC 1A (2A) menu comes in to view. |
| 2.Push the line key adjacent to the SYSTEM TEST indication. | The SYSTEM TEST menu comes into view. |
| 3.Select NEXT PAGE. | |
| 4.Push the line key adjacent to the P2/T2 HEATER TEST indication. | The P2/T2 HEATER TEST menu comes into view. |
| 5.Push the line key adjacent to the ENABLE TEST CAUTION indication. | TURN ON P2/T2 HEATER indication comes into view. |
| 6.Push the line key adjacent to the TURN ON P2/T2 HEATER indication. | TEST IN PROGRESS indication comes into view. After not many seconds HEATER ON/NO FAULTS indication comes into view. |
| 7.Push the line key adjacent to the TURN OFF P2/T2 HEATER indication. | TEST IN PROGRESS indication comes into view. After not many seconds RETURN NO FAULTS indication comes into view. |
| 8.Do the procedure again for the channel B of the FADEC 1(2). | |
| 9.Push the line key adjacent to the RETURN indication until the CFDS comes into view. | The CFDS menu comes in to view. |
| 10.Press the MCDU MENU key. | The MCDU menu comes into view. NOTE: If failures are found during the test, you must use the GROUND SCANNING function, read the fault message on the screen and do the related troubleshooting |
Subtask 73-22-11-869-052-A ** ON A/C NOT FOR ALL
A. On the maintenance panel 50VU:
Subtask 73-22-11-862-051-A ** ON A/C NOT FOR ALL - Push the FADEC GND PWR 1(2) pushbutton switch.
- On the pushbutton switch, the ON legend goes off.
P2/T2 Probe Heater Test