Inspection/Check of the Turbine Frame Assembly [CFMB]
TASK 72-56-00-210-002-A
Inspection/Check of the Turbine Frame Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-56-00-860-054-A ** ON A/C NOT FOR ALL
Subtask 72-56-00-210-051-A ** ON A/C NOT FOR ALL
Subtask 72-56-00-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:43:27 UTC
Inspection/Check of the Turbine Frame Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 72-00-00-200-025-A | Over-Serviceable-Limit Extensions |
| TASK 72-00-00-200-025-A-01 | Over-Serviceable-Limit Extensions |
| TASK 72-56-00-000-001-A | Removal of the Flame Arrestor and Flange Assembly |
| TASK 72-56-00-300-003-A | Replacement of Defective Studs |
| TASK 72-56-00-300-006-A | Replacement of the Oil Supply Tube Assembly |
| TASK 72-56-00-400-001-A | Installation of the Flame Arrestor and Flange Assembly |
| TASK 78-11-11-000-041-A | Removal of the Core Nozzle Assembly |
| TASK 78-11-11-400-041-A | Installation of the Core Nozzle Assembly |
| TASK 78-11-12-000-041-A | Removal of the Centerbody |
| TASK 78-11-12-400-041-A | Installation of the Centerbody |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 72-56-00-860-054-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the core nozzle is removed (Ref. AMM TASK 78-11-11-000-041).
(2) Make sure that the centerbody is removed (Ref. AMM TASK 78-11-12-000-041).
Subtask 72-56-00-941-051-A ** ON A/C NOT FOR ALL (1) Make sure that the core nozzle is removed (Ref. AMM TASK 78-11-11-000-041).
(2) Make sure that the centerbody is removed (Ref. AMM TASK 78-11-12-000-041).
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
Subtask 72-56-00-010-053-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
C. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position.
Subtask 72-56-00-040-051-A ** ON A/C NOT FOR ALL Subtask 72-56-00-010-054-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position.
E. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-56-00-210-051-A ** ON A/C NOT FOR ALL
A. Visual inspection of the Turbine Frame Assembly:
5. Close-up| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Forward and aft outer flanges for: | | |
| Not serviceable | |
| One crack, 0.20 in. (5.1 mm) max. per hole with a minimum 5-hole separation between cracks | |
| Five cracks, 0.20 in. (5.1 mm) max. per flange with a minimum 10-hole separation between cracks. Axial cracks only | |
| Five cracks per flange, 0.20 in. (5.1 mm) long with a minimum 5 in. (127 mm) separation between any other cracks | |
| Five per flange, 1 in. (25.4 mm) long, 0.01 in. (0.25 mm) deep, after removal of high metal with a minimum 1 in. (25.4 mm) separation | |
| 2.Engine mounting lug areas, airframe attach points only for: | | |
| Not serviceable | |
| Not serviceable | |
| Any number, 1 in. (25.4 mm) long, 0.02 in. (0.5 mm) deep after removal of high metal with a minimum 1 in. (25.4 mm) separation | |
| 3.All other areas of outer casing skin for: | | |
| Not serviceable | |
| Any number, 1 in. (25.4mm) long, 0.03 in. (0.76 mm) deep after removal of high metal and 1 in. (25.4 mm) minimum apart | |
| 4.Oil supply and scavenge tubes for: | | |
| Not serviceable | Replace the oil supply tube (Ref. AMM TASK 72-56-00-300-006). |
| Any number, 0.01 in. (0.25 mm) deep after removal of high metal | Replace the oil supply tube (Ref. AMM TASK 72-56-00-300-006). |
| Two per tube, smooth contour, 0.05 in. (1.27 mm) deep | Replace the oil supply tube (Ref. AMM TASK 72-56-00-300-006). |
| Any amount | |
| 5.Struts for: | | |
| Not serviceable | |
| Any number, any length, 0.02 in. (0.51 mm) deep after removal of high metal | |
| Any number, smooth contour, 0.02 in. (0.51 mm) deep | |
| Three (3) maximum:
| Replace the stud (Ref. AMM TASK 72-56-00-300-003) within 500 hours/500 cycles. |
| 6.No. 7 and No. 10 struts (oil supply and scavenge tubes) bulkheads for: | | |
| Two cracks, any length on each bulkhead | |
| Not serviceable | |
| 7.Sump flooding boss area for: | | |
| Two cracks, no longer than 1 in. (25.4 mm) and 1 in. (25.4 mm) apart, minimum | |
| Flame arrestor for: | | |
| Any number | |
| Serviceable, if one strip remains | |
| Any area up to 50 percent of clogging | |
| Not serviceable | Replace the flame arrestor within the next 10 cycles (Ref. AMM TASK 72-56-00-000-001) (Ref. AMM TASK 72-56-00-400-001). |
8.Thermal insulation blankets
| Not serviceable | Install a new blanket. See overserviceable limit extension (Ref. AMM TASK 72-00-00-200-025). |
| 9.Guide bushing for the oil supply tube for: | | |
| No more than 0.06 in. (1.52 mm) | |
| Not serviceable | 600 cycles or 750 hours max. serviceable extension is allowed with less than 0.06 in. (1.52 mm). 25 cycles or 50 hours max. serviceable extension is allowed with more than 0.06 in. (1.52 mm). |
| 10.The drain nipple for: | | |
| Not serviceable | |
| Less than a quarter of threads after removal of burrs | |
| Any number 0.005 in. (0,13 mm) deep after removal of high metal | |
| Any amount, that cannot be felt with a 0.040 in. (1,0 mm) scriber | |
| Any number 0.03 in. (0,8 mm) deep after removal of high metal | |
| Not serviceable | |
| Any number 0.03 in. (0,8 mm) deep after removal of high metal | |
| Not serviceable | |
| 11.The flange assembly for: | | |
| Any amount of cracks if no missing material (not including stop drill), and no cracks between bolt holes, are permitted | A maximum service extension of 10 cycles or 25 hours is permitted for crack with missing material or cracks between two bolt holes. |
| Any amount if the ratio of the depth of the dent over the minimal length of the dent is 10% or less | |
| Two bolts:
| A maximum service extension of 25 cycles or 60 hours is permitted. If more than two bolts, there is no service extension available. |
| 12.The No. 5 bearing support for: | | |
| Serviceable | |
| 13.The oil inlet cover for: | | |
| All quantities are permitted if the average is 0.010 in. (0.25 mm) in depth over the full circumference | All quantities are permitted if the average is 0.010 in. (0.25 mm) in depth over the full circumference. |
Subtask 72-56-00-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the centerbody (Ref. AMM TASK 78-11-12-400-041).
(3) Install the core nozzle (Ref. AMM TASK 78-11-11-400-041).
(4) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-56-00-440-051-A ** ON A/C NOT FOR ALL Subtask 72-56-00-410-054-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the centerbody (Ref. AMM TASK 78-11-12-400-041).
(3) Install the core nozzle (Ref. AMM TASK 78-11-11-400-041).
(4) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Turbine Frame Struts