1. Reason for the Job
Inspection of the combustion chamber is limited to the areas that can be seen with a rigid borescope, at the 1, 3, 6 and 10 o'clock borescope ports, and at the 2 spark igniter ports.
the borescope ports at the 1, 3, 6, and 10 o'clock positions are located immediately in front of the fuel manifold. These ports and the 2 spark igniter ports permit the borescope inspection of the combustion chamber and the HPT nozzle.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - PROTECTION
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 63 and 57 lbf.in (0.71 and 0.64 m.daN ) T
No specific
Torque wrench: range to between 135 and 120 lbf.in (1.53 and 1.36 m.daN ) T
856A1320
1
BORESCOPE-KIT
856A1322
1
BORESCOPE-LIGHT SOURCE SET
856A1323
1
MONITOR, RESOLUTION BORESCOPE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.CP2101)
graphite grease
(Material No.CP2619)
Never Seez-Pure Nickel, Special
(Material No.CP8001)
lockwire 0.032 in. (0.8 mm) dia.
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR, 451AL, 452AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR, 461AL, 462AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-A
Closing of the Fan Cowl Doors
TASK 72-00-00-200-005-A
Over-Serviceable-Limit Extensions
TASK 73-11-40-790-001-A
Leak Check of the Fuel Nozzles
TASK 74-21-30-000-001-A
Removal of the Spark Igniter
TASK 74-21-30-400-001-A
Installation of the Spark Igniter
TASK 78-30-00-081-041-A
Make the Thrust Reverser Serviceable after Maintenance
TASK 78-30-00-481-041-A
Make the Thrust Reverser Unserviceable for Maintenance
TASK 78-36-00-010-040-A
Opening of the Thrust Reverser Doors
TASK 78-36-00-410-040-A
Closing of the Thrust Reverser Doors
NTM 720000
3. Job Set-up
Subtask 72-42-00-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-42-00-010-050-A ** ON A/C NOT FOR ALL
B. Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 72-42-00-040-050-A ** ON A/C NOT FOR ALL
C. Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-481-041).
Subtask 72-42-00-010-054-A ** ON A/C NOT FOR ALL
D. Open the thrust reverser doors: (Ref. AMM TASK 78-36-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
   (2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure
Subtask 72-42-00-020-050-A ** ON A/C NOT FOR ALL
A. Remove parts before borescope inspection.
   (1) Remove the borescope plugs from the approximate 3 and 10 o'clock positions on the combustion case.
Subtask 72-42-00-290-050-A ** ON A/C NOT FOR ALL
B. Do a borescope inspection
   (1) Use the 856A1323 MONITOR, RESOLUTION BORESCOPE (856A1323G01) to make sure the borescope and the lightsource are serviceable. See the Non-Destructive Test Manual for this procedure. NTM 720000.
   (2) Connect the fiber light cable to the 856A1320 BORESCOPE-KIT (856A1320P04/P05) and to the port on 856A1322 BORESCOPE-LIGHT SOURCE SET (856A1322P03/P04/P07).
   (3) Put the rigid borescope, (856A1320P04/P05), into the ports and turn on the light source of the borescope-lightsource set (856A1322P03/P04).
   (4) Turn the borescope to a full 360 degrees and adjust it so that you can see the dome of the combustion chamber, fuel nozzles, the inner and outer liners, and the aft sections.
   (5) Inspect the following:
INSPECT/CHECK
MAXIMUM SERVICEABLE LIMITS
REMARKS
1.All surfaces for:


A.Discoloration
Any amount.

B.Carbon Accumulation
Any amount.

C.Missing, chipped or spalled areas of thermal barrier coating
Any amount

2.Dome Assembly (Spectacle Plate, Deflector and Sleeve) for:


A.Distortion of deflector or sleeve.
Any amount.

B.Radial crack in spectacle plate.
Any number up to 2 in. (50.8 mm) length and not connected to each other.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
C.Circumferential crack in spectacle plate.
Any number up to 3 in. (76.2 mm) length separated by 6 in. (152.4 mm).
See limit extension (Ref. AMM TASK 72-00-00-200-005).
D.Connected cracks in spectacle plate
Not more than (1) radial crack 2 in. (50.8 mm) long with (1) circumferential crack 3 in. (76.2 mm) long separated by 6 in. (152.4 mm)
See limit extension (Ref. AMM TASK 72-00-00-200-005).
E.Missing material from spectacle plate
Max. 0.06 in. (1.5 mm) x 0.06 in. (1.5 mm) at intersection of connected crack
See limit extension (Ref. AMM TASK 72-00-00-200-005).
F.Radial crack in deflector or sleeve.
Any number up to 0.5 in. (12.7 mm) length.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
G.Circumferential cracks in deflector or sleeve.
Any number up to 0.75 in. (19 mm) length.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
H.Connected cracks in deflector or sleeve.
Connection of any radial and circumferential cracks within limits of paragraphs F and G above. Limit is exceeded when third crack connects.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
J.Missing material from extensions on deflector
Up to 9-exposed dome cooling holes permitted in each deflector quadrant (1-4) as shown in view XX, sheet 2 of the figure
See limit extensions, (Ref. AMM TASK 72-00-00-200-005) and view ZZ, sheet 2 of the figure

More than 9-exposed dome cooling holes per quadrant are allowed if all exposed holes in the quadrant are within pattern restriction shown in view YY, sheet 2 of the figure

K.Missing material from extensions on sleeve
Any amount up to 0.2 in (5.08 mm) maximum depth.
See limit extensions, (Ref. AMM TASK 72-00-00-200-005).
L.Burn through holes
3 per dome 1 in. (25.4 mm) x 1 in. (25.4 mm) maximum.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
M.Cracks in primary swirl nozzle
Any amount

N.Fuel nozzles for dislodged wear sleeves
Not serviceable
See limit extension (Ref. AMM TASK 72-00-00-200-005).
3.Inner and outer liners for:
NOTE: Axial cracks can turn circumferential for a short distance (less than one dilution land in length). In this condition, you must think of the crack of as one continuous axial crack.


A.Outer liner axial cracks.
Any number across 1 panel or less and up to 4 cracks across more than 1 panel but not longer than 3 panels.
If a crack extends across more than 3 panels, borescope inspect the outer side of the outer liner in these locations.
If the inspection reveals that the cracks do not extend through more than 1 of the 4, 5 and 6 ribs and rib 1 is not cracked through, reinspect the combustor in 750 cycles.
25 cycles maximum service extention allowed provided there are not more than 4 cracks across more than 1 panel, not to exceed 4 consecutive panels (no cooling rib inspection required).
25 cycles maximum service extention allowed provided not more than 4 cracks across more than 1 panel, not to exceed 5 panels and coupling rib 3, 4, 5 or 6 is not cracked through the outer side of the outer liner.
NOTE: When applying limits, the dome band is interpreted as a panel.
B.Inner liner axial cracks.
Any number across 1 panel or less and up to 4 cracks across more than 1 panel but not longer than 2 panels.
If up to 1 crack is across 4 panels, and no material is missing more than 3 times the diameter of a dilution hole and does not connect to a circumferential crack longer than 0.5 in. (12.7 mm), then reinspect in 750 cycles. See limit extensions (Ref. AMM TASK 72-00-00-200-005).
25 cycles maximum service extention allowed, provided there are no more than 4 cracks across more than 1 panel, not to exceed 4 consecutive panels.
C.Circumferential cracks.
There is no limit to the number with these conditions: The cracks are no longer than 2 dilution lands. There are no more than 2 adjacent cracks in a dilution land. The cracks are separated by a minimum of 3 dilution lands that do not have cracks.
See limit extensions (Ref. AMM TASK 72-00-00-200-005).
D.Connected cracks.
Connection of any axial and circumferential cracks up to max limits of paragraphs A, B and C above. Limit is exceeded when third crack connects.
Multiple axial and circumferential cracks that connect if cracks:
a. Contained in one panel.
b. Contained in one dilution land area.
c. There are not more than two locations in the adjacent panels that are axially aligned.
d. The locations are separated by a minimum of three dilution lands that do not have cracks.
e. There are not more than five locations with connected cracks.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
E.Burn through or missing material.
Per liner: any number of holes are permitted with these conditions:
  • There are not more than two holes in adjacent panels that are axially aligned.
  • The maximum size of any hole is not more than 5 times the size of a dilution hole.
  • The total area of burn through is not to exceed 15 times the size of a dilution hole.
See limits extension (Ref. AMM TASK 72-00-00-200-005).
F.Missing overhangs.
Per liner: 14 areas each the size of a dilution hole providing maximum axial alignment of distress is 3 adjacent panels.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
G.Distortion
Any amount within 0.5 in. (12.7 mm) of original contour.
See limit extension (Ref. AMM TASK 72-00-00-200-005).
   (6) When the inspection is complete, turn off the light source and remove the borescope.
   (7) If any defects are found then remove additional borescope plugs and the spark igniters to inspect all of the combustion chamber.
If no defects are found, install parts removed for borescope inspection.
Subtask 72-42-00-010-053-A ** ON A/C NOT FOR ALL
C. Remove parts before borescope inspection.
   (1) Remove the drain tube from the fuel nozzle adjacent to the 6 o'clock borescope plug.
NOTE: If you remove the drain tube from the fuel nozzle adjacent to the 6 o'clock borescope plug, you will be required to perform a leak check after this inspection. Use the 6 o'clock borescope port only if necessary.
   (2) Remove the borescope plugs from the approximate 1 and 6 o'clock positions.
   (3) Remove both spark igniters (Ref. AMM TASK 74-21-30-000-001).
   (4) Install CAP - PROTECTION on the leads and the spark igniters.
Subtask 72-42-00-290-052-A ** ON A/C NOT FOR ALL
D. Do a borescope inspection.
   (1) Repeat the inspection procedure for each borescope and spark igniter location.
Subtask 72-42-00-420-050-A ** ON A/C NOT FOR ALL
E. Install parts removed for borescope inspection.
   (1) Apply a small amount of graphite grease (Material No.CP2101) or CP2619Never Seez-Pure Nickel, Special to the borescope plug threads and pressure faces.
   (2) Install the borescope plugs.
CAUTION: BE SURE TO INSTALL THE CORRECT BORESCOPE PLUGS. THE COMBUSTOR BORESCOPE PLUGS DO NOT HAVE A STEM FEATURE. INADVERTENT INSTALLATION OF BORESCOPE PLUGS WITH STEMS FROM OTHER LOCATIONS WILL RESULT IN THE STEM FEATURE BEING BURNED AWAY BY COMBUSTION GASES.
     (a) Install the borescope plugs and TORQUE to between 63 and 57 lbf.in (0.71 and 0.64 m.daN ) T.
     (b) Safety the plugs with CP8001lockwire 0.032 in. (0.8 mm) dia..
   (3) If necessary, install the fuel drain tube to the fuel nozzle adjacent to the six o'clock borescope plug. TORQUE the coupling nuts on the fuel drain tube to between 135 and 120 lbf.in (1.53 and 1.36 m.daN )
T and safety with CP8001lockwire 0.032 in. (0.8 mm) dia.
   (4) If necessary, remove the protective caps and install the spark igniters (
Ref. AMM TASK 74-21-30-400-001)
Subtask 72-42-00-790-050-A ** ON A/C NOT FOR ALL
F. Do a fuel nozzle leak check.
   (1) If you removed the drain tube from the fuel nozzle adjacent to the 6 o'clock borescope plug, do a fuel nozzle leak check (Ref. AMM TASK 73-11-40-790-001).
5. Close-up
Subtask 72-42-00-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the thrust reverser doors: (Ref. AMM TASK 78-36-00-410-040)
     (a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
     (b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-42-00-440-050-A ** ON A/C NOT FOR ALL
B. Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-081-041)
Subtask 72-42-00-410-053-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowl doors: (Ref. AMM TASK 71-13-00-410-040)
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Remove the warning notice(s)
[Rev.10 from 2021] 2026.04.01 12:58:53 UTC