Detailed Inspection of Locking Hooks and Fork Fittings of Aft Cargo Compartment Door at all Frames, between Longeron 4 and Longeron 5 (6 Places)


TASK 52-32-11-200-009-A
Detailed Inspection of Locking Hooks and Fork Fittings of Aft Cargo Compartment Door at all Frames, between Longeron 4 and Longeron 5 (6 Places)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 826
1. Reason for the Job
Refer to the MPD TASK: 523219-01
DETAILED INSPECTION OF LOCKING HOOKS AND FORK FITTINGS OF AFT CARGO COMPARTMENT DOOR AT ALL FRAMES, BETWEEN LONGERON 4 AND LONGERON 5 (6 PLACES)
NOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05RDA1)
Adhesive Film Tape-Masking - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ABC1)
Corrosion Preventive Compound_Water Displacing Soft Film -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826
AFT CARGO COMPARTMENT DOOR
826AR, 826BR, 826CR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 51-73-11-300-002-A
Repair of Minor Damage on Titanium, Forged Aluminum, or Steel Components
TASK 51-75-12-300-001-A
Repair of Major Paint Damage on Light Alloy and Composite Material
TASK 51-78-00-916-001-A
Application of Temporary Protection System (TPS)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-32-21-000-013-A
Removal of the Latching Unit
TASK 52-32-21-400-013-A
Installation of the Latching Unit
TASK 52-32-33-000-001-A
Removal of the Door Fairings and Access Panels
TASK 52-32-33-400-001-A
Installation of the Door Fairings and Access Panels
SRM 517300
SRM 517400
SRM 523000
SRM 523200
3. Job Set-up
Subtask 52-32-11-010-067-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the aft cargo-compartment door.
   (2) Remove the door fairing 826CR and the access panels 826AR and 826BR from the cargo door (Ref. AMM TASK 52-32-33-000-001).
   (3) Open the aft cargo-compartment door and safety it with the actuator safety lock (Ref. AMM TASK 52-30-00-860-001).
Subtask 52-32-11-865-076-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 52-32-11-615-053-A ** ON A/C NOT FOR ALL
A. Cleaning Procedure
   (1) Make sure that the area for inspection is clean. If the inspection area is not clean:
     (a) Clean the area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) If there is a Temporary Protection System (TPS) layer applied that prevents the inspection of the area, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 52-32-11-210-061-B ** ON A/C NOT FOR ALL
B. Detailed Inspection of Locking Hooks and Fork Fittings of Aft Cargo Compartment Door at all Frames, Between Longeron 4 and Longeron 5 (6 Places)
   (1) Examine the inner surface of each latching hook for wear, chafe marks and cracks.
     (a) If you find marks, measure the depth of the damage.
NOTE: Marks up to a depth of 0.1 mm (0.0039 in.) are permitted.
     (b) If the depth of a mark is between 0.1 mm (0.0039 in.) and 0.3 mm (0.0118 in.), remove the damage (Ref. AMM TASK 51-73-11-300-002).
     (c) If the latching hook has marks with a depth of more than 0.3 mm (0.0118 in.), replace it (Ref. AMM TASK 52-32-21-000-013) (Ref. AMM TASK 52-32-21-400-013).
     (d) If you find a crack, replace the latching hook (Ref. AMM TASK 52-32-21-000-013) (Ref. AMM TASK 52-32-21-400-013).
   (2) Examine the fork fittings of each door frame and the adjacent skin area for scratches, marks, cracks and corrosion:
     (a) If you find a scratch or a mark:
  • Find the limits of the damaged area SRM 523000
  • Remove the damage when it is less than the limit SRM 517300.
NOTE: When the scratch or mark is larger than the limit, repair the fork fitting or replace it SRM 523200.
     (b) If you find corrosion:
  • Find the limits of the corroded area SRM 523000
  • Remove the damage when it is less than the limit SRM 517400.
NOTE: If the corroded area is larger than the limit, repair the fork fitting or replace it SRM 523000.
   (3) Make sure that the paint layer on the fork fitting and the adjacent skin area is in the correct condition (Ref. AMM TASK 51-75-12-300-001).
Subtask 52-32-11-916-053-A ** ON A/C NOT FOR ALL
C. Application of Temporary Protection System (TPS)
   (1) Apply Adhesive Film Tape-Masking - - (Material No.05RDA1) on the items adjacent to the area: the seals, bellows, door mechanisms, proximity switches and fittings.
   (2) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001).
NOTE: AIRBUS recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If you think that the TPS layer is in the correct condition, you can apply a new layer (as a spray) on the layer.
   (3) If the TPS layer is damaged, remove the TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) .
   (4) If, before the inspection:
  • there was removal of the TPS layer
    or
  • the inspection area was cleaned with high pressure water, steam, solvents and/or cleaning agents.
     (a) Apply a full new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
5. Close-up
Subtask 52-32-11-865-075-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-32-11-410-067-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the actuator safety lock and close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (3) Install the access panels 826AR and 826BR and the door fairing 826CR on the cargo door (Ref. AMM TASK 52-32-33-400-001).
   (4) Remove the access platform(s).