W DOC AIRBUS | AMM A320F

Installation of the Latching Unit


TASK 52-32-21-400-013-A
Installation of the Latching Unit


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ABC1)
Corrosion Preventive Compound_Water Displacing Soft Film -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
206
COTTER PIN
AIPC 52-32-21-37-030
203
COTTER PIN
AIPC 52-32-21-37-150
172
COTTER PIN
AIPC 52-32-21-37-240
206
COTTER PIN
AIPC 52-32-21-38-030
203
COTTER PIN
AIPC 52-32-21-38-150
172
COTTER PIN
AIPC 52-32-21-38-240
221
COTTER PIN
AIPC 52-32-21-43-040
223
COTTER PIN
AIPC 52-32-21-43-040
225
COTTER PIN
AIPC 52-32-21-43-040
221
COTTER PIN
AIPC 52-32-21-44-040
223
COTTER PIN
AIPC 52-32-21-44-040
225
COTTER PIN
AIPC 52-32-21-44-040
206
COTTER PIN
AIPC 52-32-84-44-030
203
COTTER PIN
AIPC 52-32-84-44-160
172
COTTER PIN
AIPC 52-32-84-44-230
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-22-52-640-002-A
Lubrication of Cargo Door
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-32-00-720-001-A
Functional Check of Aft Cargo-Compartment Door, Comprising Functional Checks of Locking Mechanism, Interlock Mechanism, Drift Pin Mechanism, Safety Mechanism
TASK 52-32-11-820-002-A
Adjustment of the Door Mechanism
F Latching Unit ** ON A/C NOT FOR ALL
F Latching Unit ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 52-32-21-860-064-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the AFT cargo-compartment door (referred to as cargo door) is opened and safetied with the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the opened cargo door.
   (3) Make sure that the access panel 826AR is removed from the cargo door.
Subtask 52-32-21-865-084-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 52-32-21-910-061-A
A. Preparation for Installation
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Apply a layer of Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to:
  • the inner and outer sliding surfaces of the sleeves (211),(214),(229),(240),
  • the sliding surfaces of the bushes (181), (209), (216), (228), (230), (235), (236), (241) and (239),
  • the shaft of all other bolts.
Subtask 52-32-21-420-072-A ** ON A/C NOT FOR ALL Subtask 52-32-21-420-073-A ** ON A/C NOT FOR ALL
C. Installation of the Latching Unit
   (1) Connect the link rod (181) to the link lever (175) as follows:
     (a) Put the upper eye-end of the link rod (181) on the fork-end of the shaft lever (175).
     (b) Install the bolt (178), the washers (179), the bushes (180) and (182) and the (173).
     (c) Tighten the nut (173) and safety it with the new
AIPC 52-32-21-37-240 COTTER PIN (172) or AIPC 52-32-84-44-230 COTTER PIN (172).
   (2) Attach the bellcrank lever (215) to the cargo door frame as follows:
     (a) Install the bush (216) in the cargo door frame.
     (b) Assemble the sleeve (214) into the bellcrank lever (215).
     (c) Move the bellcrank lever (215) inboard until you can install the bolt (213).
     (d) Install the bolt (213), the washers (205) and the nut (204) on the cargo door frame.
     (e) Tighten the nut (204) and safety it with the new
AIPC 52-32-21-37-150 COTTER PIN (203) or AIPC 52-32-84-44-160 COTTER PIN (203).
   (3) Attach the latch hook (210) to the cargo door frame as follows:
     (a) Install the bushes (209) in the cargo door frame.
     (b) Assemble the sleeve (211) into the latch hook (210).
     (c) Move the latch hook (210) inboard until you can install the bolt (212).
     (d) Install the bolt (212), the washers (208) and the nut (207).
     (e) Tighten the nut (207) and safety it with the new cotter pin (206).
     (f) Tighten the nut (207) and safety it with the new
AIPC 52-32-21-37-030 COTTER PIN (206) or AIPC 52-32-84-44-030 COTTER PIN (206).
   (4) Install the travel limit bolt (217), the washers (201) and the nut (202) on the cargo door frame.
Subtask 52-32-21-420-072-C ** ON A/C NOT FOR ALL Subtask 52-32-21-420-073-C ** ON A/C NOT FOR ALL
E. Installation of the Latching Unit
   (1) Connect the link rod (181) to the link lever (175) as follows:
     (a) Put the upper eye-end of the link rod (181) on the fork-end of the shaft lever (175).
     (b) Install the bolt (178), the washers (179), the bushes (180) and (182) and the (173).
     (c) Tighten the nut (173) and safety it with the new
AIPC 52-32-21-38-240 COTTER PIN (172).
   (2) Attach the bellcrank lever (215) to the cargo door frame as follows:
     (a) Install the bush (216) in the cargo door frame.
     (b) Assemble the sleeve (214) into the bellcrank lever (215).
     (c) Move the bellcrank lever (215) inboard until you can install the bolt (213).
     (d) Install the bolt (213), the washers (205) and the nut (204) on the cargo door frame.
     (e) Tighten the nut (204) and safety it with the new
AIPC 52-32-21-38-150 COTTER PIN (203).
   (3) Attach the latch hook (210) to the cargo door frame as follows:
     (a) Install the bushes (209) in the cargo door frame.
     (b) Assemble the sleeve (211) into the latch hook (210).
     (c) Move the latch hook (210) inboard until you can install the bolt (212).
     (d) Install the bolt (212), the washers (208) and the nut (207).
     (e) Tighten the nut (207) and safety it with the new cotter pin (206).
     (f) Tighten the nut (207) and safety it with the new
AIPC 52-32-21-38-030 COTTER PIN (206).
   (4) Install the travel limit bolt (217), the washers (201) and the nut (202) on the cargo door frame.
Subtask 52-32-21-820-062-A Subtask 52-32-21-720-059-A
G. Do the functional test of the latching mechanism (Ref. AMM TASK 52-32-00-720-001).
5. Close-up
Subtask 52-32-21-865-085-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-32-21-410-063-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Apply Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) to all the components of the locking units and to the adjacent cargo
   (3) Install the access panel 826AR on the cargo door.
   (4) Remove the actuator safety locks and close the AFT cargo door (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 12:46:08 UTC