W DOC AIRBUS | AMM A320F

Replacement the Oil Heater by the Cover Plate (131-9(A))


TASK 49-96-51-960-001-A
Replacement the Oil Heater by the Cover Plate (131-9(A))


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 55 and 45 lbf.in (0.62 and 0.51 m.daN ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 49-96-00-040-001-A
Deactivation of the Oil Heater System (131-9(A))
TASK 49-96-51-000-002-A
Removal of the Oil Heater (131-9(A))
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
3. Job Set-up
Subtask 49-96-51-860-055-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
   (3) Put the WARNING NOTICE(S) in position on panel 25VU to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-96-51-865-059-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
** ON A/C NOT FOR ALL
121VUAPU/OIL/HTR/SPLY1KTK41
Subtask 49-96-51-010-054-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the APU access doors 315AL and 316AR.
   (2) Open the APU access doors (Ref. AMM TASK 52-41-00-010-001).
   (3) Set the LIGHT SW 11LJ to the ON position.
4. Procedure
Subtask 49-96-51-960-052-A ** ON A/C NOT FOR ALL
A. Replacement the Oil Heater by the Cover Plate
   (1) Make sure that the oil heater is deactivated (Ref. AMM TASK 49-96-00-040-001).
   (2) Remove the oil heater (Ref. AMM TASK 49-96-51-000-002).
   (3) Install the O-ring (5) in the cover plate (3).
   (4) Put the cover plate (3) in position in the gearbox.
   (5) Install the washers (2) and the bolts (1).
   (6) TORQUE the bolts (1) to between 55 and 45 lbf.in (0.62 and 0.51 m.daN ) T.
   (7) Make sure that the electrical connector is clean and in the correct condition.
   (8) Connect the electrical connector (4).
5. Close-up
Subtask 49-96-51-410-054-A ** ON A/C NOT FOR ALL
Subtask 49-96-51-865-060-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
** ON A/C NOT FOR ALL
121VUAPU/OIL/HTR/SPLY1KTK41
Subtask 49-96-51-860-056-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
   (3) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 12:42:22 UTC