W DOC AIRBUS | AMM A320F

Installation of the Cooling Fan (131-9(A))


TASK 49-52-51-400-002-A
Installation of the Cooling Fan (131-9(A))


WARNING: DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.374 and 0.306 m.daN (33.10 and 27.08 lbf.in ) T
No specific
Torque wrench: range to between 0.748 and 0.612 m.daN (66.19 and 54.16 lbf.in ) T
No specific
Torque wrench: range to between 1.77 and 1.45 m.daN (13.05 and 10.69 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03ABA1)
Synthetic base Lubricating Oil-Turbine Engine - -
(Material No.03ABB1)
Synthetic base Lubricating Oil-Turbine Engine Low Temp. -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
PACKING
AIPC 49-21-09-03-070
8
PACKING
AIPC 49-52-09-01-080
6
PACKINGS
AIPC 49-52-09-01-100
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 49-00-00-710-010-A
Operational Test of the APU
TASK 49-11-11-000-004-A
Removal of the Power Plant (APU) (131-9(A))
TASK 49-90-00-600-007-A
Check Oil Level and Replenish (131-9(A))
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
3. Job Set-up
Subtask 49-52-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.
   (3) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
   (5) Make sure that the access platform is in position below the APU compartment.
   (6) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
   (7) Make sure that the LIGHT control SW 11LJ is in the ON position.
Subtask 49-52-51-865-054-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
4. Procedure
Subtask 49-52-51-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Fan Assembly
   (1) Examine the fan outlet duct (1) for damage. Replace the duct if necessary.
   (2) Examine the fan inlet duct (12) for damage. Replace the duct if necessary.
   (3) Examine the fan vanes for damage. Replace the fan if necessary.
   (4) Examine the mounting flange for damage, if the APU flange is damaged, replace the APU (Ref. AMM TASK 49-11-11-000-004).
   (5) Apply a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) to the new packings (5), (6) and (8).
   (6) Install the new AIPC 49-52-09-01-100 PACKINGS (6) on the transfer tube (7).
   (7) Install the transfer tube (7) on the fan (9).
   (8) Install the new
AIPC 49-21-09-03-070 PACKING (5) on the union (4).
   (9) Install the union (4) on the fan (9).
   (10) TORQUE the union (4) to between 1.77 and 1.45 m.daN (13.05 and 10.69 lbf.ft )
T.
   (11) Install the Primary Compressor Discharge (PCD) tube (2) on the union (4).
   (12) TORQUE the nut of the PCD (2) to between 1.77 and 1.45 m.daN (13.05 and 10.69 lbf.ft )
T.
   (13) Install the new
AIPC 49-52-09-01-080 PACKING (8) on the fan (9).
   (14) Put the clamp (3) into position on the fan mounting flange.
   (15) Install the fan (9) in the APU.
NOTE: Make sure that the alignment pin is engaged in the APU flange and the fan splined drive is fully engaged.
   (16) Install the clamp (3).
   (17) TORQUE the clamp (3) to between 0.748 and 0.612 m.daN (66.19 and 54.16 lbf.in )
T.
   (18) Put the fan outlet duct (1) into position and install the clamp (10).
   (19) TORQUE the clamp (10) to between 0.374 and 0.306 m.daN (33.10 and 27.08 lbf.in )
T.
   (20) Put the fan inlet duct (12) into position and install the clamps (11).
   (21) TORQUE the clamps (11) to between 0.374 and 0.306 m.daN (33.10 and 27.08 lbf.in )
T.
Subtask 49-52-51-210-052-A ** ON A/C NOT FOR ALL Subtask 49-52-51-865-055-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-52-51-710-051-A ** ON A/C NOT FOR ALL
D. Do the operational test of the APU and do a leak test.
   (1) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-010).
   (2) During the operational test of the APU do a leak test of the accessory cooling system and make sure that the system operates correctly.
NOTE: No leaks are permitted.
5. Close-up
Subtask 49-52-51-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Set the LIGHT control SW 11LJ to the OFF position.
   (3) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
   (4) Remove the access platform(s).
Subtask 49-52-51-865-056-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-52-51-860-054-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
   (3) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 01:31:29 UTC