W DOC AIRBUS | AMM A320F

Removal of the AFT Tie-Rods and Vibration Isolator (131-9(A))


TASK 49-12-53-000-003-A
Removal of the AFT Tie-Rods and Vibration Isolator (131-9(A))


WARNING: DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
WARNING: LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP PIN WHEN YOU OPEN THE ACCESS DOOR. THIS WILL PREVENT INJURY.
CAUTION: DO NOT REMOVE MORE THAN ONE APU MOUNT AT A TIME WHEN THE APU IS INSTALLED. THE APU HOIST AND THE REMAINING TWO MOUNTS MUST SUPPORT THE APU WHEN YOU REMOVE AN APU MOUNT.
FIN: 4055KM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
98A49107504001
1
PROTECTOR-THREADS,APU MOUNTING BOLTS
A1-91-265
1
HOIST-MINILIFT
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 49-00-00-480-003-A
Installation of the APU Hoist Tool
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-21-000-001-A
Removal of APU Access Door 315AL
TASK 52-41-22-000-001-A
Removal of the APU Access Door and the related Door Mechanism
3. Job Set-up
Subtask 49-12-53-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-42-00-861-001).
   (2) On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.
   (3) Put the warning notices on panel 25VU to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-12-53-865-057-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-12-53-010-052-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the access doors 315AL and 316AR.
   (2) Open or remove the APU access doors (Ref. AMM TASK 52-41-00-010-001) 315AL 316AR (Ref. AMM TASK 52-41-21-000-001) (Ref. AMM TASK 52-41-22-000-001).
   (3) Set the LIGHT SW 11LJ to the ON position.
4. Procedure
Subtask 49-12-53-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Aft Vibration Isolator
   (1) Install the A1-91-265 HOIST-MINILIFT (Ref. AMM TASK 49-00-00-480-003).
   (2) Slowly wind the handle on the APU hoist until the APU hoist-cable is in tension.
   (3) Remove the nut (9) and install the 98A49107504001 PROTECTOR-THREADS,APU MOUNTING BOLTS on the cone bolt.
   (4) Remove and discard the cotter pins (3) and (5).
   (5) Remove the castle nuts (2) and (6), the washers (1) and (7) and the bolts (4)) and (8).
   (6) Remove the tie-rods (12) and (13) from the vibration isolator.
   (7) Remove the vibration isolator (10) from the APU mount-bracket (11).
   (8) If necessary remove the tie-rods (12) and/or (13).
     (a) Remove the nuts (14), the washers (17) and the screws (16).
     (b) Disconnect the bonding straps (15).
     (c) Remove and discard the cotter pins (20).
     (d) Remove the castle nuts (19), the washers (18) and the bolts (21).
     (e) Remove the tie-rods (12) and/or (13).
[Rev.10 from 2021] 2026.04.01 12:42:26 UTC