1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY
98D34103002000
1
ADAPTERS - AIR DATA SYSTEM FLUSHING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 10-11-00-555-013-A
Installation of the Aircraft Protection Equipment
TASK 10-11-00-555-014-A
Removal of the Aircraft Protection Equipment
TASK 34-13-00-790-002-A
Leak Test of the Principal Static and Total Air Data System
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
NOTE: The hose couplings are self-sealing.
Subtask 34-10-00-010-060-A
A. Get access to the avionics compartment.
   (1) Put the ACCESS PLATFORM 1M(3 FT) in position below access door 824, at zone 128.
   (2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
Subtask 34-10-00-860-052-A
B. Connect the Dry Nitrogen Source
   (1) Remove the aircraft protection equipment, if installed (Ref. AMM TASK 10-11-00-555-014).
   (2) Disconnect the quick-disconnect coupling from the ADM 19FP4 or 19FP5 (19FP6 or 19FP7).
   (3) Connect a 98D34103002000 ADAPTERS - AIR DATA SYSTEM FLUSHING 3-pin adapter (98D34103002100) to the static pressure hose. Then connect it to the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
   (4) Attach the hose to prevent movement.
4. Procedure
Subtask 34-10-00-170-051-A
A. Flushing of the Static Pressure Line
   (1) Blow the gas into the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately 1 minute.
   (2) Make sure that there is no contamination in the pressurized gas at the outlet of the L or R static probe 1 (L or R static probe 2).
   (3) Stop the flow of gas.
   (4) Disconnect the dry nitrogen source.
   (5) Remove the 3-pin adapter .
   (6) Release the hose.
   (7) Connect the quick-disconnect coupling to the ADM 19FP4 or 19FP5 (19FP6 or 19FP7).
   (8) Make sure that you can see the blue ring on the quick-disconnect coupling.
   (9) Pull the quick-disconnect coupling to be sure that it is correctly attached.
   (10) Make sure that the quick-disconnect coupling is correctly engaged (the pin located on the quick-disconnect male part is fully engaged into the groove located in the quick-disconnect female part).
Subtask 34-10-00-170-054-A
B. After the Flushing Procedure
WARNING: IF ONE OR MORE QUICK DISCONNECT COUPLINGS ARE DISCONNECTED IN ONE SYSTEM, MAKE SURE THAT A SECOND QUALIFIED MECHANIC DOES A VISUAL INSPECTION OF THE QUICK-DISCONNECT COUPLING CONNECTIONS. THE TWO MECHANICS MUST SIGN OFF THE JOB. ******************** IF ONE OR MORE QUICK-DISCONNECT COUPLINGS ARE DISCONNECTED IN TWO OR MORE SYSTEMS, MAKE SURE THAT A SECOND QUALIFIED MECHANIC DOES A VISUAL INSPECTION OF THE QUICK-DISCONNECT COUPLING CONNECTIONS AND DOES THE LEAK TEST. THE TWO MECHANICS MUST SIGN OFF THE JOB.
   (1) Refer to the table that follows to know if you must do two checks of the quick-disconnect couplings and/or the leak test:
Condition
Two Checks of the Quick-Disconnect Couplings
Leak Test
One static circuit flushing on ADR 1 or ADR 2 circuit
Yes
No
Two static circuit flushing on ADR 1 and ADR 2 circuits
Yes
Yes
Total and static circuit flushing on ADR 3 and ISIS circuits
Yes
Yes
     (a) If you must do two checks of the quick-disconnect coupling:
  • Tell a second qualified mechanic to do a visual inspection of the quick-disconnect coupling (the signature of the two mechanics is mandatory).
  • Make sure that the quick-disconnect coupling is correctly engaged (the pin located on the quick-disconnect male part must be fully engaged into the groove in the quick-disconnect female part).
     (b) If you must do the leak test, do the leak test of the principal static and total air-data system (Ref. AMM TASK 34-13-00-790-002).
   (2) Install the aircraft protection equipment, if necessary (Ref. AMM TASK 10-11-00-555-013).
5. Close-up
Subtask 34-10-00-410-060-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
   (3) Remove the access platform(s).