Operational Test of the Cabin Attendant Work-Light
TASK 33-27-00-710-001-A
Operational Test of the Cabin Attendant Work-Light
1. Reason for the Job
To make sure that the cabin attendant work-lights operate correctly.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 33-27-00-860-050-A
Subtask 33-27-00-710-051-A ** ON A/C NOT FOR ALL
Subtask 33-27-00-862-050-A
[Rev.10 from 2021]
2026.04.01 06:18:00 UTC
Operational Test of the Cabin Attendant Work-Light
1. Reason for the Job
To make sure that the cabin attendant work-lights operate correctly.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 33-27-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 33-27-00-865-053-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 2000VU | LIGHT-ATTND-WORK | 1LZ | J03 |
Subtask 33-27-00-710-051-A ** ON A/C NOT FOR ALL
A. Do this test of the cabin attendant work-lights.
Subtask 33-27-00-710-051-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the Forward Attendant Panel (FAP) 120RH: | On the FAP (120RH): |
|
|
| 2.On the switch panels: | On the circuit breaker panels and the Passenger Service Information Unit (PSIU): |
|
|
| 3.On the FAP (120RH): | On the FAP (120RH): |
|
|
| | On the circuit breaker panels and the PSIU: |
| |
|
| On the FAP (120RH): | On the FAP (120RH): |
|
|
| | On the circuit breaker panels and the PSIU. |
| |
|
NOTE: The last instruction from the cabin-attendant work-light pushbutton-switch is kept in the memory of the reading-light power unit for 1 to 10 seconds. | |
| 4.On the switch panels: | On the circuit breaker panels and the PSIU: |
|
|
| 5.On the FAP (120RH): | On the FAP (120RH): |
|
|
A. Operational Test
(1) Do the operational test of the cabin attendant work-lights:
Subtask 33-27-00-740-050-A ** ON A/C NOT FOR ALL (1) Do the operational test of the cabin attendant work-lights:
| ACTION | RESULT |
|---|---|
| 1.On Flight Attendant Panel (FAP) 120RH: | On the FAP (120RH): |
|
|
|
|
| 2.For the cabin attendant work-lights, on the related switch panel: | |
| | On the related panel: |
|
|
|
|
NOTE: If two attendant seats are installed in the aft entry area:
- The FWD switch in the flight direction controls the inboard seat.
- The AFT switch in the flight direction controls the outboard seat.
B. Do this BITE test of the cabin attendant work-lights and passenger reading lights on the Programming and Test Panel (PTP) 110RH.
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the FAP 120RH: | On the FAP 120RH: |
|
|
| 2.On the PTP 110RH: | On the PTP 110RH: |
|
|
|
|
| |
|
|
| |
|
| | In the cabin: |
| |
|
| | On the PTP 110RH: |
| |
|
| 3.On the PTP 110RH: | On the PTP 110RH: |
|
|
| 4.On the FAP 120RH: | On the FAP 120RH: |
|
|
Subtask 33-27-00-862-050-A
A. Put the aircraft back to the serviceable condition.
(1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).