W DOC AIRBUS | AMM A320F

Remove Nose Landing Gear for Special Detailed Inspection in Shop


TASK 32-21-00-200-802-A
Remove Nose Landing Gear for Special Detailed Inspection in Shop


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
ZONE: 710
1. Reason for the Job
Refer to the MPD TASK: 322111-01
REMOVE NOSE LANDING GEAR FOR SPECIAL DETAILED INSPECTION IN SHOP
You must do this task as per the related CMM.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
710
NOSE GEAR AND DOORS
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 32-21-11-000-003-A
Removal of the NLG Leg Assembly
TASK 32-21-11-400-003-A
Installation of the NLG Leg Assembly
TASK 32-21-16-000-002-A
Removal of the NLG Drag-Strut Assy
TASK 32-21-16-000-002-A-02
Removal of the Nose Landing Gear (NLG) Drag-Strut Assy (EV NLG)
TASK 32-21-16-400-002-A
Installation of the NLG Drag-Strut Assy
TASK 32-21-16-400-002-A-02
Installation of the Nose Landing Gear (NLG) Drag-Strut Assy (EV NLG)
3. Job Set-up
Subtask 32-21-00-020-053-A
A. Removal before Inspection
   (1) Remove the NLG leg assembly (Ref. AMM TASK 32-21-11-000-003).
NOTE: When you remove the NLG leg assembly, it is not necessary to remove all the Line Replaceable Units (LRUs). Refer to MPD Appendix 7 for these LRUs.
   (2) Remove the NLG drag-strut assembly (Ref. AMM TASK 32-21-16-000-002).
4. Procedure
Subtask 32-21-00-220-069-A
A. Special Detailed Inspection (Overhaul) of Nose Gear (Off Aircraft)
  • Refer to MPD Appendix 7.
5. Close-up
Subtask 32-21-00-420-053-A
A. Installation after Inspection
   (1) Install the NLG drag-strut assembly (Ref. AMM TASK 32-21-16-400-002).
   (2) Install the NLG leg assembly (Ref. AMM TASK 32-21-11-400-003).
[Rev.10 from 2021] 2026.04.01 00:41:48 UTC