W DOC AIRBUS | AMM A320F

Operational Test of the Waste-Water Ice-Protection Heater-Elements


TASK 30-71-00-710-002-A
Operational Test of the Waste-Water Ice-Protection Heater-Elements


ZONE: 130
ZONE: 160
FIN: 140DU ** ON A/C NOT FOR ALL
FIN: 23DW ** ON A/C NOT FOR ALL
FIN: 25DU ** ON A/C NOT FOR ALL
FIN: 3DW
FIN: 33DW ** ON A/C NOT FOR ALL
FIN: 35DU ** ON A/C NOT FOR ALL
FIN: 53DW ** ON A/C NOT FOR ALL
FIN: 80DU ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
FOR [140DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
FOR [35DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
160
BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT
162CW
132JW
132KW
152FW
FOR [140DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
132KW
FOR [35DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
162CW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-54-12-000-003-A
Removal of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-54-12-400-003-A
Installation of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-55-11-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59
TASK 25-55-11-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59
TASK 25-55-12-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 25-55-12-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
FOR [140DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
TASK 25-54-12-000-003-A
Removal of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-54-12-400-003-A
Installation of the Sidewall Panels in the Forward Cargo Compartment
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
FOR [35DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
TASK 25-55-12-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 25-55-12-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
3. Job Set-up
Subtask 30-71-00-861-052-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 30-71-00-865-075-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUWASTE WIP-DRAINMAST-FWD1DUB06
** ON A/C NOT FOR ALL
2000VUPOT/WASTE WIP-HEATER-LINE21DWA03
2000VUPOT/WASTE WIP-HEATER-LINE1DWA02
2000VUPOT/WASTE WIP-HEATER-CTL2DWA01
** ON A/C NOT FOR ALL
2000VUDRAINMAST-FWD1DUB03
** ON A/C NOT FOR ALL
2000VUPOT WIP-HEATER-LINE21DWA03
2000VUWASTE WIP-DRAINMAST-FWD1DUB03
2000VUWASTE WIP-HEATER-CTL9DUB02
2000VUWASTE WIP-HEATER-LINE8DUB01
** ON A/C NOT FOR ALL
2000VUPOT WIP-HEATER-LINE1DWA02
2000VUPOT WIP-HEATER-CTL2DWA01
** ON A/C NOT FOR ALL
2000VUWASTE WIP-HEATER-CTL9DUB05
2000VUWASTE WIP-HEATER-LINE8DUB04
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP-HEATER-CTL32DWD02
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP-HEATER-LINE51DWD04
2001VUPOT/WASTE WIP-HEATER-LINE31DWD03
2001VUWASTE WIP-HEATER-LINE31DUE04
** ON A/C ALL
2001VUWASTE WIP-DRAINMAST-AFT11DUE01
** ON A/C NOT FOR ALL
2001VUPOT/WASTE WIP HEATER CTL32DWD02
2001VUWASTE WIP-HEATER-LINE22DUE04
2001VUWASTE WIP-HEATER-CTL10DUE03
2001VUWASTE WIP-DRAINMAST-MID21DUE02
Subtask 30-71-00-010-050-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) For control unit 3DW:
     (a) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
     (b) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the forward cargo-compartment door.
     (c) Set cargo-compartment light switch 6LU to the ON position.
     (d) Remove sidewall panel 132JW (Ref. AMM TASK 25-54-12-000-003).
Subtask 30-71-00-010-050-C ** ON A/C NOT FOR ALL
C. Get Access
   (1) For control unit 3DW:
     (a) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
     (b) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the forward cargo-compartment door.
     (c) Set cargo-compartment light switch 6LU to the ON position.
     (d) Remove sidewall panel 132JW (Ref. AMM TASK 25-54-12-000-003).
   (2) For control unit 35DU:
     (a) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
     (b) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the aft cargo-compartment door.
     (c) Set cargo-compartment light switch 8LU to the ON position.
     (d) Remove sidewall panel 162CW (Ref. AMM TASK 25-55-12-000-003).
Subtask 30-71-00-010-050-D ** ON A/C NOT FOR ALL
C. Get Access
   (1) For the control unit 140DU:
     (a) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
     (b) Set the CARGO COMPT LIGHT switch 6LU to the ON position.
     (c) Remove the sidewall panel 132KW (Ref. AMM TASK 25-54-12-000-003).
Subtask 30-71-00-010-050-H ** ON A/C NOT FOR ALL
C. Get Access
   (1) For the control unit 140DU:
     (a) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
     (b) Set the CARGO COMPT LIGHT switch 6LU to the ON position.
     (c) Remove the sidewall panel 132KW (Ref. AMM TASK 25-54-12-000-003).
   (2) For the control unit 80DU:
     (a) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
     (b) Set the CARGO COMPT LIGHT switch 8LU to the ON position.
     (c) Remove the sidewall panel 152FW (Ref. AMM TASK 25-55-11-000-003).
Subtask 30-71-00-010-050-T ** ON A/C NOT FOR ALL
C. Get Access
   (1) FOR [140DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
:
     (a) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
     (b) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the forward cargo-compartment door.
     (c) Set cargo-compartment light switch 6LU to ON.
     (d) Remove sidewall panel 132KW (Ref. AMM TASK 25-54-12-000-003).
   (2) FOR [35DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
:
     (a) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
     (b) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the aft cargo-compartment door.
     (c) Set cargo-compartment light switch 8LU to ON.
     (d) Remove sidewall panel 162CW (Ref. AMM TASK 25-55-12-000-003).
4. Procedure
Subtask 30-71-00-710-051-A ** ON A/C NOT FOR ALL
A. Do this test.
NOTE: Control unit 3DW controls and monitors heaters of the potable-water ice-protection (HTR I/II) and of the waste-water ice-protection (HTR III/IV). The result of HTR I/II is shown in parentheses, because the primary function of this test is the waste-water ice protection system.
ACTION
RESULT
1.On control unit 3DW:
  • Push and hold the TEST pushbutton.
On control unit 3DW:
  • The green LED III/IV (I/II) comes on.
  • Release the TEST pushbutton.
  • The green LED III/IV (I/II) goes off.
Subtask 30-71-00-710-051-C ** ON A/C NOT FOR ALL
A. Do this test:
NOTE: The primary function of this test is to do an operational check of the waste-water ice-protection system. The test results related to the heaters of the potable-water ice-protection system are shown in parentheses. The below control units are used to control and monitor the heaters:
  • For potable-water ice-protection system 3DW
  • For waste-water ice-protection system 3DW and 35DU.
ACTION
RESULT
1.On control unit 3DW:
  • Push and hold the TEST pushbutton switch.
On control unit 3DW:
  • The green LED III/IV (I/II) comes on.
  • Release the TEST pushbutton switch.
  • The green LED III/IV (I/II) goes off.
2.On control unit 35DU:
  • Push and hold the TEST pushbutton switch.
On control unit 35DU:
  • The green LED I/II and III/IV comes on.
  • Release the TEST pushbutton switch.
  • The green LED I/II and III/IV goes off.
Subtask 30-71-00-710-051-D ** ON A/C NOT FOR ALL
A. Do this test.
ACTION
RESULT
1.On the control unit 140DU at FR28:
  • Push and hold the TEST pushbutton.
On the control unit 140DU:

  • The green LED I/II (III/IV) comes on.
  • Release the TEST pushbutton.
  • The green LED I/II (III/IV) goes off.
Subtask 30-71-00-710-051-P ** ON A/C NOT FOR ALL
A. Do this test.
ACTION
RESULT
1.On control unit 140DU at frame 28:
  • Push and hold the TEST pushbutton.
On control unit 140DU:

  • The green LED I/II (III/IV) comes on.
  • Release the TEST pushbutton.
  • The green LED I/II (III/IV) goes off.
2.On control unit 35DU at frame 64:
  • Push and hold the TEST pushbutton.
On control unit 35DU:
  • The green LED I/II (III/IV) comes on.
  • Release the TEST pushbutton.
  • The green LED I/II (III/IV) goes off.
3.On control unit 80DU at frame 52:
  • Push and hold the TEST pushbutton.
On control unit 80DU:

  • The green LED I/II (III/IV) comes on.
  • Release the TEST pushbutton.
  • The green LED I/II (III/IV) goes off.
Subtask 30-71-00-710-051-V ** ON A/C NOT FOR ALL
A. Do this test
ACTION
RESULT
1.On control unit 140DU:
  • Push and hold the TEST pushbutton switch.
On control unit 140DU:
  • The green LED (Heater I/II) comes on.
  • Release the TEST pushbutton switch.
  • The green LED (Heater I/II) goes off.
2.On control unit 35DU:
  • Push and hold the TEST pushbutton switch.
On control unit 35DU:
  • The two green LEDs (Heaters I and III) come on.
  • Release the TEST pushbutton switch.
  • The two green LEDs (Heaters I and III) go off.
5. Close-up
Subtask 30-71-00-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For control unit 3DW:
     (a) Install sidewall panel 132JW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set cargo-compartment light switch 6LU to the OFF position.
     (c) Remove the access platform(s).
     (d) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
Subtask 30-71-00-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For control unit 35DU:
     (a) Install sidewall panel 162CW (Ref. AMM TASK 25-55-12-400-003).
     (b) Set cargo-compartment light switch 8LU to the OFF position.
     (c) Remove the access platform(s).
     (d) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
   (3) For control unit 3DW:
     (a) Install sidewall panel 132JW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set cargo-compartment light switch 6LU to the OFF position.
     (c) Remove the access platform(s).
     (d) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
Subtask 30-71-00-410-050-D ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the control unit 140DU:
     (a) Install the sidewall panel 132KW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set the CARGO COMPT LIGHT switch 6LU to the OFF position.
     (c) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 30-71-00-410-050-H ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the control unit 140DU:
     (a) Install the sidewall panel 132KW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set the CARGO COMPT LIGHT switch 6LU to the OFF postion.
     (c) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (3) For the control unit 80DU:
     (a) Install the sidewall panel 152FW (Ref. AMM TASK 25-55-11-400-003).
     (b) Set the CARGO COMPT LIGHT switch 8LU to the OFF position.
     (c) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 30-71-00-410-050-T ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) FOR [140DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
:
     (a) Install sidewall panel 132KW (Ref. AMM TASK 25-54-12-400-003).
     (b) Set cargo-compartment light switch 6LU to OFF.
     (c) Remove the access platform(s).
     (d) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
   (3) FOR [35DU] (CONTROL UNIT, WASTE WATER ICE PROTECTION-)
:
     (a) Install sidewall panel 162CW (Ref. AMM TASK 25-55-12-400-003).
     (b) Set cargo-compartment light switch 8LU to OFF.
     (c) Remove the access platform(s).
     (d) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
Subtask 30-71-00-862-053-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 08:22:38 UTC