Installation of the Eye-End of the RAT Actuator
TASK 29-22-53-400-007-A
Installation of the Eye-End of the RAT Actuator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 29-22-53-860-072-B
Subtask 29-22-53-420-059-B
Subtask 29-22-53-860-073-B
[Rev.10 from 2021]
2026.04.01 00:26:28 UTC
Installation of the Eye-End of the RAT Actuator
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU EXTEND/RETRACT THE RAT.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-22-00-820-004-A | Adjustment of the RAT Doors |
| TASK 29-22-00-869-005-A | Extension of the Ram Air Turbine (RAT) on the Ground |
Subtask 29-22-53-860-072-B
A. Aircraft Maintenance Configuration
(1) Make sure that the SAFETY BARRIER(S) is in position.
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the Blue hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the RAT is extended (Ref. AMM TASK 29-22-00-869-005).
Subtask 29-22-53-865-069-A (1) Make sure that the SAFETY BARRIER(S) is in position.
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the Blue hydraulic system.
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Blue hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Blue hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the RAT is extended (Ref. AMM TASK 29-22-00-869-005).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | D14 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | B13 |
| ** ON A/C ALL | |||
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| 121VU | HYDRAULIC/RAT/SPLY/EXTN/SOL1 | 2803GE | P33 |
Subtask 29-22-53-420-059-B
A. Installation of the Eye-End of the RAT Actuator
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the thread of the eye-end (4).
(5) Assemble the nut (3) and the locking device (2) on the eye-end (4).
(6) Install the eye-end (4) in the RAT actuator (1).
(7) Turn the eye-end (4) until the distance "Y" is the same as you recorded during the removal procedure.
(8) Tighten the nut (3) and make sure that the serrations of the locking device (2) engage correctly.
(9) TORQUE the nut (3) to between 8.81 and 8.13 m.daN (64.97 and 59.96 lbf.ft )
.
(10) Safety the nut (3) and the locking device (2) with the lockwire,14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(11) Put the eye-end (4) in its correct position at the leg assembly (5).
(12) Install the bolt (6), the washers (7), (8) and the nut (9).
(13) TORQUE the nut (9) to between 5.29 and 4.74 m.daN (39.01 and 34.96 lbf.ft )
.
Subtask 29-22-53-820-052-B (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the thread of the eye-end (4).
(5) Assemble the nut (3) and the locking device (2) on the eye-end (4).
(6) Install the eye-end (4) in the RAT actuator (1).
(7) Turn the eye-end (4) until the distance "Y" is the same as you recorded during the removal procedure.
(8) Tighten the nut (3) and make sure that the serrations of the locking device (2) engage correctly.
(9) TORQUE the nut (3) to between 8.81 and 8.13 m.daN (64.97 and 59.96 lbf.ft )
. (10) Safety the nut (3) and the locking device (2) with the lockwire,
(11) Put the eye-end (4) in its correct position at the leg assembly (5).
(12) Install the bolt (6), the washers (7), (8) and the nut (9).
(13) TORQUE the nut (9) to between 5.29 and 4.74 m.daN (39.01 and 34.96 lbf.ft )
. B. Adjustment of the RAT Actuator
(1) Make sure that the adjustment of the RAT actuator is correct. If necessary, do the adjustment procedure of the RAT actuator (Ref. AMM TASK 29-22-00-820-004).
5. Close-up(1) Make sure that the adjustment of the RAT actuator is correct. If necessary, do the adjustment procedure of the RAT actuator (Ref. AMM TASK 29-22-00-820-004).
Subtask 29-22-53-860-073-B
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Eye-End of the RAT Actuator