Installation of the Hydraulic Pressure Tubes
TASK 29-11-49-400-011-A
Installation of the Hydraulic Pressure Tubes
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 29-11-49-860-053-A ** ON A/C NOT FOR ALL
Subtask 29-11-49-860-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:17:34 UTC
Installation of the Hydraulic Pressure Tubes
WARNING:
DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM YOUR EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU GET HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V01-002) | cleaning fluid |
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB | |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-11-49-000-011-A | Removal of the Hydraulic Pressure Tubes |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 78-31-00-710-041-A | Operational Test of the Thrust Reverser System with the CFDS |
| TASK 78-31-00-710-041-A-02 | Operational test of the Thrust Reverser without the CFDS and Engine Running |
| FOR [1000EM1] (ENGINE-1) | |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
Subtask 29-11-49-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(2) Make sure that the Green hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
Subtask 29-11-49-941-055-A ** ON A/C NOT FOR ALL (1) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(2) Make sure that the Green hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
- on the ground service panel 197CB.
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
(6) Make sure that a CONTAINER 5 L (1.32 USGAL) is below the suction-hose adapter connection to the hydraulic pump.
Subtask 29-11-49-010-055-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
- make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine.
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
- in the cockpit, on the HYD section of the overhead panel 40VU.
- make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(6) Make sure that a CONTAINER 5 L (1.32 USGAL) is below the suction-hose adapter connection to the hydraulic pump.
C. Get Access
(1) Make sure that the left fan cowl is open:
(a) FOR [1000EM1] (ENGINE-1)
make sure that the doors 437AL 438AR are open (Ref. AMM TASK 71-13-00-010-010).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the engine.
4. Procedure(1) Make sure that the left fan cowl is open:
(a) FOR [1000EM1] (ENGINE-1)
make sure that the doors 437AL 438AR are open (Ref. AMM TASK 71-13-00-010-010).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the engine.
NOTE: It is permitted to hand tighten the tube and hose connections to make installation easier. Once all the tubes/hoses are installed, torque tighten the connections to the correct values.
Subtask 29-11-49-420-054-A ** ON A/C NOT FOR ALL A. Clean the replacement parts and their interfaces.
(1) Remove the applicable COVER - BLANKING from the openings.
(2) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) , made moist with the cleaning fluid (Material No.V01-002) and clean the replacement parts and their interfaces.
(3) Use a clean, dry Textile-Lint free Cotton - (Material No.14SBA1) and remove the dirty cleaning fluid from the parts while they are wet.
(4) Lightly lubricate the threads and abutment faces of the hydraulic system tube/hose nuts, unions and couplings with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) used in the aircraft hydraulic system.
Subtask 29-11-49-420-051-A ** ON A/C NOT FOR ALL (1) Remove the applicable COVER - BLANKING from the openings.
(2) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) , made moist with the cleaning fluid (Material No.V01-002) and clean the replacement parts and their interfaces.
(3) Use a clean, dry Textile-Lint free Cotton - (Material No.14SBA1) and remove the dirty cleaning fluid from the parts while they are wet.
(4) Lightly lubricate the threads and abutment faces of the hydraulic system tube/hose nuts, unions and couplings with the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) used in the aircraft hydraulic system.
B. Install the hydraulic pressure tubes.
PRE SBN 29-0001
(1) Make sure that these parts are installed in the positions they were removed from (Ref. AMM TASK 29-11-49-000-011).
(a) The clamps (14), (17), (37) and (39)
(b) The bolts (13), (16), (36) and (40).
(c) The hoses (4), (6) and (7) and the tube (11).
(2) Install the tube (11).
(a) Put the tube on the engine, in the correct position for installation.
(b) Attach the connector nut of the tube to the union (32). Tighten the connector nut with your hand.
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the bulkhead union nut of the union (32) to between 600 and 500 lbf.in (6.78 and 5.65 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(e) Loosely assemble the two halves of the clamp (39) and the three bolts (40) to the raft (38).
(f) Remove the safety ties from the clamp (39) and the raft (38).
(g) Loosely assemble the two halves of the clamp (37) and the three bolts (36) to the raft (34).
(h) Remove the safety ties from the clamp (37) and the raft (34).
(i) Hold the union (32) with an applicable wrench.
(j) TORQUE the connector nut of the tube (11) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(k) TORQUE the bolts (36) and (40) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(3) Install the hose (6).
(a) Connect the hose to the tube (11) and the union (35).
(b) Hold the union (35) with an applicable wrench.
(c) TORQUE the end connector of the hose (6) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(d) Hold the tube (11) and TORQUE the end connector of the hose (6) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Install the lower hose (7).
PRE SBN 29-0265
(a) Connect the hose to the tube (11) and the union (57).
(b) Hold the end of the tube (11) with an applicable wrench.
(c) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(d) Hold the union (57) with an applicable wrench.
(e) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF PRE SBN 29-0265
POST SBN 29-0265
(f) Connect the hose to the tube (11) and the dampener (58).
(g) Hold the end of the tube (11) with an applicable wrench.
(h) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(i) Hold the dampener (58) with an applicable wrench.
(j) TORQUE the connector nut of the hose (7) to between 840 and 752 lbf.in (9.49 and 8.50 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBN 29-0265
(5) Install the upper hose (4).
(a) Put the upper hose in to the clamps (14) and (17) in the correct position for installation.
(b) Connect the upper hose (4) to the union (32).
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the connector nut of the upper hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(e) Connect the upper hose (4) at the aircraft pylon interface.
(f) TORQUE the connector nut of the upper hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(g) Install the bolt (13) to the clamp (14).
(h) TORQUE the bolt (13) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(i) Install the bolt (16) to the clamp (17).
(j) TORQUE the bolt (16) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
Subtask 29-11-49-420-053-A ** ON A/C NOT FOR ALL PRE SBN 29-0001
(1) Make sure that these parts are installed in the positions they were removed from (Ref. AMM TASK 29-11-49-000-011).
(a) The clamps (14), (17), (37) and (39)
(b) The bolts (13), (16), (36) and (40).
(c) The hoses (4), (6) and (7) and the tube (11).
(2) Install the tube (11).
(a) Put the tube on the engine, in the correct position for installation.
(b) Attach the connector nut of the tube to the union (32). Tighten the connector nut with your hand.
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the bulkhead union nut of the union (32) to between 600 and 500 lbf.in (6.78 and 5.65 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (e) Loosely assemble the two halves of the clamp (39) and the three bolts (40) to the raft (38).
(f) Remove the safety ties from the clamp (39) and the raft (38).
(g) Loosely assemble the two halves of the clamp (37) and the three bolts (36) to the raft (34).
(h) Remove the safety ties from the clamp (37) and the raft (34).
(i) Hold the union (32) with an applicable wrench.
(j) TORQUE the connector nut of the tube (11) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (k) TORQUE the bolts (36) and (40) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (3) Install the hose (6).
(a) Connect the hose to the tube (11) and the union (35).
(b) Hold the union (35) with an applicable wrench.
(c) TORQUE the end connector of the hose (6) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (d) Hold the tube (11) and TORQUE the end connector of the hose (6) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Install the lower hose (7).
PRE SBN 29-0265
(a) Connect the hose to the tube (11) and the union (57).
(b) Hold the end of the tube (11) with an applicable wrench.
(c) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (d) Hold the union (57) with an applicable wrench.
(e) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF PRE SBN 29-0265
POST SBN 29-0265
(f) Connect the hose to the tube (11) and the dampener (58).
(g) Hold the end of the tube (11) with an applicable wrench.
(h) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (i) Hold the dampener (58) with an applicable wrench.
(j) TORQUE the connector nut of the hose (7) to between 840 and 752 lbf.in (9.49 and 8.50 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBN 29-0265
(5) Install the upper hose (4).
(a) Put the upper hose in to the clamps (14) and (17) in the correct position for installation.
(b) Connect the upper hose (4) to the union (32).
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the connector nut of the upper hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (e) Connect the upper hose (4) at the aircraft pylon interface.
(f) TORQUE the connector nut of the upper hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (g) Install the bolt (13) to the clamp (14).
(h) TORQUE the bolt (13) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (i) Install the bolt (16) to the clamp (17).
(j) TORQUE the bolt (16) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). C. Install the hydraulic pressure tubes.
POST SBN 29-0001
SBN 29-0001: Hydraulic hose changed and raft extension added at LP switch.
(1) Make sure that these parts are installed in the positions they were removed from (Ref. AMM TASK 29-11-49-000-011).
(a) The clamps (14), (17), (37) and (39)
(b) The bolts (13), (16), (36) and (40).
(c) The hoses (4), (19) and (7) and the tube (11).
(2) Install the tube (11).
(a) Put the tube on the engine, in the correct position for installation.
(b) Attach the connector nut of the tube to the union (32). Tighten the connector the nut with your hand.
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the bulkhead union nut of the union (32) to between 600 and 500 lbf.in (6.78 and 5.65 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(e) Loosely assemble the two halves of the clamp (39) and the three bolts (40) to the raft (38).
(f) Remove the safety ties from the clamp (39) and the raft (38).
(g) Loosely assemble the two halves of the clamp (37) and the three bolts (36) to the raft (41).
(h) Remove the safety ties from the clamp (37) and the raft (41).
(i) Hold the union (32) with an applicable wrench.
(j) TORQUE the connector nut of the tube (11) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(k) TORQUE the bolts (36) and (40) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(3) Install the hose (19).
(a) Connect the hose to the tube (11) and the union (42).
(b) Hold the union (42) with an applicable wrench.
(c) TORQUE the end connector of the hose (19) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(d) Hold the tube (11) and TORQUE the end connector of the hose (19) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Install the lower hose (7).
PRE SBN 29-0265
(a) Connect the hose to the tube (11) and the union (57).
(b) Hold the end of the tube (11) with an applicable wrench.
(c) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(d) Hold the union (57) with an applicable wrench.
(e) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF PRE SBN 29-0265
POST SBN 29-0265
(f) Connect the hose to the tube (11) and the dampener (58).
(g) Hold the end of the tube (11) with an applicable wrench.
(h) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(i) Hold the dampener (58) with an applicable wrench.
(j) TORQUE the connector nut of the hose (7) to between 840 and 752 lbf.in (9.49 and 8.50 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBN 29-0265
(5) Install the upper hose (4).
(a) Put the hose into the clamps (14) and (17) in the correct position for installation.
(b) Connect the hose (4) to the union (32).
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the connector nut of the hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(e) Connect the upper hose (4) at the aircraft pylon interface.
(f) TORQUE the connector nut of the hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(g) Install the bolt (13) to the clamp (14).
(h) TORQUE the bolt (13) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(i) Install the bolt (16) to the clamp (17).
(j) TORQUE the bolt (16) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(6) Remove the container.
Subtask 29-11-49-710-051-A ** ON A/C NOT FOR ALL POST SBN 29-0001
SBN 29-0001: Hydraulic hose changed and raft extension added at LP switch.
(1) Make sure that these parts are installed in the positions they were removed from (Ref. AMM TASK 29-11-49-000-011).
(a) The clamps (14), (17), (37) and (39)
(b) The bolts (13), (16), (36) and (40).
(c) The hoses (4), (19) and (7) and the tube (11).
(2) Install the tube (11).
(a) Put the tube on the engine, in the correct position for installation.
(b) Attach the connector nut of the tube to the union (32). Tighten the connector the nut with your hand.
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the bulkhead union nut of the union (32) to between 600 and 500 lbf.in (6.78 and 5.65 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (e) Loosely assemble the two halves of the clamp (39) and the three bolts (40) to the raft (38).
(f) Remove the safety ties from the clamp (39) and the raft (38).
(g) Loosely assemble the two halves of the clamp (37) and the three bolts (36) to the raft (41).
(h) Remove the safety ties from the clamp (37) and the raft (41).
(i) Hold the union (32) with an applicable wrench.
(j) TORQUE the connector nut of the tube (11) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (k) TORQUE the bolts (36) and (40) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (3) Install the hose (19).
(a) Connect the hose to the tube (11) and the union (42).
(b) Hold the union (42) with an applicable wrench.
(c) TORQUE the end connector of the hose (19) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (d) Hold the tube (11) and TORQUE the end connector of the hose (19) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Install the lower hose (7).
PRE SBN 29-0265
(a) Connect the hose to the tube (11) and the union (57).
(b) Hold the end of the tube (11) with an applicable wrench.
(c) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (d) Hold the union (57) with an applicable wrench.
(e) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF PRE SBN 29-0265
POST SBN 29-0265
(f) Connect the hose to the tube (11) and the dampener (58).
(g) Hold the end of the tube (11) with an applicable wrench.
(h) TORQUE the connector nut of the hose (7) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (i) Hold the dampener (58) with an applicable wrench.
(j) TORQUE the connector nut of the hose (7) to between 840 and 752 lbf.in (9.49 and 8.50 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBN 29-0265
(5) Install the upper hose (4).
(a) Put the hose into the clamps (14) and (17) in the correct position for installation.
(b) Connect the hose (4) to the union (32).
(c) Hold the union (32) with an applicable wrench.
(d) TORQUE the connector nut of the hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (e) Connect the upper hose (4) at the aircraft pylon interface.
(f) TORQUE the connector nut of the hose (4) to between 945 and 855 lbf.in (10.68 and 9.66 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (g) Install the bolt (13) to the clamp (14).
(h) TORQUE the bolt (13) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (i) Install the bolt (16) to the clamp (17).
(j) TORQUE the bolt (16) to between 110 and 90 lbf.in (1.24 and 1.02 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (6) Remove the container.
D. Operational Test
(1) Do the operational test of thrust reverser (Ref. AMM TASK 78-31-00-710-041).
(2) Make sure that there are no leaks from the connections.
(3) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
5. Close-up(1) Do the operational test of thrust reverser (Ref. AMM TASK 78-31-00-710-041).
(2) Make sure that there are no leaks from the connections.
(3) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
Subtask 29-11-49-860-054-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tools and other items.
Subtask 29-11-49-410-051-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tools and other items.
B. Close Access
(1) Close the fan cowl doors:
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR (Ref. AMM TASK 71-13-00-410-010).
(2) Close the door 195BB.
Subtask 29-11-49-942-050-A ** ON A/C NOT FOR ALL (1) Close the fan cowl doors:
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR (Ref. AMM TASK 71-13-00-410-010).
(2) Close the door 195BB.
C. Safety precautions
(1) Remove the WARNING NOTICE(S).
(1) Remove the WARNING NOTICE(S).
Hydraulic Tube Details