W DOC AIRBUS | AMM A320F

Installation of the Servo Mechanism and Actuator


TASK 25-52-51-400-001-A
Installation of the Servo Mechanism and Actuator


WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
ZONE: 130
ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
SCRAPER - PLASTIC
No specific
1
SCRAPER - WOODEN
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.06AAC1)
Polysulfide Sealant-General Purpose Interfay -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ACC1)
Corrosion Preventive Compound-Heavy Duty Soft Film -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
25
COTTER PIN
AIPC 25-52-02-12-190
25
COTTER PIN
AIPC 25-52-02-12-390
25
COTTER PIN
AIPC 25-52-04-12-190
25
COTTER PIN
AIPC 25-52-82-12-350
25
COTTER PIN
AIPC 25-52-84-12-240
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 25-52-00-710-004-A
Operational Test of the Door Sill Latches in the Forward Cargo Compartment and in the Aft Cargo Compartment
TASK 25-52-00-820-001-A
Adjustment of the Servo Mechanism
TASK 25-52-22-000-001-A
Removal of the Ball Mats and the Ball Strips
TASK 25-52-22-400-001-A
Installation of the Ball Mats and the Ball Strips
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
TASK 52-30-00-080-001-A
Removal of the Safety Support Equipment
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 25-52-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the forward and/or aft cargo-compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the applicable cargo-compartment door.
   (3) Make sure that the warning notice is in position at the applicable control panel of the cargo loading system.
   (4) Make sure that the ball strip and ball mats are removed (Ref. AMM TASK 25-52-22-000-001).
Subtask 25-52-51-865-059-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUSEMI AUTO CLS-FWD3MYE08
2000VUSEMI AUTO CLS-FWD2MYE06
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
4. Procedure
Subtask 25-52-51-910-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the sealant from the components with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a SCRAPER - WOODEN or SCRAPER - PLASTIC.
   (4) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the thread and the shaft of the screws.
Subtask 25-52-51-420-054-A ** ON A/C NOT FOR ALL
B. Installation of the Servo Mechanism and the Actuator
   (1) Install the actuator 20MY and/or 120MY:
F Actuators ** ON A/C NOT FOR ALL
     (a) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) to the mating surface of the support brackets.
     (b) Put the actuator (35) with the drawbar assembly (20) in their installation positions below the roller track.
     (c) Install the screws (32).
     (d) Remove the blanking caps from the receptacle (34) and the electrical connector (33).
     (e) Connect the electrical connector (33) to the receptacle (34).
   (2) Install the servo mechanism:
F Servo Mechanism ** ON A/C NOT FOR ALL
     (a) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) to the mating surface of the support assembly (27).
     (b) Put the support assembly (27) in position and lower the shaft (10) into the hole of the roller track.
     (c) Install the bolts (16).
     (d) Install the actuation lever (23) on the shaft (10) with the nut (22).
     (e) Attach the hook end of the tension spring (26) to the actuation lever (23).
     (f) Put the drawbar (20) in the fork end of the actuation lever (23).
     (g) Install the pin (19) and the washer (21) and safety the pin (19) with the new AIPC 25-52-02-12-190 COTTER PIN (25) or AIPC 25-52-82-12-350 COTTER PIN (25) or AIPC 25-52-02-12-390 COTTER PIN (25) / AIPC 25-52-04-12-190 COTTER PIN (25) or AIPC 25-52-84-12-240 COTTER PIN (25).
     (h) Remove the blanking plugs from the electrical receptacles (48).
     (i) Install the electrical receptacles (48) in the support assembly (27).
     (j) Align the holes of the electrical receptacles (48) with those of the support assembly (27).
     (k) Install the screws (45), the washers (46) and the nuts (47).
     (l) Install the screws (18).
   (3) Install the door-sill latch lever (referred to as the lever):
F Door-Sill Latch Lever ** ON A/C NOT FOR ALL
     (a) Carefully lower the lever (8) onto the shaft (10). Make sure that you do not cause damage to the pin (11).
     (b) At the same time, move the lever (8) to the DOWN position until the adjustment pin moves back. This is to give clearance for the shaft (10).
     (c) Apply a layer of Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the adjustment pin. This makes sure that it moves freely.
     (d) Move the lever (8) to the UP position until the adjustment pin engages in the shaft (10).
     (e) Put the plate (7) in its installation position.
     (f) Install the screw (6).
     (g) Install the tension spring (5).
     (h) Attach the drawbars (9) to the door-sill latches with the Bolt-Retainings (4).
     (i) Remove the blanking caps from the electrical connectors (3).
     (j) Connect the electrical connectors (3) to the receptacles (48).
     (k) Put the protective cover (2) in its correct installation position.
     (l) Install the protective cover (2) with the screw (1).
     (m) Apply Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) to the fasteners and all other connection elements.
     (n) Apply Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) onto the material applied to the fasteners and the connection elements (Ref. AMM TASK 51-75-13-916-002).
Subtask 25-52-51-860-052-A ** ON A/C NOT FOR ALL
C. Preparation for the Test
   (1) Remove the actuator safety lock from the forward and/or aft cargo-compartment door actuator(s) (Ref. AMM TASK 52-30-00-080-001).
   (2) Remove the WARNING NOTICE(S).
Subtask 25-52-51-865-060-A ** ON A/C NOT FOR ALL
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUSEMI AUTO CLS-FWD3MYE08
2000VUSEMI AUTO CLS-FWD2MYE06
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
Subtask 25-52-51-710-052-A ** ON A/C NOT FOR ALL
E. Do this Test
   (1) Do this test for the door sill latches (Ref. AMM TASK 25-52-00-710-004).
   (2) If necessary, adjust the drawbars of the door sill latches (Ref. AMM TASK 25-52-00-820-001).
5. Close-up
Subtask 25-52-51-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the ball strip and ball mats (Ref. AMM TASK 25-52-22-400-001).
   (3) Remove the WARNING NOTICE(S).
   (4) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 23:38:31 UTC