Adjustment of the Lavatory Doors
TASK 25-40-00-820-001-A
Adjustment of the Lavatory Doors
Self explanatory
2. Job Set-up Information
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-40-00-861-050-A 4. Procedure
Subtask 25-40-00-820-051-A
Subtask 25-40-00-862-051-A
[Rev.10 from 2021]
2026.03.31 23:34:44 UTC
Adjustment of the Lavatory Doors
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05BAE1) | Threadlocking Adhesive-- Medium strength - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 25-40-00-861-050-A 4. Procedure
Subtask 25-40-00-820-051-A
A. Adjustment of the Lavatory Single Blade Doors
(1) Open the lavatory door (6).
(2) Loosen the screws (4).
(3) Adjust the hinge (5) to get the dimension A clearance between the lavatory door (6) and the door frame.
(4) Tighten the screws (4).
(5) Close the lavatory door (6).
Subtask 25-40-00-820-050-A (1) Open the lavatory door (6).
(2) Loosen the screws (4).
(3) Adjust the hinge (5) to get the dimension A clearance between the lavatory door (6) and the door frame.
(4) Tighten the screws (4).
(5) Close the lavatory door (6).
B. Adjustment of the Lavatory Bi-folding Doors (Standard Option)
(1) Loosen the grubscrew (2).
(2) Adjust the nut (3) to get the dimension C clearance between the lavatory door (1) and the door frame.
(3) Tighten the grubscrew (2).
(4) Apply Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) to the grubscrew (2).
Subtask 25-40-00-710-050-A (1) Loosen the grubscrew (2).
(2) Adjust the nut (3) to get the dimension C clearance between the lavatory door (1) and the door frame.
(3) Tighten the grubscrew (2).
(4) Apply Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) to the grubscrew (2).
C. Operational Test of the Lavatory Doors
(1) Do the emergency opening test (from outside of the lavatory):
(b) Slide the knob (2) to the side until the indicator (4) shows VACANT.
(c) Open the single bladed door:
1 Pull the lavatory door (3) open.
(d) Open the Bi-folding door (standard option):
1 Push the lavatory door (3) open and/or release the door latches (5) and pull the lavatory door (3) fully open outwards.
(2) Do the Door Functional Test:
(a) Operate the lavatory door (3) and make sure that the door operation is correct.
(b) Close the lavatory door (3), lock the door latches (5) and do the step (a) again.
5. Close-up(1) Do the emergency opening test (from outside of the lavatory):
NOTE: For this test, the lavatory door must be locked from the inside.
(a) Lift up the spring loaded LAVATORY cover (1). (b) Slide the knob (2) to the side until the indicator (4) shows VACANT.
(c) Open the single bladed door:
1 Pull the lavatory door (3) open.
(d) Open the Bi-folding door (standard option):
1 Push the lavatory door (3) open and/or release the door latches (5) and pull the lavatory door (3) fully open outwards.
(2) Do the Door Functional Test:
(a) Operate the lavatory door (3) and make sure that the door operation is correct.
(b) Close the lavatory door (3), lock the door latches (5) and do the step (a) again.
Subtask 25-40-00-862-051-A
Adjustment of the Lavatory Doors