W DOC AIRBUS | AMM A320F

Operational Test of the Lavatory Door


TASK 25-40-00-710-001-A
Operational Test of the Lavatory Door


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 25-40-00-861-060-A
A. Energize the ground service network
(Ref. AMM TASK 24-41-00-861-002).
4. Procedure
Subtask 25-40-00-710-051-A
A. Emergency Opening Test of the Lavatory Doors (from the Outside of the Lavatory)
NOTE: For this test, the lavatory door must be locked from the inside.
   (1) Do the emergency opening procedure of the single bladed door:
     (a) Lift the spring loaded LAVATORY cover (1) and move the knob (2) to the side until the indicator (4) shows VACANT.
     (b) Turn the knob (or the optional lever) and pull the lavatory door (3) open.
   (2) Do the emergency opening procedure of the bi-folding door (standard option):
     (a) Lift up the spring loaded LAVATORY cover (1) and move the knob (2) to the side until the indicator (4) shows VACANT.
     (b) Push the lavatory door (3) open and/or release the door latches (5) and pull the lavatory door (3) fully open outwards.
Subtask 25-40-00-710-052-A
B. Operational Test of the Lavatory Doors
   (1) Operate the lavatory door (3) and make sure that the door operation is correct.
   (2) Close the lavatory door (3), lock the door latches (5).
5. Close-up
Subtask 25-40-00-862-061-A
A. De-energize the ground service network (Ref. AMM TASK 24-41-00-862-002).