Installation of an Emergency Equipment Stowage
TASK 25-27-15-400-001-A
Installation of an Emergency Equipment Stowage
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 25-27-15-860-050-A ** ON A/C NOT FOR ALL
Subtask 25-27-15-420-054-A ** ON A/C NOT FOR ALL
Subtask 25-27-15-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:32:54 UTC
Installation of an Emergency Equipment Stowage
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 25-27-15-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the equipment is removed from the emergency equipment stowage.
4. Procedure(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the equipment is removed from the emergency equipment stowage.
Subtask 25-27-15-420-054-A ** ON A/C NOT FOR ALL
A. Installation of the Emergency Equipment Stowage
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Carefully put the emergency equipment stowage (1) in position.
(4) Put the washers (3) in position and install the screws (2).
(5) Tighten the screws (2).
5. Close-up(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Carefully put the emergency equipment stowage (1) in position.
(4) Put the washers (3) in position and install the screws (2).
(5) Tighten the screws (2).
Subtask 25-27-15-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the emergency equipment in the emergency equipment stowage.
(3) Make sure that the emergency equipment stowage is complete.
Subtask 25-27-15-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the emergency equipment in the emergency equipment stowage.
(3) Make sure that the emergency equipment stowage is complete.
Emergency Equipment Stowage