W DOC AIRBUS | AMM A320F

Downloading of the Flight Management (FM) BITE Data


TASK 22-70-00-610-006-I
Downloading of the Flight Management (FM) BITE Data


ZONE: 210
FIN: 1CA1 ** ON A/C NOT FOR ALL
FIN: 1CA2 ** ON A/C NOT FOR ALL
1. Reason for the Job
To download the FM BITE data with the Portable Data Loader (PDL).
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
4
LOADER - DATA, PORTABLE
ALT45200001
4
PORTABLE DATA LOADER
F1420060
1
FM BITE - DOWNLOAD TOOL (FMGC 1)
F1420061
1
FM BITE DOWNLOAD TOOL
PS4087689-102
1
FM BITE DOWNLOAD TOOL
PS62004696-101
1
EXTENDED BITE DUMB - FMS
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 22-70-00-861-078-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 22-70-00-480-050-A ** ON A/C NOT FOR ALL
B. Installation of the PDL
   (1) On the overhead panel, on DATA LOADING panel 52VU:
     (a) Loosen the two middle quick-release fasteners of the access cover and remove it.
     (b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and to the DATA LOADER connector (2TD).
Subtask 22-70-00-480-050-B ** ON A/C NOT FOR ALL
B. Installation of the PDL
   (1) On the center pedestal, on DATA LOADING panel 117VU:
     (a) Loosen the two middle quick-release fasteners of the access cover and remove it.
     (b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and to the DATA LOADER connector (2147VC).
Subtask 22-70-00-480-050-E ** ON A/C NOT FOR ALL
B. Installation of the PDL
   (1) On the ALT45200001 PORTABLE DATA LOADER, make sure that the ON/OFF control switch is in the OFF position.
   (2) On the center pedestal, on DATA LOADING panel 117VU:
  • Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to the data loader connector on the front face of the Data Loading Selector Unit (DLSU) (103TD).
Subtask 22-70-00-865-181-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAUTO FLT/FMGC/110CA1B02
49VUAUTO FLT/MCDU/111CA1B01
** ON A/C NOT FOR ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUAUTO FLT/FMGC/110CA1H08
49VUAUTO FLT/MCDU/111CA1H07
** ON A/C NOT FOR ALL
121VUDLS&/DLRB/SPLY5TDJ15
** ON A/C NOT FOR ALL
121VUPDL/PWR/SPLY14TDK19
** ON A/C NOT FOR ALL
121VUAUTO FLT/FMGC/210CA2M17
121VUAUTO FLT/MCDU/211CA2N20
** ON A/C NOT FOR ALL
121VUDLSU &/DLRB/SPLY5TDJ15
** ON A/C NOT FOR ALL
121VUPDL/PWR/SPLY14TDJ45
121VUDLSU &/DLRB/SPLY5TDJ38
Subtask 22-70-00-860-129-A ** ON A/C NOT FOR ALL
D. Start the PDL.
   (1) Start the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
Subtask 22-70-00-860-129-D ** ON A/C NOT FOR ALL
D. Start the PDL.
   (1) Start the ALT45200001 PORTABLE DATA LOADER (refer to the PDL user guide).
Subtask 22-70-00-860-128-A ** ON A/C NOT FOR ALL
E. Make sure that the aircraft is in the ground configuration.
4. Procedure
Subtask 22-70-00-610-072-A ** ON A/C NOT FOR ALL
A. Downloading of the FM BITE Data (with the PDL and with ARINC 615)
NOTE: You cannot use the same floppy disk for the downloading of the two Flight Management and Guidance Computers (FMGC).
ACTION
RESULT
1.Open circuit breakers 10CA1 and 10CA2.

2.On the overhead panel, on the Data Loading Selector (DLS):
  • Set the ON/OFF control switch to ON.
On the DLS:
  • The "DB/N:
    PUSH NEXT/PREV"
    indication comes into view.
3.On the overhead panel, on the DLS:
  • Push the PREV or NEXT key until you get the indication of FMGC1 that you want to download.
On the DLS:
  • The "FMGC1
    NOT SELECTED"
    indication comes into view.
  • Push the SEL CTL key.
  • The "FMGC1
    SELECTED"
    indication comes into view.
4.Close circuit breaker 10CA1.
  • The power-up test of FMGC1 starts.
  • At the end of this test, you can hear the three click aural-warning.
5.Put the PS4087689-102 FM BITE DOWNLOAD TOOL or the PS62004696-101 EXTENDED BITE DUMB - FMS into the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

6.Open circuit breaker 10CA1.

7.On the DLS:
  • Push the SEL CTL key.
On the DLS:
  • The "FMGC1
    NOT SELECTED"
    indication comes into view.
  • Push the PREV or NEXT key until you get the indication of FMGC2 that you want to download.
  • The "FMGC2
    NOT SELECTED"
    indication comes into view.
  • Push the SEL CTL key.
  • The "FMGC2
    SELECTED"
    indication comes into view.
8.Close circuit breaker 10CA2.
  • The power-up test of FMGC2 starts.
  • At the end of this test, you can hear the three click aural-warning.
9.Put the PS4087689-102 FM BITE DOWNLOAD TOOL or the PS62004696-101 EXTENDED BITE DUMB - FMS into the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

10.On the DLS:
  • Set the ON/OFF control switch to OFF.

11.Open circuit breaker 10CA2 (wait for more than five seconds).

12.Close circuit breakers 10CA1 and 10CA2.

Subtask 22-70-00-610-072-C ** ON A/C NOT FOR ALL
A. Downloading of the FM BITE Data (with the PDL and with ARINC 615)
NOTE: You cannot use the same floppy disk for the downloading of the two Flight Management and Guidance Computers (FMGC).
ACTION
RESULT
1.Open circuit breakers 10CA1 and 10CA2.

2.On the overhead panel, on the Data Loading Selector (DLS):
  • Set the ON/OFF control switch to ON.
On the DLS:
  • The "DB/N:
    PUSH NEXT/PREV"
    indication comes into view.
3.On the overhead panel, on the DLS:
  • Push the PREV or NEXT key until you get the indication of FMGC1 that you want to download.
On the DLS:
  • The "FMGC1
    NOT SELECTED"
    indication comes into view.
  • Push the SEL CTL key.
  • The "FMGC1
    SELECTED"
    indication comes into view.
4.Close circuit breaker 10CA1.
  • The power-up test of FMGC1 starts.
  • At the end of this test, you can hear the three click aural-warning.
5.Put the F1420060 FM BITE - DOWNLOAD TOOL (FMGC 1) into the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

6.Open circuit breaker 10CA1.

7.On the DLS:
  • Push the SEL CTL key.
On the DLS:
  • The "FMGC1
    NOT SELECTED"
    indication comes into view.
  • Push the PREV or NEXT key until you get the indication of FMGC2 that you want to download.
  • The "FMGC2
    NOT SELECTED"
    indication comes into view.
  • Push the SEL CTL key.
  • The "FMGC2
    SELECTED"
    indication comes into view.
8.Close circuit breaker 10CA2.
  • The power-up test of FMGC2 starts.
  • At the end of this test, you can hear the three click aural-warning.
9.Put the F1420061 FM BITE DOWNLOAD TOOL into the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

10.On the DLS:
  • Set the ON/OFF control switch to OFF.

11.Open circuit breaker 10CA2 (wait for more than five seconds).

12.Close circuit breakers 10CA1 and 10CA2.

Subtask 22-70-00-610-072-E ** ON A/C NOT FOR ALL
A. Downloading of the FM BITE Data (with the PDL and with ARINC 615)
NOTE: You cannot use the same floppy disk for the downloading of the two Flight Management and Guidance Computers (FMGC).
ACTION
RESULT
1.Open circuit breakers 10CA1 and 10CA2.

2.On the center pedestal, on the DLSU:
  • Set the ON/OFF control switch to ON.
On the DLSU:
  • The "DB/N:XXXXXXXXXX
    PUSH NEXT"
    indication comes into view.
NOTE: The "XXXXXXXXXX" indication is the Part Number (P/N) of the database software installed in the DLSU.
Default value:'----------'.
3.On the center pedestal, on the DLSU:
  • Push the NEXT key.
The DLSU does self-tests.
4.Make sure that no error message comes into view.
On the DLSU:
  • The "STANDBY
    PUSH PREV/NEXT"
    indication comes into view.
5.On the center pedestal, on the DLSU:
  • Push the PREV or NEXT key until you get the "FMGC1(1CA1)" or "FMGC1_615A(1CA1)" indication.
NOTE: For FMGC1, you can download the FM data at low speed when you select the ”FMGC1(1CA1)” indication and at high speed when you select the ”FMGC1_615A(1CA1)” indication.
On the DLSU:
  • The "FMGC1(1CA1)
    NOT SELECTED", or
    "FMGC1_615A(1CA1)
    NOT SELECTED"
    indication comes into view.
6.On the center pedestal, on the DLSU:
  • Push the SEL key.
On the DLSU:
  • The "FMGC1(1CA1)
    SELECTED", or
    "FMGC1_615A(1CA1)
    SELECTED"
    indication comes into view.
NOTE: If the PDL is not connected:
  • The "CONNECT PDL
    PUSH SEL"
indication comes into view.
7.Close circuit breaker 10CA1.
  • The power-up test of FMGC1 starts.
  • At the end of this test, you can hear the three click aural-warning.
8.Put the F1420060 FM BITE - DOWNLOAD TOOL (FMGC 1) in the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

9.Open circuit breaker 10CA1.

10.On the DLSU:
  • Push the SEL key.
On the DLSU:
  • The "FMGC1(1CA1)
    NOT SELECTED"
    or
    "FMGC1_615A(1CA1)
    NOT SELECTED"
    indication comes into view.
11.On the center pedestal, on the DLSU:
  • Push the PREV or NEXT key until you get the "FMGC2(1CA2)" indication.
On the DLSU:
  • The "FMGC2(1CA2)
    NOT SELECTED"
    indication comes into view.
12.On the center pedestal, on the DLSU:
  • Push the SEL key.
On the DLSU:
  • The "FMGC2(1CA2)
    SELECTED"
    indication comes into view.
13.Close circuit breaker 10CA2.
  • The power-up test of FMGC2 starts.
  • At the end of this test, you can hear the three click aural-warning.
14.Put the F1420061 FM BITE DOWNLOAD TOOL in the disk drive or select the "FM BITE DOWNLOAD TOOL" option from the PDL menu (refer to the PDL user guide).

15.On the DLSU:
  • Set the ON/OFF control switch to OFF.

16.Open circuit breaker 10CA2 (wait for more than five seconds).

17.Close circuit breakers 10CA1 and 10CA2.

Subtask 22-70-00-860-135-A ** ON A/C NOT FOR ALL
B. Stop the PDL.
   (1) Stop the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
Subtask 22-70-00-860-135-D ** ON A/C NOT FOR ALL
B. Stop the PDL.
   (1) Stop the ALT45200001 PORTABLE DATA LOADER (refer to PDL user guide).
Subtask 22-70-00-080-059-A ** ON A/C NOT FOR ALL
C. Removal of the PDL
   (1) On the overhead panel, on DATA LOADING panel 52VU:
     (a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and from the DATA LOADER connector (2TD).
     (b) Install the access cover and tighten the two middle quick-release fasteners.
Subtask 22-70-00-080-059-B ** ON A/C NOT FOR ALL
C. Removal of the PDL
   (1) On the center pedestal, on DATA LOADING panel 117VU:
     (a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and from the DATA LOADER connector (2147VC).
     (b) Install the access cover and tighten the two middle quick-release fasteners.
Subtask 22-70-00-080-059-E ** ON A/C NOT FOR ALL
C. Removal of the PDL
   (1) On the center pedestal, on DATA LOADING panel 117VU:
  • Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER and from the data loader connector on the front face of the DLSU (103TD).
5. Close-up
Subtask 22-70-00-860-130-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
Subtask 22-70-00-862-086-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.03.31 23:10:44 UTC