Removal of the Pack Flow-Control Valve/ Pack Flow-Control Unit


TASK 21-51-51-000-001-A
Removal of the Pack Flow-Control Valve/ Pack Flow-Control Unit


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the pack 1 and pack 2 flow-control valve/ pack 1 and pack 2 flow-control unit.
FIN: 11HB ** ON A/C NOT FOR ALL
FIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
FIN: 8HB ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [11HB] (P1 FLOW CTL VALVE)
191BB, 191KB
FOR [23HB] (FLOW CTL UNIT-PACK 1)
191BB, 191KB
FOR [24HB] (FLOW CTL UNIT-PACK 2)
192FB, 192KB
FOR [8HB] (P2 FLOW CTL VALVE)
192FB, 192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-51-41-000-001-A
Removal of the Ozone Filter
TASK 21-51-51-200-001-A
Attachment Components (In-Service Wear Limits) - Flow Control Valve (Unit)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
F Pack Flow-Control Unit ** ON A/C NOT FOR ALL
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-51-51-861-050-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-51-51-865-071-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/FIRE/EXTIG/SQUIB/B2WFL39
121VUAPU/FIRE/EXTIG/SQUIB/A1WFL38
** ON A/C NOT FOR ALL
FOR FIN: 11HB (P1 FLOW CTL VALVE)
49VUAIR COND/FLOW/CTL &/IND11HBD07
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 8HB (P2 FLOW CTL VALVE)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNITPACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNITPACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-51-51-941-050-A
C. Safety Precautions
   (1) Put the WARNING NOTICE(S) in the cockpit to tell persons not to start the APU.
   (2) In the cockpit, on AIR COND panel 30VU, make sure that:
  • The APU BLEED pushbutton switch is released (the OFF legend is on).
  • The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (a) Put the WARNING NOTICE(S) in position to tell persons not to operate these switches.
   (3) On the HP ground connector, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-51-51-010-051-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Remove the access panels (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [11HB] (P1 FLOW CTL VALVE)
191KB and 191BB.
     (b) FOR [8HB] (P2 FLOW CTL VALVE)
192KB and 192FB.
Subtask 21-51-51-010-051-B ** ON A/C NOT FOR ALL
D. Get Access
   (1) Remove the access panels (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
191KB and 191BB.
     (b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
192KB and 192FB.
Subtask 21-51-51-010-057-B ** ON A/C NOT FOR ALL
E. Removal of the Ozone Filter for Access
   (1) Remove the ozone filter upstream of the flow control valve (Ref. AMM TASK 21-51-41-000-001).
Subtask 21-51-51-010-057-D ** ON A/C NOT FOR ALL
E. Removal of the Ozone Filter upstream of the Flow Control Unit for Access
   (1) Remove the ozone filter (Ref. AMM TASK 21-51-41-000-001).
4. Procedure
Subtask 21-51-51-020-057-D ** ON A/C NOT FOR ALL
A. Removal of the Pack Flow-Control Unit
F Pack Flow-Control Unit ** ON A/C NOT FOR ALL
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
   (1) Disconnect the electrical connectors (2), (3) and (4).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Remove the nut (23), the washer (24), the screw (18) and disconnect the bonding strap (25).
   (4) Remove the clamp (16).
   (5) Move the flange (13) and the sleeve (14) as far to the heat exchanger unit as they will go.
   (6) Hold the pack flow-control unit (17) and remove the nuts (22), the washers (21), if fitted the washers (26), the bolts (19) and the spacers (20).
   (7) Carefully remove the pack flow-control unit (17) from the aircraft.
   (8) Remove the flange (13) together with the sleeve (14) from the heat exchanger unit connecting-end (15).
   (9) Remove the flange (13) from the sleeve (14).
   (10) Remove and discard the seals (31) and (131) from the sleeve (14).
   (11) Put protective covers on the open ends of the pack flow-control unit (17) and the heat exchanger unit connecting-end (15).
Subtask 21-51-51-020-057-E ** ON A/C NOT FOR ALL
A. Removal of the Pack Flow-Control Valve
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
   (1) Disconnect the electrical connector (3).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Release the sense line quick-disconnects (2) and (4).
   (4) Release the sense line connection (5).
   (5) Put the PLUG-BLANKING in each disconnected line end.
   (6) Remove the nut (23), the washer (24), the screw (18) and disconnect the bonding strap (25).
   (7) Remove the clamp (16).
   (8) Move the flange (13) and the sleeve (14) as far to the heat exchanger unit as they will go.
   (9) Hold the pack flow-control valve (17) and remove the nuts (22), the washers (21), if fitted the washers (26), the bolts (19) and the spacers (20).
   (10) Carefully remove the pack flow-control valve (17) from the aircraft.
   (11) Remove the flange (13) together with the sleeve (14) from the heat exchanger unit connecting-end (15).
   (12) Remove the flange (13) from the sleeve (14).
   (13) Remove and discard the seals (31(131)) from the sleeve (14).
   (14) Put protective covers on the open ends of the pack flow-control valve (17) and the heat exchanger unit connecting-end (15).
Subtask 21-51-51-020-062-A
B. Removal of the Attachment Components
   (1) Remove the nut (3), washer (4), bolt (5), washer (7) (if installed) and bushing (6) from the brackets (11).
   (2) Remove the fitting (12) from the brackets (11).
   (3) Do the inspection of the components for in-service wear (Ref. AMM TASK 21-51-51-200-001).