General Visual Inspection of Aileron (EWIS)
TASK 05-25-90-200-001-A
General Visual Inspection of Aileron (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-590-01
GENERAL VISUAL INSPECTION OF AILERON (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-25-90-861-050-A Subtask 05-25-90-010-050-A
Subtask 05-25-90-210-050-A
Subtask 05-25-90-410-050-A
[Rev.10 from 2021]
2026.03.31 22:50:35 UTC
General Visual Inspection of Aileron (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-590-01
GENERAL VISUAL INSPECTION OF AILERON (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT) |
| No specific | 1 | FLASHLIGHT |
| No specific | 1 | MIRROR - INSPECTION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 590 | AILERON |
| 690 | AILERON |
| 590AB, 590BB, 690AB, 690BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 57-51-37-000-011-A | Removal of the Access Panels |
| TASK 57-51-37-400-011-A | Installation of the Access Panels |
Subtask 05-25-90-861-050-A Subtask 05-25-90-010-050-A
B. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT) in position.
(2) Remove access panels 590AB ( 690AB) and 590BB ( 690BB) (Ref. AMM TASK 57-51-37-000-011).
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT) in position.
(2) Remove access panels 590AB ( 690AB) and 590BB ( 690BB) (Ref. AMM TASK 57-51-37-000-011).
Subtask 05-25-90-210-050-A
A. Inspection
(1) If necessary, use the FLASHLIGHT and/or the MIRROR - INSPECTION.
(2) Do a general visual inspection of the aileron.
(3) Make sure that there are no signs of corrosion, cracks or damage.
(4) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
5. Close-up(1) If necessary, use the FLASHLIGHT and/or the MIRROR - INSPECTION.
(2) Do a general visual inspection of the aileron.
(3) Make sure that there are no signs of corrosion, cracks or damage.
(4) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
Subtask 05-25-90-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install access panels 590AB ( 690AB) and 590BB ( 690BB) (Ref. AMM TASK 57-51-37-400-011).
(3) Remove all the fixtures, tools, test and support equipment used during this procedure.
(4) Remove the access platform(s).
Subtask 05-25-90-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install access panels 590AB ( 690AB) and 590BB ( 690BB) (Ref. AMM TASK 57-51-37-400-011).
(3) Remove all the fixtures, tools, test and support equipment used during this procedure.
(4) Remove the access platform(s).
Access Panels of the Wing Aileron