General Visual Inspection of Outboard Fixed Trailing Edge Structure from RIB 9 to RIB 27 (EWIS)
TASK 05-25-70-200-005-A
General Visual Inspection of Outboard Fixed Trailing Edge Structure from RIB 9 to RIB 27 (EWIS)
Refer to the MPD TASK: ZL-575-01
GENERAL VISUAL INSPECTION OF OUTBOARD FIXED TRAILING EDGE STRUCTURE FROM RIB 9 TO RIB 27 (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-25-70-010-054-A
Subtask 05-25-70-210-054-A
Subtask 05-25-70-866-055-A
[Rev.10 from 2021]
2026.03.31 22:50:33 UTC
General Visual Inspection of Outboard Fixed Trailing Edge Structure from RIB 9 to RIB 27 (EWIS)
WARNING:
DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: ZL-575-01
GENERAL VISUAL INSPECTION OF OUTBOARD FIXED TRAILING EDGE STRUCTURE FROM RIB 9 TO RIB 27 (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 575 | AFT OUTBD SE OF WING AND TE FIXED STRUCT |
| 675 | AFT OUTBD SE OF WING AND TE FIXED STRUCT |
| 575AT, 575KB, 575LB, 575MB, 675AT, 675KB, 675LB, 675MB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-50-00-866-008-A | Extension of the Flaps on the Ground |
| TASK 27-50-00-866-008-A-01 | Extension of the Flaps/Slats on the Ground |
| TASK 27-50-00-866-009-A | Retraction of the Flaps on the Ground |
| TASK 27-50-00-866-009-A-01 | Retraction of the Flaps/Slats on the Ground |
| TASK 27-60-00-866-002-A | Extension-Retraction of the Spoilers for Maintenance |
| TASK 57-51-37-000-005-A | Removal of the Access Panels 575KB(675KB), 575LB(675LB), 575MB(675MB) |
| TASK 57-51-37-000-007-A | Removal of the Access Panel |
| TASK 57-51-37-400-005-A | Installation of the Access Panels 575KB(675KB), 575LB(675LB), 575MB(675MB) |
| TASK 57-51-37-400-007-A | Installation of the Access Panel |
Subtask 05-25-70-010-054-A
A. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
(2) Remove the access panels
575AT and 675AT (Ref. AMM TASK 57-51-37-000-007),
575KB, 575LB, 575MB, 675KB, 675LB and 675MB (Ref. AMM TASK 57-51-37-000-005).
Subtask 05-25-70-866-054-A (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
(2) Remove the access panels
575AT and 675AT (Ref. AMM TASK 57-51-37-000-007),
575KB, 575LB, 575MB, 675KB, 675LB and 675MB (Ref. AMM TASK 57-51-37-000-005).
B. Aircraft Maintenance Configuration
(1) Extend the spoilers (Ref. AMM TASK 27-60-00-866-002).
(2) Fully extend the flaps (Ref. AMM TASK 27-50-00-866-008).
4. Procedure(1) Extend the spoilers (Ref. AMM TASK 27-60-00-866-002).
(2) Fully extend the flaps (Ref. AMM TASK 27-50-00-866-008).
Subtask 05-25-70-210-054-A
A. Inspection
(1) Do a general visual inspection of the outboard fixed-trailing-edge structure from RIB9 to RIB27 (zones 575 and 675).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the outboard fixed-trailing-edge structure from RIB9 to RIB27 (zones 575 and 675).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-25-70-866-055-A
A. Aircraft Maintenance Configuration
(1) Fully retract the flaps (Ref. AMM TASK 27-50-00-866-009).
(2) Fully retract the spoilers (Ref. AMM TASK 27-60-00-866-002).
Subtask 05-25-70-410-054-A (1) Fully retract the flaps (Ref. AMM TASK 27-50-00-866-009).
(2) Fully retract the spoilers (Ref. AMM TASK 27-60-00-866-002).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels
575AT and 675AT (Ref. AMM TASK 57-51-37-400-007),
575KB, 575LB, 575MB, 675KB, 675LB and 675MB (Ref. AMM TASK 57-51-37-400-005).
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels
575AT and 675AT (Ref. AMM TASK 57-51-37-400-007),
575KB, 575LB, 575MB, 675KB, 675LB and 675MB (Ref. AMM TASK 57-51-37-400-005).
(3) Remove the access platform(s).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
Outboard Fixed-Trailing-Edge Structure from RIB9 to RIB27