W DOC AIRBUS | AMM A320F

General Visual Inspection of False Spar Box (EWIS)


TASK 05-25-70-200-004-A
General Visual Inspection of False Spar Box (EWIS)


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 574
ZONE: 674
1. Reason for the Job
Refer to the MPD TASK: ZL-574-01
GENERAL VISUAL INSPECTION OF FALSE SPAR BOX (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
WARNING NOTICE(S)
98L12003001000
AR
HARNESS,SAFETY
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
574
FALSE SPAR BOX
674
FALSE SPAR BOX
573CB, 573DB, 573EB, 574AB, 574BB, 673CB, 673DB, 673EB, 674AB, 674BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 57-51-37-000-002-A
Removal of the Access Panels 571AB(671AB), 573AB(673AB), 573BB(673BB), 573CB(673CB), 573EB(673EB)
TASK 57-51-37-000-008-A
Removal of the Access Door
TASK 57-51-37-000-009-A
Removal of the Access Door
TASK 57-51-37-400-002-A
Installation of the Access Panels 571AB(671AB), 573AB(673AB), 573BB(673BB), 573CB(673CB), 573EB(673EB)
TASK 57-51-37-400-008-A
Installation of the Access Door
TASK 57-51-37-400-009-A
Installation of the Access Door
SRM 511100
SRM 512200
3. Job Set-up
Subtask 05-25-70-941-055-A
A. Safety Precautions
WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
   (1) Put on and attach the HARNESS, SAFETY before you start work in the work area.
   (2) Put the WARNING NOTICE(S) in the cockpit to tell persons not to operate the flight controls.
Subtask 05-25-70-010-053-A 4. Procedure
Subtask 05-25-70-210-053-A
A. Inspection
   (1) Do a general visual inspection of the false spar box for damage or discontinuities.
   (2) Make sure that there is no:
     (a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual SRM 512200 for the corrosion types, inspection, removal and subsequent corrosion protection.
     (b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual SRM 511100 for the damage types, classification and corrective action.
5. Close-up
Subtask 05-25-70-410-053-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels:
Subtask 05-25-70-942-055-A
B. Put the Aircraft Back to its Initial Configuration
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the access platform(s).
   (3) Remove all the fixtures, tools, test and support equipment used during this procedure.
[Rev.10 from 2021] 2026.03.31 22:50:31 UTC