General Visual Inspection of Vertical Stabilizer Spar Box (EWIS)
TASK 05-23-20-200-003-A
General Visual Inspection of Vertical Stabilizer Spar Box (EWIS)
Refer to the MPD TASK: ZL-323-01
GENERAL VISUAL INSPECTION OF VERTICAL STABILIZER SPAR BOX (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 05-23-20-010-052-A
Subtask 05-23-20-210-052-A
Subtask 05-23-20-410-052-A
[Rev.10 from 2021]
2026.03.31 22:49:34 UTC
General Visual Inspection of Vertical Stabilizer Spar Box (EWIS)
ZONE: 323
1. Reason for the JobRefer to the MPD TASK: ZL-323-01
GENERAL VISUAL INSPECTION OF VERTICAL STABILIZER SPAR BOX (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 6M (20 FT) |
| No specific | 1 | FLASHLIGHT |
| No specific | 1 | MIRROR - INSPECTION, FLEXIBLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RAB9) | Adhesive Film Tape-- Aluminium Foil - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 323 | VERTICAL STABILIZER SPAR BOX |
| 321AL, 322BL, 323AL, 323AR, 325AL, 325AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 53-45-11-000-001-A | Removal of the Dorsal Fin |
| TASK 53-45-11-400-001-A | Installation of the Dorsal Fin |
| TASK 53-55-11-000-001-A | Removal of the Vertical Stabilizer Fairings |
| TASK 53-55-11-400-001-A | Installation of the Vertical Stabilizer Fairings |
| TASK 53-55-12-000-001-A | Removal of the Rudder Fairings |
| TASK 53-55-12-400-001-A | Installation of the Rudder Fairings |
| TASK 55-32-11-000-001-A | Removal of the Vertical Stabilizer Leading-Edge |
| TASK 55-32-11-400-001-A | Installation of the Vertical Stabilizer Leading-Edge |
Subtask 05-23-20-010-052-A
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 320.
(2) Remove the access panels:
4. Procedure(1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 320.
(2) Remove the access panels:
- 321AL
(Ref. AMM TASK 53-45-11-000-001) - 323AL and 323AR
(Ref. AMM TASK 53-55-11-000-001) - 325AL and 325AR
(Ref. AMM TASK 53-55-12-000-001) - 322BL
(Ref. AMM TASK 55-32-11-000-001).
Subtask 05-23-20-210-052-A
A. Inspection
(1) Do a general visual inspection of the spar box of the vertical stabilizer (zone 323) with a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the spar box of the vertical stabilizer (zone 323) with a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-23-20-410-052-A
A. Close Access
(1) Cut and install the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) over the hole covers.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the access panels:
(1) Cut and install the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) over the hole covers.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the access panels:
- 322BL
(Ref. AMM TASK 55-32-11-400-001) - 325AL and 325AR
(Ref. AMM TASK 53-55-12-400-001) - 323AL and 323AR
(Ref. AMM TASK 53-55-11-400-001) - 321AL
(Ref. AMM TASK 53-45-11-400-001).
Vertical-Stabilizer Spar-Box Area