General Visual Inspection of Vertical Stabilizer Spar Box (EWIS)


TASK 05-23-20-200-003-A
General Visual Inspection of Vertical Stabilizer Spar Box (EWIS)


ZONE: 323
1. Reason for the Job
Refer to the MPD TASK: ZL-323-01
GENERAL VISUAL INSPECTION OF VERTICAL STABILIZER SPAR BOX (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 6M (20 FT)
No specific
1
FLASHLIGHT
No specific
1
MIRROR - INSPECTION, FLEXIBLE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05RAB9)
Adhesive Film Tape-- Aluminium Foil -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
323
VERTICAL STABILIZER SPAR BOX
321AL, 322BL, 323AL, 323AR, 325AL, 325AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 53-45-11-000-001-A
Removal of the Dorsal Fin
TASK 53-45-11-400-001-A
Installation of the Dorsal Fin
TASK 53-55-11-000-001-A
Removal of the Vertical Stabilizer Fairings
TASK 53-55-11-400-001-A
Installation of the Vertical Stabilizer Fairings
TASK 53-55-12-000-001-A
Removal of the Rudder Fairings
TASK 53-55-12-400-001-A
Installation of the Rudder Fairings
TASK 55-32-11-000-001-A
Removal of the Vertical Stabilizer Leading-Edge
TASK 55-32-11-400-001-A
Installation of the Vertical Stabilizer Leading-Edge
3. Job Set-up
Subtask 05-23-20-010-052-A
A. Get Access
   (1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 320.
   (2) Remove the access panels:
   (3) Remove the peelable hole covers.
4. Procedure
Subtask 05-23-20-210-052-A
A. Inspection
   (1) Do a general visual inspection of the spar box of the vertical stabilizer (zone 323) with a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
Subtask 05-23-20-410-052-A
A. Close Access
   (1) Cut and install the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) over the hole covers.
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Install the access panels:
   (4) Remove the access platform(s).