Ground Run for Additional Particle Collection [CFMB]
TASK 79-00-00-281-006-A
Ground Run for Additional Particle Collection
1. Reason for the Job
This task is to continue to troubleshoot findings from the Electrical Master Chip Detector (EMCD) and to determine which sump is the origin of the particles found.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 79-00-00-941-080-A ** ON A/C NOT FOR ALL
Subtask 79-00-00-281-057-A ** ON A/C NOT FOR ALL
Subtask 79-00-00-410-073-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:38:59 UTC
Ground Run for Additional Particle Collection
1. Reason for the Job
This task is to continue to troubleshoot findings from the Electrical Master Chip Detector (EMCD) and to determine which sump is the origin of the particles found.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 79-00-00-080-001-A | Removal of the Magnetic Bar from the Scavenge Screen Plugs (IF OPTIONALLY INSTALLED) |
| TASK 79-00-00-281-002-A | Check of the Electrical Master Chip Detector (EMCD) for Particles |
| TASK 79-00-00-281-003-A | Check of FWD Sump, AFT Sump, AGB and TGB Scavenge Screens |
| TASK 79-00-00-281-004-A | Preparation of the Particles from the Electrical Master Chip Detector (EMCD) |
| TASK 79-00-00-281-005-A | Analyze Particles |
| TASK 79-00-00-480-001-A | Installation of a Magnetic Bar in the Scavenge Screen Plugs (OPTIONAL) |
Subtask 79-00-00-941-080-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 79-00-00-010-085-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Open the fan cowls doors: (Ref. AMM TASK 71-13-00-010-040)
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
Subtask 79-00-00-281-057-A ** ON A/C NOT FOR ALL
A. Installation of the Magnetic Bars
(a) Install the magnetic bars in the scavenge unit scavenge screen plugs (Ref. AMM TASK 79-00-00-480-001) and (Ref. AMM TASK 79-00-00-080-001).
5. Close-upCAUTION:
THE INSTALLATION OF THE MAGNETIC BARS MUST:
(1) If magnetic bars are available: - BE LIMITED TO ONE OF TWO ENGINES
- STAY TEMPORARY. REVENUE SERVICE FLIGHTS WITH THE MAGNETIC BARS INSTALLED MUST BE LIMITED TO 5 CYCLES OR 25 HOURS AND THEN THE MAGNETIC BARS MUST BE REMOVED.
(a) Install the magnetic bars in the scavenge unit scavenge screen plugs (Ref. AMM TASK 79-00-00-480-001) and (Ref. AMM TASK 79-00-00-080-001).
NOTE: This is an optional tool dedicated for troubleshooting only.
(2) Operate the engine at a minimum of 70 percent N1 for 10 minutes. CAUTION:
CONTINUED ENGINE OPERATION WITH A BEARING SPALLING CAN CAUSE EXTENSIVE DAMAGE TO THE ENGINE.
(a) Stop the engine. - Check of the Electrical Master Chip Detector (EMCD) for Particles (Ref. AMM TASK 79-00-00-281-002)
- Check of FWD Sump, AFT Sump, AGB, and TGB scavenge screens (Ref. AMM TASK 79-00-00-281-003)
- Preparation of the Particles from the Electrical Master Chip Detector (EMCD) (Ref. AMM TASK 79-00-00-281-004)
- Analyse Particles (Ref. AMM TASK 79-00-00-281-005).
Subtask 79-00-00-410-073-A ** ON A/C NOT FOR ALL
Installation of the Magnetic Bars in the Scavenge Screens