W DOC AIRBUS | AMM A320F

Installation of the Right C-Duct Electrical Harness [IAE]


TASK 78-32-77-400-010-A
Installation of the Right C-Duct Electrical Harness


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
This task supplies the data to install the right C-Duct electrical harness.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 15 and 12 lbf.in (0.17 and 0.14 m.daN ) T
No specific
Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 70-23-11-911-013-A
General Torque Tightening Techniques
TASK 70-23-15-912-010-A
Connection of Electrical Connectors
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 78-30-00-040-012-A
Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance
TASK 78-30-00-440-012-A
Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance
TASK 78-31-00-710-041-A
Operational Test of the Thrust Reverser System with the CFDS
TASK 78-31-00-710-041-A-02
Operational test of the Thrust Reverser without the CFDS and Engine Running
3. Job Set-up
Subtask 78-32-77-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
Subtask 78-32-77-010-051-A ** ON A/C NOT FOR ALL
B. Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-010)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 78-32-77-040-051-A ** ON A/C NOT FOR ALL
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
4. Procedure
Subtask 78-32-77-420-050-A ** ON A/C NOT FOR ALL
A. Install the 900J receptacle (Ref. AMM TASK 70-23-15-912-010).
F Right C-Duct Electrical Harness ** ON A/C NOT FOR ALL
   (1) Remove the caps from the three electrical connectors and their receptacles.
   (2) Install the 900J receptacle (10) on the bracket (9) with the screws (11), the washers (8), and the nuts (7) (Detail G).
   (3) TORQUE the nuts to between 15 and 12 lbf.in (0.17 and 0.14 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
Subtask 78-32-77-420-052-A ** ON A/C NOT FOR ALL
B. Connect the electrical connectors (Ref. AMM TASK 70-23-15-912-010).
F Right C-Duct Electrical Harness ** ON A/C NOT FOR ALL
   (1) Connect the 900P connector (6) to the 900J receptacle (10) (Detail G). Tighten the connector by hand plus one-eighth turn.
   (2) Connect the 902P connector (5) to the receptacle on the non-locking actuator (4) (Detail F). Tighten the connector by hand plus one-eighth turn.
   (3) Connect the 904P connector (3) to the receptacle of the locking actuator (2) (Detail E). Tighten the connector by hand plus one-eighth turn.
Subtask 78-32-77-420-051-A ** ON A/C NOT FOR ALL
C. Install the right C-Duct electrical harness
F Right C-Duct Electrical Harness ** ON A/C NOT FOR ALL
   (1) Attach the right C-duct electrical harness (1) and the lower hydraulic tube (18) to the brackets on both sides of the non-locking actuator with the clamps (16), the spacers (15), the screws (17), the washers (14) and the nuts (19). (Detail C). Tighten the nuts by hand only at this step.
   (2) At seven positions, install the screws (13), the washers (14), the nuts (19) and the clamps (12) which attach the right C-duct electrical harness to the C-duct (Detail D). Tighten the nuts by hand only at this step.
   (3) At two positions, install the clamps (21), the washers (22), the screws (23) and the nuts (27) which attach the right C-duct electrical harness to the bracket (Detail H).
   (4) TORQUE all of the nuts (19) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) At two positions, install the spacers (20), the screws (13), the washers (14) and the clamps (12) which attach the right C-duct electrical harness to the brackets (Detail B).
   (6) TORQUE the screws (13) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
Subtask 78-32-77-420-053-A ** ON A/C NOT FOR ALL
D. Assemble the electrical harness to the lower hydraulic tube
(Detail J)
   (1) Rework of thrust reverser wiring harness installation

SBN 78-0021

   (2) Attach the right C-duct electrical harness (3) to the lower hydraulic tube (28), near the non-locking actuator, with the clamps (21), the screw (23), the washer (22) and the nut (27).
5. Close-up
Subtask 78-32-77-440-050-A ** ON A/C NOT FOR ALL
A. Activate the thrust reverser HCU (Ref. AMM TASK 78-30-00-440-012).
Subtask 78-32-77-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
Subtask 78-32-77-710-050-A ** ON A/C NOT FOR ALL
C. Do an operational test of the Thrust Reverser system (Ref. AMM TASK 78-31-00-710-041) and make sure that on CFDS no fault is show related to the thrust reverser system.
[Rev.10 from 2021] 2026.04.01 03:29:39 UTC