Visual Inspection of the Variable Bleed Valve (VBV) System [CFMB]
TASK 75-31-00-210-002-A
Visual Inspection of the Variable Bleed Valve (VBV) System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 75-31-00-941-057-A ** ON A/C NOT FOR ALL
Subtask 75-31-00-010-068-A ** ON A/C NOT FOR ALL Subtask 75-31-00-210-051-A ** ON A/C NOT FOR ALL
Subtask 75-31-00-410-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:10:28 UTC
Visual Inspection of the Variable Bleed Valve (VBV) System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 72-23-00-000-027-A | Removal of the Fan Duct Panels |
| TASK 72-23-00-400-027-A | Installation of the Fan Duct Panels |
| TASK 75-31-30-200-002-A | Visual Inspection of the VBV Main Flexible Shaft and the VBV Inter-connecting Flexible Shafts |
| TASK 75-31-50-000-002-A | Removal of the Bleed Valve and Master Ballscrew Actuator Assembly |
| TASK 75-31-50-400-002-A | Installation of the Bleed Valve and Master Ballscrew Actuator Assembly |
| TASK 75-31-60-000-002-A | Removal of the Bleed Valve and Ballscrew Actuator Assembly |
| TASK 75-31-60-400-002-A | Installation of the Bleed Valve and Ballscrew Actuator Assembly |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 75-31-00-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 75-31-00-010-055-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 75-31-00-040-052-A ** ON A/C NOT FOR ALL Subtask 75-31-00-010-058-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-31-00-010-068-A ** ON A/C NOT FOR ALL Subtask 75-31-00-210-051-A ** ON A/C NOT FOR ALL
B. Visually Inspect the following:
Subtask 75-31-00-410-068-A ** ON A/C NOT FOR ALL 5. Close-up| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.The bleed valve doors for: | | |
| A.Distortion | Not serviceable | Replace the bleed valve (Ref. AMM TASK 75-31-60-000-002) and (Ref. AMM TASK 75-31-60-400-002). |
| B.Damaged seal | Serviceable, if the engine parameters are within limits | Replace the bleed valve (Ref. AMM TASK 75-31-60-000-002) and (Ref. AMM TASK 75-31-60-400-002). |
| 2.The master VBV door for: | | |
| A.Distortion | Not serviceable | Replace the master VBV door (Ref. AMM TASK 75-31-50-000-002) and (Ref. AMM TASK 75-31-50-400-002). |
| B.Damaged seal | Serviceable, if the engine parameters are within limits | Replace the master VBV door (Ref. AMM TASK 75-31-50-000-002) and (Ref. AMM TASK 75-31-50-400-002). |
| 3.The flexible shafts Do a visual inspection (Ref. AMM TASK 75-31-30-200-002). | | |
Subtask 75-31-00-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-31-00-440-052-A ** ON A/C NOT FOR ALL Subtask 75-31-00-410-058-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Visual Inspection of the VBV System