Removal of the Bleed Valve and Master Ballscrew Actuator Assembly [CFMB]
TASK 75-31-50-000-002-A
Removal of the Bleed Valve and Master Ballscrew Actuator Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 75-31-50-941-053-A ** ON A/C NOT FOR ALL
Subtask 75-31-50-010-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:10:44 UTC
Removal of the Bleed Valve and Master Ballscrew Actuator Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | AR | WRENCH 5/64 IN - HEXAGONAL |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 72-23-00-000-027-A | Removal of the Fan Duct Panels |
| TASK 75-31-20-820-001-A | Set the Variable Bleed Valve Assembly to the Closed position |
| TASK 75-31-30-000-001-A | Removal of a VBV Inter-connecting Flexible Shaft (Typical). |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
Subtask 75-31-50-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 75-31-50-010-053-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 75-31-50-040-050-A ** ON A/C NOT FOR ALL Subtask 75-31-50-010-054-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-31-50-010-057-A ** ON A/C NOT FOR ALL
A. Remove fan duct panels, from each side of the fan frame strut at 9 o'clock (aft looking forward) (Ref. AMM TASK 72-23-00-000-027).
Subtask 75-31-50-020-051-A ** ON A/C NOT FOR ALL B. Removal of the Bleed Valve and Master Ballscrew Actuator.
(1) Set the Variable Bleed Valve (VBV) assembly to the CLOSED position (Ref. AMM TASK 75-31-20-820-001).
(2) Remove the 2 flexible shafts (20) (Ref. AMM TASK 75-31-30-000-001).
(3) Disconnect the feedback rod (80) from the bleed valve and master ballscrew actuator (30) as follows :
(a) Remove and discard cotter pin (120).
(b) Remove castellated nut (130).
(c) Remove washer (140).
(d) Remove bolt (100) and disengage clevis (110) of feedback rod (80) from VBV feedback reverser arm (60).
(4) Remove the 2 bracket screws (70) securing bleed valve and master ballscrew actuator (30) to fan frame.
(5) Loosen the 4 main captive bolts (40 and 50) (upper horizontal and lower vertical) attaching bleed valve and master ballscrew actuator (30) to fan frame.
(6) Remove screw (170). Loosen bolt (150). Rotate cover (160) to get access to the hex end of main flexible shaft (10).
(7) Disengage the hexagonal end of the main flex shaft.
(8) Remove bleed valve and master ballscrew actuator (30).
(1) Set the Variable Bleed Valve (VBV) assembly to the CLOSED position (Ref. AMM TASK 75-31-20-820-001).
(2) Remove the 2 flexible shafts (20) (Ref. AMM TASK 75-31-30-000-001).
(3) Disconnect the feedback rod (80) from the bleed valve and master ballscrew actuator (30) as follows :
(a) Remove and discard cotter pin (120).
(b) Remove castellated nut (130).
(c) Remove washer (140).
(d) Remove bolt (100) and disengage clevis (110) of feedback rod (80) from VBV feedback reverser arm (60).
(4) Remove the 2 bracket screws (70) securing bleed valve and master ballscrew actuator (30) to fan frame.
(5) Loosen the 4 main captive bolts (40 and 50) (upper horizontal and lower vertical) attaching bleed valve and master ballscrew actuator (30) to fan frame.
(6) Remove screw (170). Loosen bolt (150). Rotate cover (160) to get access to the hex end of main flexible shaft (10).
(7) Disengage the hexagonal end of the main flex shaft.
CAUTION:
TAKE CARE NOT TO DAMAGE THE PROTECTIVE BOOT ON THE STOP MECHANISM.
(a) Disengage the hexagonal end of the main flex shaft (10), while you push it back in the VBV stop mechanism (90) with a WRENCH 5/64 IN - HEXAGONAL across flats. (8) Remove bleed valve and master ballscrew actuator (30).
Bleed Valve and Master Ballscrew Actuator Assembly