Installation of the High Pressure Turbine/Low Pressure Turbine (HPT/LPT) Valve Actuator [IAE]
TASK 75-24-52-400-010-A
Installation of the High Pressure Turbine/Low Pressure Turbine (HPT/LPT) Valve Actuator
This task gives the procedure for the installation of the HPT/LPT valve actuator.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 75-24-52-860-050-A ** ON A/C NOT FOR ALL
Subtask 75-24-52-420-052-A ** ON A/C NOT FOR ALL
Subtask 75-24-52-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 13:08:45 UTC
Installation of the High Pressure Turbine/Low Pressure Turbine (HPT/LPT) Valve Actuator
FIN: 4027KS ** ON A/C NOT FOR ALL
1. Reason for the JobThis task gives the procedure for the installation of the HPT/LPT valve actuator.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-126) | lockwire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 12 | PIN | AIPC 75-24-52-80-010 |
| 16 | PIN | AIPC 75-24-52-80-010 |
| 2 | PACKING | AIPC 75-24-52-80-090 |
| 5 | PACKING | AIPC 75-24-52-80-100 |
| 23 | PACKING | AIPC 75-24-52-80-140 |
| 26 | PACKING | AIPC 75-24-52-80-160 |
| 29 | PACKING | AIPC 75-24-52-80-180 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 70-23-13-911-010-A | Procedures for the Installation of Preformed Packings |
| TASK 70-23-15-912-010-A | Connection of Electrical Connectors |
| TASK 70-40-11-911-014-A | Locking Devices General Information |
| TASK 71-00-00-710-012-B | Test No.3 : Idle Leak Check |
| TASK 71-00-00-710-045-A | Test No.1 : Dry Motor Leak Check |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 73-22-00-710-040-A | Operational Test of the FADEC SYSTEM on the Ground |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Subtask 75-24-52-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 75-24-52-010-053-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the right thrust reverser half is open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
Subtask 75-24-52-040-051-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the right thrust reverser half is open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
4. ProcedureSubtask 75-24-52-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Fittings
(2) Install the drain fitting (27) in the actuator drain hole.
(3) TORQUE the drain fitting (27) to between 150 and 130 lbf.in (1.70 and 1.47 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Install the new AIPC 75-24-52-80-160 PACKING (26) on the return fitting (24) (Ref. AMM TASK 70-23-13-911-010).
(5) Install the return fitting (24) in the actuator pressure hole.
(6) TORQUE the return fitting (24) to between 200 and 180 lbf.in (2.26 and 2.03 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(7) Install the new AIPC 75-24-52-80-140 PACKING (23) on the pressure fitting (25) (Ref. AMM TASK 70-23-13-911-010).
(8) Install the pressure fitting (25) in the actuator return hole.
(9) TORQUE the pressure fitting (25) to between 230 and 210 lbf.in (2.60 and 2.37 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(10) Safety the return fitting (24) to the pressure fitting (25) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
(11) Safety the drain fitting (27) to the HPT/LPT valve actuator (1) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
(12) Install the insulation blanket on the HPT/LPT valve actuator
(b) Safety the insulation blanket (20) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
Subtask 75-24-52-420-051-A ** ON A/C NOT FOR ALL NOTE: Do the following steps if the fittings do not exist on the HPT/LPT valve actuator
(1) Install the new AIPC 75-24-52-80-180 PACKING (29) on the drain fitting (27) (Ref. AMM TASK 70-23-13-911-010). (2) Install the drain fitting (27) in the actuator drain hole.
(3) TORQUE the drain fitting (27) to between 150 and 130 lbf.in (1.70 and 1.47 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Install the new AIPC 75-24-52-80-160 PACKING (26) on the return fitting (24) (Ref. AMM TASK 70-23-13-911-010).
(5) Install the return fitting (24) in the actuator pressure hole.
(6) TORQUE the return fitting (24) to between 200 and 180 lbf.in (2.26 and 2.03 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (7) Install the new AIPC 75-24-52-80-140 PACKING (23) on the pressure fitting (25) (Ref. AMM TASK 70-23-13-911-010).
(8) Install the pressure fitting (25) in the actuator return hole.
(9) TORQUE the pressure fitting (25) to between 230 and 210 lbf.in (2.60 and 2.37 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (10) Safety the return fitting (24) to the pressure fitting (25) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
(11) Safety the drain fitting (27) to the HPT/LPT valve actuator (1) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
(12) Install the insulation blanket on the HPT/LPT valve actuator
NOTE: Do the following steps if the insulation blanket does not exist on the HPT/LPT valve actuator.
(a) Install the insulation blanket (20) on the HPT/LPT valve actuator (1). (b) Safety the insulation blanket (20) with lockwire (Material No.V02-126) (Ref. AMM TASK 70-40-11-911-014).
B. Installation of the HPT/LPT Valve Actuator
(1) Carefully install the HPT/LPT valve actuator (1) on the actuator front bracket (21) and the actuator rear bracket (33).
(2) Loosely install the two bolts (28) and the two nuts (22) to fix the position of the HPT/LPT valve actuator.
(3) TORQUE the bolts (28) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) TORQUE the nuts (22) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
Subtask 75-24-52-420-054-A ** ON A/C NOT FOR ALL (1) Carefully install the HPT/LPT valve actuator (1) on the actuator front bracket (21) and the actuator rear bracket (33).
(2) Loosely install the two bolts (28) and the two nuts (22) to fix the position of the HPT/LPT valve actuator.
(3) TORQUE the bolts (28) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) TORQUE the nuts (22) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). C. Installation of the Bush in the HPT/LPT Valve Actuator
(1) Decrease the temperature of the bush (18) for 15 minutes with dry ice.
(2) Put the stator rod assembly (15) between the holes of the HPT/LPT valve actuator (1).
(3) Install the bush (18) in the HPT/LPT valve actuator clevis.
Subtask 75-24-52-420-055-A ** ON A/C NOT FOR ALL (1) Decrease the temperature of the bush (18) for 15 minutes with dry ice.
(2) Put the stator rod assembly (15) between the holes of the HPT/LPT valve actuator (1).
(3) Install the bush (18) in the HPT/LPT valve actuator clevis.
NOTE: If the installation of the bushes is not easy, increase the temperature of the HPT/LPT valve actuator clevis to 140 deg.F (60 deg.C) with a drier.
(4) Make sure that each bush touches the bearing ball. D. Connection of the Stator Rod Assembly
(1) Align the holes of the HPT/LPT valve actuator (1) and the stator rod assembly (15).
(2) Install the bolt (7) and the nut (17).
(3) TORQUE the nut (17) to between 42.5 and 32.5 lbf.in (0.48 and 0.37 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Safety the nut (17) with a new AIPC 75-24-52-80-010 PIN (16) (Ref. AMM TASK 70-40-11-911-014).
Subtask 75-24-52-420-058-A ** ON A/C NOT FOR ALL (1) Align the holes of the HPT/LPT valve actuator (1) and the stator rod assembly (15).
(2) Install the bolt (7) and the nut (17).
(3) TORQUE the nut (17) to between 42.5 and 32.5 lbf.in (0.48 and 0.37 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Safety the nut (17) with a new AIPC 75-24-52-80-010 PIN (16) (Ref. AMM TASK 70-40-11-911-014).
E. Connection of the Actuator Rod Assembly
(2) TORQUE the nut (13) to between 30 and 22.5 lbf.in (0.34 and 0.25 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(3) Safety the nut with a new AIPC 75-24-52-80-010 PIN (12) (Ref. AMM TASK 70-40-11-911-014).
Subtask 75-24-52-420-060-A ** ON A/C NOT FOR ALL NOTE: Before the actuator rod assembly (11) is connected:
It is very important that the bolt (10) and the nut (13) are assembled in the correct positions to prevent damage to the HPT/LPT valve actuator (1).
(1) Align the holes of the rod end of the HPT/LPT valve actuator and the actuator rod assembly (11). Install the two bushes (9) and (14), the bolt (10) and the nut (13). It is very important that the bolt (10) and the nut (13) are assembled in the correct positions to prevent damage to the HPT/LPT valve actuator (1).
(2) TORQUE the nut (13) to between 30 and 22.5 lbf.in (0.34 and 0.25 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (3) Safety the nut with a new AIPC 75-24-52-80-010 PIN (12) (Ref. AMM TASK 70-40-11-911-014).
F. Connection of the Tubes and Harness
(1) Connect the fuel tube.
(a) Install the new AIPC 75-24-52-80-100 PACKING (5) on the return fitting (24).
(b) Connect the fuel tube (4) to the HPT/LPT valve actuator (1).
(c) TORQUE the union nut to between 360 and 330 lbf.in (4.07 and 3.73 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(2) Connect the drain tube.
(a) Connect the fuel drain tube (6) to the HPT/LPT valve actuator (1).
(b) TORQUE the union nut to between 212 and 195 lbf.in (2.40 and 2.20 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(3) Connect the fuel tube.
(a) Install the new AIPC 75-24-52-80-090 PACKING (2) on the pressure fitting (25).
(b) Connect the fuel tube (3) to the HPT/LPT valve actuator (1).
(c) TORQUE the union nut to between 475 and 425 lbf.in (5.37 and 4.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(4) Connect the harness core wiring (19) to the HPT/LPT valve actuator (Ref. AMM TASK 70-23-15-912-010) and
Subtask 75-24-52-410-052-A ** ON A/C NOT FOR ALL (1) Connect the fuel tube.
(a) Install the new AIPC 75-24-52-80-100 PACKING (5) on the return fitting (24).
(b) Connect the fuel tube (4) to the HPT/LPT valve actuator (1).
(c) TORQUE the union nut to between 360 and 330 lbf.in (4.07 and 3.73 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (2) Connect the drain tube.
(a) Connect the fuel drain tube (6) to the HPT/LPT valve actuator (1).
(b) TORQUE the union nut to between 212 and 195 lbf.in (2.40 and 2.20 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (3) Connect the fuel tube.
(a) Install the new AIPC 75-24-52-80-090 PACKING (2) on the pressure fitting (25).
(b) Connect the fuel tube (3) to the HPT/LPT valve actuator (1).
(c) TORQUE the union nut to between 475 and 425 lbf.in (5.37 and 4.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (4) Connect the harness core wiring (19) to the HPT/LPT valve actuator (Ref. AMM TASK 70-23-15-912-010) and
G. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser half (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
Subtask 75-24-52-440-051-A ** ON A/C NOT FOR ALL Subtask 75-24-52-790-050-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser half (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
I. Do the Leak Test
(1) Do an Idle Leak Check (Ref. AMM TASK 71-00-00-710-012) or:
5. Close-up(1) Do an Idle Leak Check (Ref. AMM TASK 71-00-00-710-012) or:
NOTE: A dry motor leak check (Ref. AMM TASK 71-00-00-710-045) may be used to check for leaks, but this must be followed by an idle leak check (Ref. AMM TASK 71-00-00-710-012).
(2) Do an operational test of the FADEC (Ref. AMM TASK 73-22-00-710-040) and make sure that, on CFDS, no faults related to the HPT/LPT valve actuator are shown. Subtask 75-24-52-410-050-A ** ON A/C NOT FOR ALL
HPT/LPT Valve Actuator