Removal of the Aileron-Hinge Support Frames 1, 2, 3, 4 and 5
TASK 57-51-31-000-001-A
Removal of the Aileron-Hinge Support Frames 1, 2, 3, 4 and 5
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 57-51-31-941-050-A
[Rev.10 from 2021]
2026.04.01 02:15:12 UTC
Removal of the Aileron-Hinge Support Frames 1, 2, 3, 4 and 5
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
CAUTION:
BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
1. Reason for the Job- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803500001 | 1 | LOCKING TOOL ZERO POS |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 575AT, 575JB, 575KB, 575LB, 575MB, 675AT, 675JB, 675KB, 675LB, 675MB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-34-24-869-002-A | Aircraft Grounding (Earthing) for the Maintenance Operations |
| TASK 12-34-24-869-002-A-01 | Aircraft Grounding (Earthing) during Transit, Turnaround or Overnight Stop |
| TASK 27-14-41-000-001-A | Removal of the Aileron |
| TASK 27-50-00-866-009-A | Retraction of the Flaps on the Ground |
| TASK 27-50-00-866-009-A-01 | Retraction of the Flaps/Slats on the Ground |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 57-51-37-000-005-A | Removal of the Access Panels 575KB(675KB), 575LB(675LB), 575MB(675MB) |
| TASK 57-51-37-000-006-A | Removal of the Access Panel 575JB(675JB) |
| TASK 57-51-37-000-007-A | Removal of the Access Panel |
Subtask 57-51-31-941-050-A
A. Safety Precautions
(1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(2) Put WARNING NOTICE(S) in the cockpit to tell persons not to operate the flaps or slats.
Subtask 57-51-31-860-050-A (1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(2) Put WARNING NOTICE(S) in the cockpit to tell persons not to operate the flaps or slats.
B. Aircraft Maintenance Configuration
(2) Install the 98D27803500001 LOCKING TOOL ZERO POS on the flap slat control lever.
(3) Make sure the aicraft is electrically grounded (Ref. AMM TASK 12-34-24-869-002).
(4) Depressurise the Green and the Blue hydraulic systems (Ref. AMM TASK 29-10-00-864-001) and (Ref. AMM TASK 29-10-00-864-003).
(5) Depressurise the applicable hydraulic reservoir (Ref. AMM TASK 29-14-00-614-001).
(6) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 57-51-31-865-050-A WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Make sure that the flaps are retracted fully (Ref. AMM TASK 27-50-00-866-009). (2) Install the 98D27803500001 LOCKING TOOL ZERO POS on the flap slat control lever.
(3) Make sure the aicraft is electrically grounded (Ref. AMM TASK 12-34-24-869-002).
(4) Depressurise the Green and the Blue hydraulic systems (Ref. AMM TASK 29-10-00-864-001) and (Ref. AMM TASK 29-10-00-864-003).
(5) Depressurise the applicable hydraulic reservoir (Ref. AMM TASK 29-14-00-614-001).
(6) Remove the safety collar from the circuit breakers 9CV and 11CV.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 57-51-31-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/WTB/SLT/SYS2 | 11CV | P19 |
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| 122VU | FLIGHT CONTROLS/WTB/SLT/SYS1 | 9CV | S06 |
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT) in position below the applicable aileron, zone 575(675).
(2) Remove the applicable access panels:
(a) For the left wing remove:
4. Procedure(1) Put the ACCESS PLATFORM 3M (10 FT) in position below the applicable aileron, zone 575(675).
(2) Remove the applicable access panels:
(a) For the left wing remove:
- 575AT (Ref. AMM TASK 57-51-37-000-007)
- 575JB (Ref. AMM TASK 57-51-37-000-006)
- 575KB 575LB 575MB (Ref. AMM TASK 57-51-37-000-005).
- 675AT (Ref. AMM TASK 57-51-37-000-007)
- 675JB (Ref. AMM TASK 57-51-37-000-006)
- 675KB 675LB 675MB (Ref. AMM TASK 57-51-37-000-005).
CAUTION:
BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
Subtask 57-51-31-020-050-E - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
A. Removal of the Aileron-Hinge Support Frames 1, 2 and 3
(1) Remove and discard the cotter pins (2), (4), (10), (15), (18), (22) and (26).
(2) Remove and retain the nut (3) and the bolt (1). Disconnect the strut (32) at its rear end.
(3) Make a note of the quantity of washers (6), (9) and (14) between the tie-beam assembly (31) and the support frames (7), (12) and (17).
(4) Remove and retain the nuts (5), (11) and (16) and the bolts (8), (13) and (33). Remove and retain the tie-beam assembly (31) and the washers (6), (9) and (14) from the support frames (7), (12) and (17).
(5) Remove and retain the items that follow:
Subtask 57-51-31-020-051-B (1) Remove and discard the cotter pins (2), (4), (10), (15), (18), (22) and (26).
(2) Remove and retain the nut (3) and the bolt (1). Disconnect the strut (32) at its rear end.
(3) Make a note of the quantity of washers (6), (9) and (14) between the tie-beam assembly (31) and the support frames (7), (12) and (17).
(4) Remove and retain the nuts (5), (11) and (16) and the bolts (8), (13) and (33). Remove and retain the tie-beam assembly (31) and the washers (6), (9) and (14) from the support frames (7), (12) and (17).
(5) Remove and retain the items that follow:
- the nuts (19), (23) and (27)
- the washers (20), (24), (28)
- the bolts (21), (25) and (30)
- the support frames (7), (12) and (17).
NOTE: The bracket (29) must stay in position.
B. Removal of the Aileron-Hinge Support Frames 4 and 5
(1) Remove and discard the cotter pins (11) and (14).
(2) Remove and retain the nuts (5) and (6) and the bolts (3) and (9). Disconnect the bonding leads (2), (7) and (10) from the support frames (4) and (8).
(3) Remove and retain the items that follow:
(1) Remove and discard the cotter pins (11) and (14).
(2) Remove and retain the nuts (5) and (6) and the bolts (3) and (9). Disconnect the bonding leads (2), (7) and (10) from the support frames (4) and (8).
(3) Remove and retain the items that follow:
- the nuts (12) and (15)
- the bolts (1) and (13)
- the support frames (4) and (8).
Aileron-Hinge Support Frames 1, 2 and 3 - Location and Detail