W DOC AIRBUS | AMM A320F

Detailed Inspection of Front Spar Joint at RIB 24, Aft Face


TASK 57-21-00-220-805-A
Detailed Inspection of Front Spar Joint at RIB 24, Aft Face


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 550
ZONE: 650
1. Reason for the Job

Refer to the MPD TASK: 572172-01
DETAILED INSPECTION OF FRONT SPAR JOINT AT RIB 24, AFT FACE.

NOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)
No specific
AR
LIGHT SOURCE - SPARK-PROOF
No specific
AR
MIRROR - INSPECTION, FLEXIBLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
98D27803500001
1
LOCKING TOOL ZERO POS
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
550
VENT SURGE TANK
650
VENT SURGE TANK
550CB, 650CB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-11-28-650-003-A
Pressure Refuel with Automatic Control
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 28-12-45-000-001-A
Removal of the Panel Assembly
TASK 28-12-45-400-002-A
Installation of the Panel Assembly
TASK 28-25-00-650-001-A
Pressure Defuel
TASK 28-25-00-650-003-A
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-650-003-A-01
To Drain Remaining Fuel from the Wing Tanks and the Center Tank
TASK 28-25-00-869-001-A
Fuel Transfer
SRM 572100
3. Job Set-up
Subtask 57-21-00-941-107-A
A. Safety Precautions
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
   (1) You must obey the fuel safety procedures when you do work in a fuel tank (Ref. AMM TASK 28-10-00-910-001).
   (2) Install the 98D27803500001 LOCKING TOOL ZERO POS on the flap/slat control lever.
   (3) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the flaps or slats.
   (4) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
Subtask 57-21-00-650-100-A
B. Fuel Configuration
   (1) Defuel the applicable fuel tank (Ref. AMM TASK 28-25-00-650-001).
   (2) Drain the remaining fuel from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
Subtask 57-21-00-010-099-A
C. Get Access
   (1) Put an ACCESS PLATFORM 4M (13 FT) in position:
     (a) For the left wing, below zone 550.
     (b) For the right wing, below zone 650.
   (2) Remove the applicable access panel (Ref. AMM TASK 28-12-45-000-001):
     (a) For the left wing, remove 550CB.
     (b) For the right wing, remove 650CB.
4. Procedure
Subtask 57-21-00-110-095-A
A. Preparation for Inspection
   (1) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) , made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean the applicable inspection area.
Subtask 57-21-00-220-053-A
B. Detailed Inspection of Front Spar Joint at RIB 24, Aft Face
   (1) Use a LIGHT SOURCE - SPARK-PROOF to light the applicable inspection area and if necessary, use a MIRROR - INSPECTION, FLEXIBLE.
   (2) Examine the aft face of the front spar joint at RIB 24 and make sure that:
  • There is no corrosion
  • There is no damage
  • There are no scratches or scores
  • There are no loose or damaged fasteners
  • The surface protection is in the correct condition.
NOTE: If necessary, refer to the SRM 572100 for the correct repair procedure.
5. Close-up
Subtask 57-21-00-410-091-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable access panel (Ref. AMM TASK 28-12-45-400-002):
     (a) For the left wing, install 550CB.
     (b) For the right wing, install 650CB.
Subtask 57-21-00-650-101-A
B. Fuel Configuration
   (1) Refuel (Ref. AMM TASK 12-11-28-650-003), defuel (Ref. AMM TASK 28-25-00-650-001) or transfer fuel (Ref. AMM TASK 28-25-00-869-001) as necessary.
Subtask 57-21-00-942-102-A
C. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the access platform(s).
   (3) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the flap/slat control lever.
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.