Close the FWD or Aft Cargo-Compartment Door with the Crane
TASK 52-30-00-860-009-A
Close the FWD or Aft Cargo-Compartment Door with the Crane
To close the FWD and/or aft cargo-compartment door(s) (referred to as cargo door(s)) with the crane (auxiliary operation) if the two door actuators are deactivated.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 52-30-00-860-060-A
Subtask 52-30-00-410-055-A
Subtask 52-30-00-010-058-A
[Rev.10 from 2021]
2026.04.01 01:40:36 UTC
Close the FWD or Aft Cargo-Compartment Door with the Crane
CAUTION:
YOU MUST CLOSE THE CARGO COMPARTMENT DOORS BEFORE THE WIND SPEED IS MORE THAN 65 KNOTS TO PREVENT DAMAGE TO THE DOOR OR TO THE AIRCRAFT STRUCTURE.
1. Reason for the JobTo close the FWD and/or aft cargo-compartment door(s) (referred to as cargo door(s)) with the crane (auxiliary operation) if the two door actuators are deactivated.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | CRANE 200KG (440 LB) |
| 98A52008509000 | 1 | SLING-UNIVERSAL,DOORS |
| 98D52307524000 | 1 | STRUT-SUPPORT,CARGO DOORS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 11-00-00-000-004-A | Removal of the Hoisting-Point Cover Patches |
| TASK 11-00-00-400-022-A | Installation of the Hoisting-Point Cover Patches |
| TASK 52-30-00-080-001-A | Removal of the Safety Support Equipment |
| TASK 52-30-00-480-001-A | Installation of the Safety Support Equipment |
| TASK 52-36-18-000-001-A | Removal of the Door Actuator |
Subtask 52-30-00-860-060-A
A. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the FWD or aft cargo-compartment door (referred to as the cargo door).
(2) Put a CRANE 200KG (440 LB) in position at the related cargo door.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the FWD or aft cargo-compartment door (referred to as the cargo door).
(2) Put a CRANE 200KG (440 LB) in position at the related cargo door.
Subtask 52-30-00-410-055-A
A. Installation of the Hoisting Sling
(2) Put the ring of the turnbuckle (7) on the remaining hook of the three-leg sling (8).
(3) Remove the self-adhesive disk (3) from the hoisting point (1) and discard the self-adhesive disk (3) (Ref. AMM TASK 11-00-00-000-004).
(4) Remove the plastic cap (2) from the hoisting point (1).
(5) Install the ring bolt (5) with the rubber washer (4) in the hoisting point (1). Tighten the ring bolt (5) only with your hand.
(6) Attach the rope (6) to the ring of the ring bolt (5).
(7) Attach the end of the rope (6) to the hook of the turnbuckle (7).
(8) Carefully operate the crane until the leg of the hoisting sling is under load.
Subtask 52-30-00-869-063-B NOTE: The hoisting sling of the cargo doors (PN 98A52008509040) is part of the 98A52008509000 SLING-UNIVERSAL,DOORS. The hoisting sling includes the three-leg sling (PN 98A52008509104), the turnbuckle (PN 98A52008509100), the rope (PN 98A52008509504) and the ring bolt (PN 98A52008509102).
(1) Attach the ring of the three-leg sling (8) to the crane and put two of the three hooks on the ring. (2) Put the ring of the turnbuckle (7) on the remaining hook of the three-leg sling (8).
(3) Remove the self-adhesive disk (3) from the hoisting point (1) and discard the self-adhesive disk (3) (Ref. AMM TASK 11-00-00-000-004).
(4) Remove the plastic cap (2) from the hoisting point (1).
(5) Install the ring bolt (5) with the rubber washer (4) in the hoisting point (1). Tighten the ring bolt (5) only with your hand.
(6) Attach the rope (6) to the ring of the ring bolt (5).
(7) Attach the end of the rope (6) to the hook of the turnbuckle (7).
(8) Carefully operate the crane until the leg of the hoisting sling is under load.
B. Close the Cargo Door with the Crane
(2) Remove the two door actuators of the related cargo door (Ref. AMM TASK 52-36-18-000-001).
(3) Remove the support struts from the cargo door and the fuselage frames (Ref. AMM TASK 52-30-00-080-001).
(4) Remove the access platform(s).
(5) Operate the crane and the cargo door moves slowly down to its vertical position.
(6) Push the cargo door manually into the fuselage opening until you can operate the door handle.
(7) Push the door handle down to the LOCKED position and push it into the recess of the door structure.
(8) Make sure that the green mark of each lock cam comes into view on the indication windows of the access panel 825AR and/or 826AR.
5. Close-upCAUTION:
YOU MUST CLOSE THE CARGO COMPARTMENT DOORS BEFORE THE WIND SPEED IS MORE THAN 65 KNOTS TO PREVENT DAMAGE TO THE DOOR OR TO THE AIRCRAFT STRUCTURE.
(1) Make sure that the opened cargo door is safetied with the 98D52307524000 STRUT-SUPPORT,CARGO DOORS (Ref. AMM TASK 52-30-00-480-001). (2) Remove the two door actuators of the related cargo door (Ref. AMM TASK 52-36-18-000-001).
(3) Remove the support struts from the cargo door and the fuselage frames (Ref. AMM TASK 52-30-00-080-001).
(4) Remove the access platform(s).
(5) Operate the crane and the cargo door moves slowly down to its vertical position.
(6) Push the cargo door manually into the fuselage opening until you can operate the door handle.
(7) Push the door handle down to the LOCKED position and push it into the recess of the door structure.
(8) Make sure that the green mark of each lock cam comes into view on the indication windows of the access panel 825AR and/or 826AR.
Subtask 52-30-00-010-058-A
A. Removal of the Hoisting Sling
(1) Remove the end of the rope (6) from the hook of the turnbuckle (7).
(2) Remove the rope (6) from the ring of the ring bolt (5).
(3) Remove the ring of the turnbuckle (7) from the hook of the three-leg sling (8).
(4) Remove the ring bolt (5) with the rubber washer (4) from the hoisting point (1).
(5) Remove the ring of the three-leg sling (8) from the crane.
(6) Install the plastic cap (2) in the hoisting point (1).
(7) Install the new self-adhesive disk (3) on the hoisting point (1) (Ref. AMM TASK 11-00-00-400-022).
(1) Remove the end of the rope (6) from the hook of the turnbuckle (7).
(2) Remove the rope (6) from the ring of the ring bolt (5).
(3) Remove the ring of the turnbuckle (7) from the hook of the three-leg sling (8).
(4) Remove the ring bolt (5) with the rubber washer (4) from the hoisting point (1).
(5) Remove the ring of the three-leg sling (8) from the crane.
(6) Install the plastic cap (2) in the hoisting point (1).
(7) Install the new self-adhesive disk (3) on the hoisting point (1) (Ref. AMM TASK 11-00-00-400-022).
Auxiliary Operation