Visual Inspection of the APU Surge Duct (131-9(A))
TASK 49-51-52-200-002-A
Visual Inspection of the APU Surge Duct (131-9(A))
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-51-52-860-061-A ** ON A/C NOT FOR ALL
Subtask 49-51-52-210-054-A ** ON A/C NOT FOR ALL
Subtask 49-51-52-410-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:31:19 UTC
Visual Inspection of the APU Surge Duct (131-9(A))
WARNING:
DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 49-51-52-000-006-A | Removal of the APU Surge Duct (131-9(A)) |
| TASK 49-51-52-400-004-A | Installation of the APU Surge Duct (131-9(A)) |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 49-51-52-860-061-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.
(3) Put the WARNING NOTICE(S) on panel 25VU to tell persons not to start the APU.
(4) Depressurize the aircraft hydraulic systems
(Ref. AMM TASK 29-00-00-864-001).
Subtask 49-51-52-865-065-A ** ON A/C NOT FOR ALL (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.
(3) Put the WARNING NOTICE(S) on panel 25VU to tell persons not to start the APU.
(4) Depressurize the aircraft hydraulic systems
(Ref. AMM TASK 29-00-00-864-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-51-52-010-058-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR and safety them in the open position (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control SW 11LJ to the ON position.
(4) Remove the surge duct (Ref. AMM TASK 49-51-52-000-006).
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR and safety them in the open position (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control SW 11LJ to the ON position.
(4) Remove the surge duct (Ref. AMM TASK 49-51-52-000-006).
Subtask 49-51-52-210-054-A ** ON A/C NOT FOR ALL
A. Inspection of the APU Surge Duct
(1) Examine the surge duct (7) for damage, cracks and discoloration. If the surge duct is defective, replace the surge duct.
(2) Examine the surge duct bracket (8) for damage and cracks.
5. Close-up(1) Examine the surge duct (7) for damage, cracks and discoloration. If the surge duct is defective, replace the surge duct.
(2) Examine the surge duct bracket (8) for damage and cracks.
- A 20 days inspection interval should be used as the allowable replacement interval if a duct is found with both legs cracked.
- A 70 days inspection interval should be used as the allowable replacement interval if a duct is found with one bracket leg cracked.
Subtask 49-51-52-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the surge duct (Ref. AMM TASK 49-51-52-400-004).
(3) Set the LIGHT control SW 11LJ to the OFF position.
(4) Close the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(6) Remove the access platform(s).
Subtask 49-51-52-865-066-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the surge duct (Ref. AMM TASK 49-51-52-400-004).
(3) Set the LIGHT control SW 11LJ to the OFF position.
(4) Close the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(6) Remove the access platform(s).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-51-52-860-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Aircraft Maintenance Configuration
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Remove the WARNING NOTICE(S).
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Remove the WARNING NOTICE(S).
APU Surge Duct (131-9(A))