Reactivation of the Normal Braking - After disconnection of the Green Hydraulic Supply
TASK 32-42-00-440-002-A
Reactivation of the Normal Braking - After disconnection of the Green Hydraulic Supply
1. Reason for the Job
MMEL 32-42-02A
GREEN SYSTEM BRAKE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-42-00-941-057-A
Subtask 32-42-00-440-054-A
Subtask 32-42-00-860-077-A
[Rev.10 from 2021]
2026.04.01 00:47:27 UTC
Reactivation of the Normal Braking - After disconnection of the Green Hydraulic Supply
1. Reason for the Job
MMEL 32-42-02A
GREEN SYSTEM BRAKE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 32-11-12-400-001-A | Installation of the MLG Hydraulic Dressings |
| TASK 32-42-00-710-001-A | Operational Check of the Normal Braking System |
| TASK 32-42-00-870-001-A | Bleeding of the Normal Braking at the Brake Units |
Subtask 32-42-00-941-057-A
A. Safety Precautions
(1) Put the WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever and the brake pedals.
Subtask 32-42-00-860-076-A (1) Put the WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever and the brake pedals.
B. Aircraft Maintenance Configuration
(1) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
(2) Parking brake configuration
Subtask 32-42-00-865-078-A (1) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
(2) Parking brake configuration
CAUTION:
MAKE SURE THAT ALL THE PISTONS OF THE BRAKE ARE IN THE RELEASED POSITION.
(a) Make sure that the parking brake control-switch is set to OFF before you do this procedure. C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
Subtask 32-42-00-440-054-A
A. Reactivation after Isolation of the Green hydraulic supply
(2) Remove the adhesive tape from the knurled sleeve (2).
(3) Connect the knurled sleeve (2) to the Green half-coupling (1).
(4) Bleed the Green braking system at the related brake (Ref. AMM TASK 32-42-00-870-001).
Subtask 32-42-00-440-059-A WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Remove and discard the lockwire from the knurled sleeve (2). (2) Remove the adhesive tape from the knurled sleeve (2).
(3) Connect the knurled sleeve (2) to the Green half-coupling (1).
(4) Bleed the Green braking system at the related brake (Ref. AMM TASK 32-42-00-870-001).
B. Reactivation of the Wheel Brake with Disconnection of the Flexible Hoses from the Normal Braking System if there is a Leak
(1) Depressurize the Green hydraulic reservoirs (Ref. AMM TASK 29-14-00-614-001).
(2) Remove the blanking caps from the union (5).
(3) Install the flexible hose (4) on the flexible hose (1) connection and on the union (5) (Ref. AMM TASK 32-11-12-400-001).
(4) Install the flexible hose (1) on the brake hydraulic self-sealing-coupling and on the flexible hose (4) connection (Ref. AMM TASK 32-11-12-400-001).
(5) Bleed the brake unit (Ref. AMM TASK 32-42-00-870-001).
Subtask 32-42-00-710-059-A (1) Depressurize the Green hydraulic reservoirs (Ref. AMM TASK 29-14-00-614-001).
(2) Remove the blanking caps from the union (5).
(3) Install the flexible hose (4) on the flexible hose (1) connection and on the union (5) (Ref. AMM TASK 32-11-12-400-001).
(4) Install the flexible hose (1) on the brake hydraulic self-sealing-coupling and on the flexible hose (4) connection (Ref. AMM TASK 32-11-12-400-001).
(5) Bleed the brake unit (Ref. AMM TASK 32-42-00-870-001).
C. Test
(1) Do the operational test of the normal braking system (Ref. AMM TASK 32-42-00-710-001).
(2) During this test, make sure that there are no leaks on the hydraulic connector.
5. Close-up(1) Do the operational test of the normal braking system (Ref. AMM TASK 32-42-00-710-001).
(2) During this test, make sure that there are no leaks on the hydraulic connector.
Subtask 32-42-00-860-077-A
A. Put the aircraft back to its initial configuration.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Remove the temporary placard which tells that the normal braking is not operational.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Remove the temporary placard which tells that the normal braking is not operational.
Normal Brake Deactivation