Removal of the NLG Torque-Tube Assembly
TASK 32-33-18-000-801-A
Removal of the NLG Torque-Tube Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-33-18-861-051-A Subtask 32-33-18-941-050-A
Subtask 32-33-18-480-052-A
[Rev.10 from 2021]
2026.04.01 12:31:28 UTC
Removal of the NLG Torque-Tube Assembly
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| No specific | 2 | WEDGE - NON METALLIC |
| 98A32301000000 | 2 | RIGGING PIN |
| 98D32203502000 | AR | SAFETY PIN - NLG DOOR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-481-002-A | Installation of the Safety Devices on the Landing Gear Doors |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
Subtask 32-33-18-861-051-A Subtask 32-33-18-941-050-A
B. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Install the ground safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On right-center instrument panel 400VU:
Subtask 32-33-18-010-050-A (1) Put the SAFETY BARRIER(S) in position.
(2) Install the ground safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On right-center instrument panel 400VU:
- Make sure that the landing-gear control lever is in the DOWN position.
- Put a WARNING NOTICE(S) in position to tell persons not to operate the landing gear.
C. Get Access
(1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Install a 98D32203502000 SAFETY PIN - NLG DOOR in each NLG door (Ref. AMM TASK 32-00-00-481-002).
(3) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 32-33-18-865-050-A (1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Install a 98D32203502000 SAFETY PIN - NLG DOOR in each NLG door (Ref. AMM TASK 32-00-00-481-002).
(3) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
D. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
Subtask 32-33-18-480-052-A
A. Installation of the Rigging Pins
(1) Put the 98A32301000000 RIGGING PIN in location PIN 1.
(a) Make sure that the door-uplock input lever is locked.
(2) Put the 98A32301000000 RIGGING PIN in location PIN 2.
(a) Make sure that the bellcrank is locked.
Subtask 32-33-18-020-050-A (1) Put the 98A32301000000 RIGGING PIN in location PIN 1.
(a) Make sure that the door-uplock input lever is locked.
(2) Put the 98A32301000000 RIGGING PIN in location PIN 2.
(a) Make sure that the bellcrank is locked.
B. Removal of the NLG Torque-Tube Assembly
(1) Remove and discard the cotter pins (6) and (20).
(2) Remove the nut (7), washer (5) and bolt assembly (4).
(3) Disconnect the rod (23) from the rear end of the torque tube assembly (8).
(4) If necessary, remove the shouldered bushings (22) and (24) from the rear end of the torque tube assembly (8).
(5) Remove the nut (21), washer (19) and bolt assembly (15).
(6) Disconnect the rod (17) from the forward end of the torque tube assembly (8).
(7) If necessary, remove the shouldered bushings (16) and (18) from the forward end of the torque tube assembly (8).
(8) Remove and discard the cotter pin (11).
(9) Remove the nut (12) and the washer (13).
(10) Remove the nuts (10) and the bolts (9) and release the forward bearing assembly (14) from the bracket.
(11) Remove the forward end of the torque tube assembly (8) from its position.
(12) Remove the rear end of the torque tube assembly (8) from the rear bearing assembly (2).
(13) If necessary, remove the bolts (3) and the nuts (1) and release the rear bearing assembly (2) from its position.
(1) Remove and discard the cotter pins (6) and (20).
(2) Remove the nut (7), washer (5) and bolt assembly (4).
(3) Disconnect the rod (23) from the rear end of the torque tube assembly (8).
(4) If necessary, remove the shouldered bushings (22) and (24) from the rear end of the torque tube assembly (8).
(5) Remove the nut (21), washer (19) and bolt assembly (15).
(6) Disconnect the rod (17) from the forward end of the torque tube assembly (8).
(7) If necessary, remove the shouldered bushings (16) and (18) from the forward end of the torque tube assembly (8).
(8) Remove and discard the cotter pin (11).
(9) Remove the nut (12) and the washer (13).
(10) Remove the nuts (10) and the bolts (9) and release the forward bearing assembly (14) from the bracket.
(11) Remove the forward end of the torque tube assembly (8) from its position.
(12) Remove the rear end of the torque tube assembly (8) from the rear bearing assembly (2).
(13) If necessary, remove the bolts (3) and the nuts (1) and release the rear bearing assembly (2) from its position.
Rigging Pins Location