Removal of the NLG Door Actuating Cylinder
TASK 32-31-16-000-001-A
Removal of the NLG Door Actuating Cylinder
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-31-16-860-051-A
Subtask 32-31-16-020-051-A
[Rev.10 from 2021]
2026.04.01 04:00:22 UTC
Removal of the NLG Door Actuating Cylinder
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
FIN: 2531GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | CONTAINER 5 L (1.32 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| 98D32303000000 | 1 | ADAPTER-WRENCH KIT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
Subtask 32-31-16-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
Subtask 32-31-16-010-050-A (1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001)
B. Get Access
(1) Open the doors of the nose landing gear (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone 123.
Subtask 32-31-16-941-050-A (1) Open the doors of the nose landing gear (Ref. AMM TASK 32-22-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone 123.
C. Safety Precautions
(1) In the cockpit, on the panel 400VU put WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever.
(2) Put the WARNING NOTICE(S) in position to tell persons not pressurize the Green hydraulic system:
(4) Put a CONTAINER 5 L (1.32 USGAL) in position below the NLG door actuating cylinder (2531GM).
4. Procedure(1) In the cockpit, on the panel 400VU put WARNING NOTICE(S) in position to tell persons not to operate the landing gear control lever.
(2) Put the WARNING NOTICE(S) in position to tell persons not pressurize the Green hydraulic system:
- on the panel 40VU in the cockpit,
- on the ground service panel of the Green hydraulic system access door (197CB).
(4) Put a CONTAINER 5 L (1.32 USGAL) in position below the NLG door actuating cylinder (2531GM).
Subtask 32-31-16-020-051-A
A. Removal of the NLG Door Actuating Cylinder
(2) Unlock the nut (1) and remove it with the 98D32303000000 ADAPTER-WRENCH KIT (98D32303000201).
(3) Remove and discard the lockwasher (2).
(4) Remove the washer (3) and the bolt (6) with the washer (7).
(5) Disconnect the rod end (8) from the lever (5).
(6) Remove the cotter pin (12) and discard it, remove the nut (13) and the washer (14).
(7) Remove the bolt (10) and disconnect the actuating cylinder from the support (16).
(8) Remove the actuating cylinder (17).
WARNING:
MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY PINS ARE INSTALLED.
(1) Disconnect the hydraulic lines (9) and (11) and put the PLUG - BLANKING is position. (2) Unlock the nut (1) and remove it with the 98D32303000000 ADAPTER-WRENCH KIT (98D32303000201).
(3) Remove and discard the lockwasher (2).
(4) Remove the washer (3) and the bolt (6) with the washer (7).
(5) Disconnect the rod end (8) from the lever (5).
(6) Remove the cotter pin (12) and discard it, remove the nut (13) and the washer (14).
(7) Remove the bolt (10) and disconnect the actuating cylinder from the support (16).
(8) Remove the actuating cylinder (17).
NLG Door Actuating Cylinder