W DOC AIRBUS | AMM A320F

Deactivation of LGCIU-2


TASK 32-31-00-040-804-A
Deactivation of LGCIU-2


ZONE: 210
FIN: 5GA2
1. Reason for the Job
MMEL 32-31-01
LANDING GEAR CONTROL AND INTERFACE UNIT NO. 2 (FAA ONLY)
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
3. Job Set-up
Subtask 32-31-00-861-062-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 32-31-00-941-102-A
B. Safety Precautions
   (1) Obey the applicable safety precautions before you open the LGCIU circuit breaker (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-00-865-142-A
C. Table of the circuit breakers used in this procedure:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR33
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR32
4. Procedure
Subtask 32-31-00-040-055-A
A. Deactivation of LGCIU-2
   (1) Open, safety and tag this(these) circuit breaker(s):
  • 2GA
  • 59GA.
5. Close-up
Subtask 32-31-00-410-086-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
Subtask 32-31-00-860-152-A
B. Aircraft Maintenance Configuration
   (1) Make an entry in the logbook.
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.01 00:43:44 UTC