Removal of the RAT Delta Pressure Indicator
TASK 29-22-51-000-012-A
Removal of the RAT Delta Pressure Indicator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 29-22-51-860-103-A
Subtask 29-22-51-020-063-A
[Rev.10 from 2021]
2026.04.01 00:26:17 UTC
Removal of the RAT Delta Pressure Indicator
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CAP - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-22-00-869-005-A | Extension of the Ram Air Turbine (RAT) on the Ground |
Subtask 29-22-51-860-103-A
A. Aircraft Maintenance Configuration
(2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(3) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001).
Subtask 29-22-51-865-100-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(3) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001).
WARNING:
MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. AMM TASK 29-22-00-869-005). B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | D14 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYD/RAT/CTL | 2801GE | B13 |
| ** ON A/C ALL | |||
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| 121VU | HYDRAULIC/RAT/SPLY/EXTN/SOL1 | 2803GE | P33 |
Subtask 29-22-51-020-063-A
A. Removal of the Delta Pressure Indicator
(1) Remove the delta pressure indicator (3).
(2) Put a CAP - BLANKING in the open port of the RAT hydraulic pump housing (6).
(3) Remove and discard the packings (4) and (5) from the delta pressure indicator (3).
(4) Hold the delta pressure indicator (3) and cut the shrink tube (1).
(5) Remove and discard the dust cover (2).
(1) Remove the delta pressure indicator (3).
(2) Put a CAP - BLANKING in the open port of the RAT hydraulic pump housing (6).
(3) Remove and discard the packings (4) and (5) from the delta pressure indicator (3).
(4) Hold the delta pressure indicator (3) and cut the shrink tube (1).
(5) Remove and discard the dust cover (2).
RAT Delta Pressure Indicator