W DOC AIRBUS | AMM A320F

Installation of the Priority Valve of the Blue Hydraulic System


TASK 29-12-33-400-001-A
Installation of the Priority Valve of the Blue Hydraulic System


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 2064GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 1 L (1/4 USGAL)
No specific
2
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.90 and 0.80 m.daN (79.65 and 70.80 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
O-RINGS
AIPC 29-12-14-02-140
8
BACK-UP RINGS
AIPC 29-12-14-02-150
7
BACK-UP RINGS
AIPC 29-12-14-02-160
6
SQUARE-SECTION SEALS
AIPC 29-12-14-02-170
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-21-911-001-A
Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-863-003-A
Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A-01
Pressurize the Blue Hydraulic System with the Blue Electric Pump
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
3. Job Set-up
Subtask 29-12-33-860-051-A
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Make sure that the reservoir of the Blue hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the access panel 195BB is open.
   (5) Make sure that the CONTAINER 1 L (1/4 USGAL) is in position below the HP manifold.
   (6) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel
  • On the ground service panel of the Blue hydraulic system.
Subtask 29-12-33-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
123VUB HYD/ELEC PUMP2701GJAB09
4. Procedure
Subtask 29-12-33-560-050-A Subtask 29-12-33-420-050-A
B. Installation of the Priority Valve
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the priority valve (1) on the manifold.
   (4) Install the bolts (2) and the washers (3).
   (5) TORQUE the bolts (2) to between 0.90 and 0.80 m.daN (79.65 and 70.80 lbf.in ) T.
Subtask 29-12-33-790-050-A
C. Test
   (1) Pressurize the reservoir of the Blue hydraulic system (
Ref. AMM TASK 29-14-00-614-001).
   (2) Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
   (3) Remove the warning notices from the cockpit and the ground service panel.
   (4) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
   (5) Examine the connection of the priority valve (1) and make sure that there are no leaks.
   (6) Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).
5. Close-up
Subtask 29-12-33-410-050-A
A. Close Access
   (1) Remove the container.
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Close the access panel 195BB.
Subtask 29-12-33-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/LOW/LVL/IND1832GQN32
121VUHYDRAULIC/HYD/QTY/IND1831GQP35
123VUB HYD/ELEC PUMP2701GJAB09
[Rev.10 from 2021] 2026.04.01 08:02:46 UTC