W DOC AIRBUS | AMM A320F

Installation of the Check Valve Restrictor Tubes (for Engine 1)


TASK 29-11-49-400-007-A
Installation of the Check Valve Restrictor Tubes (for Engine 1)


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. Reason for the Job
This task is effective post SB RA32178-1
This task is for the installation of the check valve restrictor tubes for engine 1 1000EM1. For the installation of the check valve restrictor tubes for engine 2 1000EM2 (Ref.Task 29-13-49-400-00700).
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T
No specific
Torque wrench: range to between 100 and 85 lbf.in (1.13 and 0.96 m.daN ) T
No specific
Torque wrench: range to between 145 and 135 lbf.in (1.64 and 1.53 m.daN ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB, 437AL, 438AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-12-29-611-002-A
Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-11-00-710-001-A
Operational Test of the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 29-11-49-860-097-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
   (2) Make sure that the Green hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
  • on the ground service panel 197CB.
   (4) Make sure that the WARNING NOTICE(S) is (are) in position on the access door 195BB to tell persons not to pressurize the Green hydraulic reservoir.
Subtask 29-11-49-941-082-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
  • make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine 1.
   (2) Make sure that the engine 1 shutdown occurred not less than 5 minutes before you do this procedure.
   (3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
  • in the cockpit, on the HYD section of the overhead panel 40VU.
   (4) On the overhead maintenance panel 50VU:
  • make sure that the ON legend of the ENG/FADEC GND PWR/1 pushbutton switch is off.
   (5) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to energize the FADEC 1.
Subtask 29-11-49-865-067-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
Subtask 29-11-49-010-083-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the fan-cowl doors are open:
- 437AL 438AR (Ref. AMM TASK 71-13-00-010-040).
   (2) Make sure that the access door 195BB is open.
   (3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position at the engine.
4. Procedure
Subtask 29-11-49-420-072-A ** ON A/C NOT FOR ALL
A. Installation of the Check Valve Restrictor Tubes
   (1) Connect the tube (30) to the HCU. Do not torque the coupling nut at this time.
   (2) Put the clamps (10) on the tube (30). Install the bolts (5), washers (20) and nuts (25) that attach the clamps to the engine brackets at the flange STA199 (A2). (3 locations). Do not torque the nuts at this time.
   (3) Connect the tube (30) to the tube (15). Do not torque the coupling nut at this time.
   (4) Put the clamp (10) on the tube (15). Install the bolt (5), washer (20) and nut (25) that attach the clamp to the engine bracket at the flange STA199 (A2). Do not torque the nuts at this time.
   (5) Put the clamp (10) on the tube (15). Install the bolt (5), washer (20) and nut (25) that attach the clamp to the engine bracket at the flange STA185 (B5). Do not torque the nuts at this time.
   (6) Connect the tube (15) to the tee fitting on the upper case drain tube. Do not torque the coupling nut at this time.
   (7) Make sure that the tubes (15) and (30) are correctly aligned with each other, the HCU and the tee fitting on the upper case drain tube.
   (8) TORQUE the coupling nut on the tube (15) to between 145 and 135 lbf.in (1.64 and 1.53 m.daN ) T.
NOTE: Use a second wrench to hold the tee fitting when you torque the tube coupling nut.
   (9) TORQUE the coupling nuts on the two ends of the tube (30) to between 100 and 85 lbf.in (1.13 and 0.96 m.daN )
T.
NOTE: Use a second wrench to hold the tube (15) and the fitting on the HCU when you torque the tube coupling nut.
   (10) TORQUE the nut (25) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
T.
Subtask 29-11-49-865-115-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
Subtask 29-11-49-710-089-A ** ON A/C NOT FOR ALL
C. Operational Test
   (1) Do an operational test of the Green hydraulic system (
Ref. AMM TASK 29-11-00-710-001).
   (2) During the dry motoring of the engine 1, make sure that there are no leaks from the check valve restrictor tubes.
   (3) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
5. Close-up
Subtask 29-11-49-860-098-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
Subtask 29-11-49-410-067-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the fan-cowl doors:
- 437AL 438AR (Ref. AMM TASK 71-13-00-410-040).
   (2) Close the door 195BB.
Subtask 29-11-49-942-067-A ** ON A/C NOT FOR ALL
C. Safety Precautions
   (1) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 00:17:17 UTC