Installation of the Engine 1 Pump Suction Quick-Disconnect Coupling Half
TASK 29-11-39-400-041-A
Installation of the Engine 1 Pump Suction Quick-Disconnect Coupling Half
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-11-39-860-051-A ** ON A/C NOT FOR ALL
Subtask 29-11-39-420-051-A ** ON A/C NOT FOR ALL
Subtask 29-11-39-942-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:15:32 UTC
Installation of the Engine 1 Pump Suction Quick-Disconnect Coupling Half
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
FIN: 1038GM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB, 197CB, 437AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-12-29-611-002-A | Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-11-00-710-001-A | Operational Test of the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
Subtask 29-11-39-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration (Ref. AMM TASK 29-10-00-864-001).
(2) Make sure that the related hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position.
(4) Make sure that the left fan-cowl door 437AL is open (Ref. AMM TASK 71-13-00-010-040).
(5) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the hydraulic system:
(8) On maintenance panel 50VU:
4. Procedure(1) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration (Ref. AMM TASK 29-10-00-864-001).
(2) Make sure that the related hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position.
(4) Make sure that the left fan-cowl door 437AL is open (Ref. AMM TASK 71-13-00-010-040).
(5) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the hydraulic system:
- In the cockpit, on the HYD section of panel 40VU
- On the ground service panel of the Green hydraulic system, access door 197CB
- On access door 195BB of the Green hydraulic reservoir.
- Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine 1(2).
(8) On maintenance panel 50VU:
- Make sure that the ON legend of the related ENG FADEC GND PWR pushbutton switch is off.
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to supply power to the FADEC system.
- Make sure that the related ENG MASTER 1(2) switch is in the OFF position.
Subtask 29-11-39-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Engine 1 Pump Suction Quick-Disconnect Coupling Half
(1) Remove the protective covers from the suction hose, the coupling half (5) and the fluid disconnect panel.
(2) Install the coupling half (5) on the fluid disconnect panel. Tighten the coupling half with your hand.
(3) Connect the suction hose to the coupling half (5).
(4) TORQUE the coupling nut on the suction hose to between 10.17 and 9.04 m.daN (75.00 and 66.67 lbf.ft )
.
Subtask 29-11-39-710-051-A ** ON A/C NOT FOR ALL (1) Remove the protective covers from the suction hose, the coupling half (5) and the fluid disconnect panel.
(2) Install the coupling half (5) on the fluid disconnect panel. Tighten the coupling half with your hand.
(3) Connect the suction hose to the coupling half (5).
(4) TORQUE the coupling nut on the suction hose to between 10.17 and 9.04 m.daN (75.00 and 66.67 lbf.ft )
. NOTE: Use a second wrench to hold the coupling half (5) when you TORQUE the suction hose coupling nut.
B. Operational Test
(1) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(2) During the dry motoring, make sure that there are no leaks from the coupling half connections.
(3) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
5. Close-up(1) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(2) During the dry motoring, make sure that there are no leaks from the coupling half connections.
(3) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
Subtask 29-11-39-942-051-A ** ON A/C NOT FOR ALL
A. Remove the safety precautions
(1) Remove the access platform(s).
(2) Remove the container.
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the WARNING NOTICE(S).
Subtask 29-11-39-410-051-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Remove the container.
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the WARNING NOTICE(S).
Engine 1 Pump Suction Quick-Disconnect Coupling Half